Status of FEE electronics

Download Report

Transcript Status of FEE electronics

Status of the LAV FEE
electronics
M. Raggi LNF
G. Corradi, C. Paglia, D. Tagnani
LNF SELF
PVWG WG
CERN 25/04/2011
1
Outline
• The FEE components
• Status of the FEE production
• Prospects for the rest of 2011
2
USB
Vth_H and Vth_L test points
and adjustSum
trimmers
1 to 16
Local
Control
CAN in, CAN out
Remote
Control
FEE LAV VME 9U
Sums 1 to 4, 5 to 8,
9 to 12, 13 to 16
Sum 17 to 32
Sums 17 to 20, 21 to 24,
25 to 28, 29 to 32
1 9U Boards components
# of
pieces
Status
±6 V voltage regulator
4
Produced
Time over threshold Mezzanine (2ch)
16
Produced
Sum of 4 mezzanines (8 sum 4 + 2 sum 16)
10
Produced
CPU board
1
Produced
Local CPU board
1
Produced
test pulse mezzanine board
1
On project
3
Mezzanine production status
• 100 ToT mezzanine already produced
– Each mezzanine has two channels
– All of them have been mounted
– To be tested (electric test and burn in)
• Enough to equip more than 5 FEE boards
4
Sum mezzanine
• Sum 4 analog signals
• 10 pieces already produced
• The boards have been mounted
– Needs electric and burn-in tests
5
Voltage regulator production
• Produce ±6V
• 10 pieces in production
– PCB delivery expected in 20 days
– Needs electric and burn-in tests
6
9U motherboard production
• The Gerber files have been sent to the firm
• A first bunch of 5 PCB boards will be
delivered at the mid of June
7
Other equipment
• ToT mezzanine test board
– Used to test the ToT mezzanine before the installation
– Allows to access both PCB sides
• Local thr setting boards
– Used to set the thr in absence of CPU remote
programming firmware
• 9U board front panel
– Prototype already produced
8
Future plans
• Receive and assemble a first full 9U FEE
prototype before the end of July.
• Test the system extensively during fall
• Validate the FEE before the end of November
2011
• Start a first massive production (1/2 of total)
before the end of 2011
9