Reporting ATN Implementation Status

Download Report

Transcript Reporting ATN Implementation Status

ATNICG/7 - IP/9
Agenda Item 3
07/03/12
ATS Message Handling System (AMHS)/
System Wide Information Management (SWIM)
Workshop and the Seventh Meeting of Aeronautical
Telecommunication Network Implementation Coordination Group of APANPIRG (ATNICG/7) Chiang
Mai, Thailand
5 – 9 March 2012
Presenter: Md. Rafiqul Islam
Deputy Director (Telecom)
Civil Aviation Authority of Bangladesh
Reporting ATN Implementation
Status
A project on ATN has been taken
 This ATN project will be
implemented at Hazrat Shahjalal
International Airport, Dhaka,
Bangladesh
Progress
– A Tender Evaluation Process on ATN
has been completed
Scope
The requirements and technical specification
defined by CAAB for establishment of the
following components of ATN in Bangladesh:
 ATN ground-ground router with wide area
network connections with two ATN backbones:
Bangkok and Mumbai
 AMHS including AFTN/AMHS gateway
 AFTN based AIDC to connect ATS centre of
Dhaka to those of Kolkata and Yangon
Scope
 The architecture, performance, reliability,
quality of service and security requirements of
the systems and the application programs shall
comply with ICAO SARPs and specifications
defined in ICAO Annex 10, Volume II, ICAO
Document 9880 and 9896.
 Router and AMHS shall be based on Internet
Protocol Suite (IPS), referred to as ATN/IPS, as
defined in ICAO Document 9896 and the AIDC
shall be based on AFTN
Attention Areas
 ATN will be implemented in CAA
Bangladesh within 6 months.