Presentación de PowerPoint

Download Report

Transcript Presentación de PowerPoint

Presents
Buenavista Church Project
Palawan, Philippines
5 Reasons Why we should give
(2 Corinthians 8-9)
1. To follow the example of Jesus (8:9)
2. To help those in need (vs. 14)
3. To have a large crop (9:6)
4. Because God loves the one who gives gladly (vs. 7)
5. Because God supplies for all our needs (vs. 8)
5 Counsels on How we should give
(2 Corinthians 8-9)
1. First give yourselve to the Lord (8:5)
2. According to what you have (vs. 12)
3. With generosity (9:5)
4. As decided in your heart (vs. 7)
5. Cheerfully (vs. 7)
Buenavista
Puerto Princesa
Palawan Adventist Mission
• First church: 1947
• Central Luzon Conference > North Philippine Union
as attached district > Palawan Mission (2010)
• Churches: 109
• District Pastors: 16
• Membership: 19,059
• Population: 892.660
• Elementary Schools: 9
• Academy: 1 (NPUC)
• Hospital: 1 (NPUC)
Buenavista
• The Village
• 50 km northwest of Puerto Princesa (1,5 hours)
• 200 households: fishing and farming
• The Church
• 2007: crusade & first baptism (24 souls)
• 2009: AIIAS crusade (3 souls)
• 2010-2011: lot bought & “nipa” church was erected
• 2012: crusade by pastor (9 souls)
• 17 active members (7 families): Bro. Roger Giganto
• Central Palawan C district: Pr. Rudy Fajutagana
AIIAS Business Club Mission Trips
• 2010
• Indonesia: improved a Church: missing walls,
windows, doors, painting, and tile floor.
• 2011
• Malaysia: remodeled the computer lab of Sabah
Adventist School
• 2012
• Philippines
Project goals and objectives
• Goals
• Construction of a basic church structure.
• Evangelism: Bible studies at homes.
• Objectives
• Support the evangelism effort of the local Mission
(Palawan Adventist Mission).
• Provide an opportunity to the Business students
and AIIAS community, to engage in an outreach
program.
• Support AIIAS to fulfill its mission of “developing
leaders excelling in service to the church and
society”.
Project implementation
Phase 1
• Earth works: remove all structure, clean the construction area, level
the ground
• Lay foundations
• Set the structure and roofing
• Set the floor
Phase 2
• Set the walls 3.
Phase 3
• Doors and windows
• Facade
• Painting
Construction budget
Phases
USD
1 Foundation + floor + roof
16,335
2 Walls
6,670
3 Facade
6,780
TOTAL
29,805
If funds were not available, then the building size will be adjusted
and some materials (like steel) will be replaced by cheaper
alternatives (like wood).
Our commitment
• We will prepare a project report, including an expense
report compared with the budget, and narrative report
(including pictures).
• These reports will be available in the blog of the project
(http://PalawanMissionTrip.wordpress.com).
• Each donor will receive and email with the link to visit the
project report online.
The local contribution
• Local Church
• Labor
• Local Mission
• Engineering and architectural plan
• Obtaining the building permit
• Purchasing and transporting the materials for the construction
• Providing construction tools
• Transportation
• Accommodation
Video
• Show the video
Be part of it!