ADO-PO section meeting
Safety Sub Section
Achievements
and Objectives for the coming months
O. beltramello
3/26/2016
General Safety
 LS1 safety supervision: Dimitar, Didier, Sergey, Maryia,
Natascia, Illona, Edward
Daily safety supervision, PPSPS and WPA
SLIMOS, OPM, EOD
 Upgrade of the safety systems: Sergey, Didier, Cedric
o Detector Safety System (upgrade on going)
o New Flammable Gas detection system (late)
o Upgrade of the centrale detection gas USA15
o Maintenance of the safety systems:
 Sniffers (Didier, Francesco, Gevorg, Fred, Cedric, Charles)
 Radiation Gate monitors (to be done)
 Foam system (to be done)
 Fire detection, gas, etc.. (on going)
3/26/2016
Radiation Protection
 RP calculations and ALARA budgets for the end of LS1 and future:
Irina, Natascia, Illona, Krzyztof
The comparison with the dose measured at start of LS1 are finished.
(We see a factor 2 maximum of difference between calculated and
measured).
We are currently upgrading the ATLAS FLUKA model.
Zoning calculations are on going up to 2035
A first estimation of the doses rates for
LS4 and LS5 have been performed
for ATLAS and for CMS (ECFA).
Preparation of the ATLAS closing period
New environmental dose rates calculations
are on going with revised luminosity and
upgraded model.
Participation to ITK upgrade studies and others ....
3/26/2016
Radiation Protection
 Remote Handling – Dimitar
Mantis robot has been
transferred to ATLAS
Testing of remote handling operations for ISOLDE and for BP operations
are on going in collaboration with Oxford Technology Company:
successfull BP VJ/VT flange opening with MASCOTT
3/26/2016
ATWPSS and EDUSAFE
 ATWPSS – Alex, Christos, Mark, Dimitar, Vit
Upgrade development of the ATWPSS on going
Miniaturization + “helmet case”
Integration of TETRA
 EDUSAFE –Lakshmi, Christos
EDUSAFE Network Coordinator
Research program on Augmented Reality Technologies
The project advance is progressing well :
Main system architecture is agreed
Network training and technical development progressing well
Next steps:
3/26/2016
Next consortium wide technical / training week in March 2014
Mid term review with EU commission June 2014
Visits
 60 years of CERN (All team)
September 2014, exact implication not yet clear.
3/26/2016