AEEC IPS Update
Download
Report
Transcript AEEC IPS Update
CP –WGI – 19/IP-xx
20-22 January 2016
International Civil Aviation Organization
INFORMATION PAPER
COMMUNICATIONS PANEL (CP)
WORKING GROUP I (WG-I)
Montreal, QC Canada 20-22 January 2016
Agenda Item 8: Any Other Business
AEEC IPS Update
(Prepared by Luc Emberger, Greg Saccone)
Presented by Greg Saccone
SUMMARY
This information paper gives an update of the current plans in AEEC to
progress the IPS for Aeronautical Safety Services standards
ACTION
The working group is invited to note the information presented.
10 Dec 15
10 Dec 15
AEEC IPS for Aeronautical Safety Services Update
• ARINC Project Initiation/Modification (APIM) to further define and specify
IPS was submitted to AEEC Systems Architecture and Interfaces (SAI)
Subcommittee, Feb 2015
• APIM was voted on at mid-term session in Sep 2015 and approved, with an
understanding that there would be two steps:
• Step 1: Develop a roadmap document and development plan, scheduled
completion Apr 2017
• Step 2: Execute the development plan and produce ARINC Project Paper 8XX,
Internet Protocol Suite (IPS) for Aeronautical Safety Services, anticipated
completion Apr 2019
• Kick-off webex held on 10 Dec 2015 (presentation follows)
• First face-face meeting scheduled at RTCA in Washington DC for 23-25
Feb 2016
10 Dec 15
Internet Protocol Suite (IPS) for Aeronautical
Safety Services
Kick off Webex - Step 1
10 Dec 15
AGENDA
•Introduction
•Objectives
•Planning of the activities
•Way of working
10 Dec 15
INTRODUCTION – APIM 15-004 adopted
Following APIM 15-004 adoption in September 2015 (AEEC Mid-Term
Session) a new group has been created: Internet Protocol Suite (IPS) for
Aeronautical Safety Services subcommittee
Co-Chairman: Greg Saccone, The Boeing Company
Co-Chairman: Luc Emberger, Airbus
• Goal: Develop an industry roadmap and a development plan for defining
IPS for Aeronautical Safety Services, including airborne, ground-based and
space-based communication systems, coordinating with aviation Standards
Development Organizations (SDOs), Air Navigation Service Providers
(ANSPs) and others with an interest.
• Scope: New network infrastructure for safety services (both air traffic
services (ATS) and aeronautical operational communications (AOC))
Non “safety” AOCs and Cabin IP Com are out of the scope of the WG
10 Dec 15
INTRODUCTION – A 2 step Approach, Focus on step 1
It is proposed that the IPS Subcommittee prepare a detailed technical
definition of IPS for aeronautical safety services in a new ARINC Standard, in
a 2 steps approach:
Step 1: (from now to April 2017) Roadmap for standardization and main
architecture impacts of IPS introduction
Step 2: (April 2017 to April 2019) Development of an ARINC Standard for
IPS
Step 1
The subcommittee will define the perimeter which needs to be standardized
for IPS (air-to-ground and end-to-end) and in which timeframe each part shall
be standardized by the appropriate standardization body (ICAO, RTCA,
EUROCAE, ARINC).
The output of the new subcommittee for Step 1 will be an ARINC Report
10 Dec 15
INTRODUCTION - participation
Commitment for Drafting and Meeting Participation
• Airlines: TBC
• Airframe Manufacturers: Boeing, Airbus
• Suppliers: Airtel ATN, GE Aviation, Honeywell, Rockwell
Collins, Thales
• Others: ARINC (RC-IMS), FAA, SITA, Inmarsat, Panasonic
10 Dec 15
OBJECTIVES
• The main outcome of the final report shall be a detailed roadmap
highlighting:
• What shall be standardized (equipment? Interfaces? Protocols?
Performances? Profiles?)
• Which body shall support the standardization (AEEC, ICAO, RTCA,
EUROCAE?)
• When the standardization shall be achieved?
• How the standards will be validated?
In order to build a valid roadmap, endorsed by all stakeholders, a set of topics
will need to be detailed in the report:
10 Dec 15
OBJECTIVES – Key topics (1/3)
Clarify and detail the scope to be addressed by ATN/IPS :
• Definition of long-term needs for IPS for aeronautical safety services
• What will be the “users” of IPS (ATC, AOC)?
• Which functional, performance and safety and data security requirements apply?
• Which communication means?
• Definition of mid-term opportunities
• Which applications and communication means
Identify the deployment roadmaps and their impacts on the solution:
• Deployment roadmaps (Europe and US) including transition phase during
which ACARS, ATN/OSI, and IPS will co-exist
• How aircraft equipped with ACARS, ATN/OSI and aircraft with IPS will be
accommodated?
10 Dec 15
OBJECTIVES – Key topics (2/3)
Describe Aircraft architecture :
• ATN/IPS integration in different types of airborne avionics (429 based,
AFDX based, others)
• Interfaces with the applications, with the radios, with the other systems
• Impact of data security requirements
• Multi-link considerations, how many stacks?
• Possible co-existence with ACARS and ATN/OSI datalinks ?
• Retrofit versus forward fit considerations
• Design Assurance level
• Security Assurance level
10 Dec 15
OBJECTIVES – Key topics (3/3)
Describe network end to end architecture:
• Mandatory requirements for interoperability (are RFCs sufficient?)
• Mobility, addressing requirements
• For AOC traffic
• For ATS traffic
• Security management – PKI considerations
Describe ground components:
• Ground gateways
• End systems
• Impact on existing ACARS and ATN/OSI ground-based infrastructure?
Standardization roadmap : What ? Who ? When?
10 Dec 15
PLANNING OF THE ACTIVITIES (Step 1)
2016
D
J
F
2017
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
Periodic telco/webex as needed
KOM
(Webex)
Open discussions
White-papers review
Agreement on the
report TOC and assign
chapters authoring
Discuss first draft
New white-papers and
First contributions review
Activity
Step 1: ARINC Report Standardization Roadmap for IPS
Meeting 4
Meeting 3
Meeting 2
Meeting 1
Step 1
Report
Final report ready
for submission
Consolidate
mature version
Mtgs
Mtg-Days
(Total)
Expected
Start Date
Expected Completion Date
5
10
Sept 2015
April 2017
10 Dec 15
PROPOSED WAY OF WORKING
Now:
• Call for contributions / white-papers, first thoughts focused on the key topics
identified earlier as inputs for the first F2F meeting early 2016 (Date TBD)
• Identify any other technical areas that need to be defined (i.e. ones that are not
mentioned in APIM)
• Establish boundaries between various bodies/committees
Next year:
• First draft report expected by Q4 2016
• Need to schedule synchronisation milestones with other bodies and initiatives
• ICAO
• EUROCAE/RTCA
• FAA/Europe ANSPs (NextGen /SESAR)
• ATN/IPS related projects: Validation initiatives, IRIS…
• Coordination as needed with other AEEC groups (SAI, DLK , DLK User Forum,
NIS, AGCS, AeroMACS WG)
10 Dec 15
Questions
Thank you!
Question?
10 Dec 15
Backup slides
Datalink Roadmap
2020
2015
DCL
B1
2030
2025
En-route
FAA
B2A
B2A or B3
B2
VHF Data/VDLM2
HF, Satcom Data 2
2035
Europe
FANS
?
?
2016
AeroMACS
2030
? LDACS
2017
Iridium NEXT
2028
2016
Inmarsat SBB/IRIS Precursor
Iris
Comm means
ACARS
?
ATN/OSI (Europe)
?
ATN/IPS
2019 – Standards
Available
2024
IOC (Boeing view)
2028-30
IOC (Airbus view)
Airborne ATS Router
10 Dec 15
Considerations regarding implementation of ATN/IPS on Aircraft
Aircraft Control Domain
(ACD) (without ATN/IPS)
FANS ATC
AOC
Applications
in ACD
Applications
Aircraft Control Domain
(ACD) with ATN/IPS
FANS ATC
Applications
?
Other
impacted
systems
FWS,
CMS,
DLCS
RMP, ..
AOC
Applications
in ACD
?
Security function?
ACARS
+ ATN/OSI
Router
ACARS
+ ATN/OSI
Router
ATN/IPS
Router
?
?
?
?
VHF
HF
SATCOM
VHF
HF
SATCOM
LDACS
Aeromacs
system
system
system
system
system
system
system
system
Envisaged Boeing IPS Architecture – Work to be Done
EFB
Display
CMC/
ACMF
Cabin
Systems
Unaffected Components
FMS
AOC/ATC
Future Comm Components
Changed/New Components
Changed/New Components
CMF
Comm Management
Media Routing Logic
Router Logic,
Media management
(High Level)
AOC
Dialog Service
Interfaces
ACARS
Over IP
ACARS
Network
ATN
Network
IP
Network
Red Text/Lines: areas to be defined
ACARS/IP
Profile
Network Profiles/
Specification, mobility
Network interfaces
(coordinated with relevant groups)
Air
HF
Ground
SDU
VDR
SBB/Iridium
AeroMACS
Certus/Other
LDACS
Ground Gateway
Comm
Service Provider
ANSPs,
AOCs
10 Dec 15
ANNEX
• ICAO Global Air Navigation Plan V4
ATN/IPS
LDACS,
AeroMACS
and Future
Satellite
Full 4D