Programing the panel Via DLS2002 and TL250

Download Report

Transcript Programing the panel Via DLS2002 and TL250

TL250-Internet Communicator
Compatibility
Specifications
• 250mA @12 VDC current draw
• 12 VDC input voltage
• Size: 3.25” × 5.25” (8.3 × 13.3)cm
• Operating Temperature: 32°122°F (0°-49°C)
• Output Protocols: UDP/IP 10/100
BaseT half duplex
• Input Protocols: PC-Link (SIA
format)
• Connectors: 4-pin header for the
PC-Link and RJ-45 for Ethernet
•Network: Ethernet LAN/WAN 10
BaseT, 10/100 BaseT or 100 BaseT
•Downloading Support for PC4020
V3.3+/PC5020/PC1616/PC1832/PC1864
Control Panel: using DLS2002 and/or
DLS2002 System
Administrator software
•4 digital inputs (can be increased to 12
using the PC5108)
•Capable of sending alarm messages
to 2 e-mail addresses
Board Overview
PC Link Header to Panel
Network Connection
12VDC and GND
Keybus to PC5108
LED1 = Speed Status
(ON = 100Mbps Connection OFF = 10Mbps Connection)
LED2 = Activity Status (Displays Network Traffic RX/TX )
LED3 = Link Status (ON = Ethernet Present OFF =
Ethernet Absent)
Zone 1 - 4
Status LED
Flashes
Per sec.
1/3 Flash
1 Flash
2 Flash
3 Flash
4 Flash
5 Flash
6 Flash
7 Flash
8 Flash
9 Flash
10 Flash
11 Flash
12 Flash
13 Flash
TL250 Status
-Normal
-Network Absent
-Invalid Account
-Receiver 1 Absent
-Panel Absent
-Inputs Alarms
-FTC 1
-PC5108 Absent
-PC5108 Tamper
-FTC 2
-Key switch Arm
-Remote Programming
-Local Programming
-Receiver #2 Absent
Connecting to the panel
Connect PC-Link Cable
Connect Network Cable
12VDC and GND
Programming Requirements
Static IP Address
Programming
Dynamic IP Address
Programming
•IP address of TL250
•IP address of
Subnet Mask
•IP address of
DRL3IP
•IP address of
Network Gate
•Account Number
Example IP Address
192.168.0.99
IP address of
DRL3IP
255.255.255.0
209.202.119.7
Account Number
192.168.0.1
0000001234
Programming (4020)
Enter installer programming by pressing *8 followed by
your installers code
Select (00) <>
System Area
Scroll over to
Communicator and
press [*]
Select (01) <>
Comms Toggles
Press [*] to select
System Area
Select (04) <>
Communicator
Scroll until you see an
option for the T-Link
and press [*] to
enable the option
Select (00) <>
Installer Opt’s
Scroll over to Comms
Toggles and press [*]
Select Toggle <>
T-Link Enable Y
Programming continued…
Press [#] to Exit
Comms Toggles
Select (06) <>
T-Link Module
Select (01) <>
Comms Toggles
Enter a 3 digit Section
number followed by
the entry
Scroll over to T-Link
Module and press [*]
Select Entry #
Ent 001-999 _
Programming continued…
Select Entry #
Enter IP Address
Ent 001-999 001
192.168.000.099
Select Entry #
Enter IP Address
Ent 001-999 002
000.000.000.000
Select Entry #
Select Entry #1
Ent 001-999 003
Enter 00-FF 00
Select Entry #
Enter IP Address
Ent 001-999 007
000.000.000.000
Select Entry #
Enter IP Address
Ent 001-999 008
000.000.000.000
Enter the 12 digit IP Address of the TL250 followed
by [#]. This should be given to you by your IT
department. ENTER ALL ZERO’S FOR DHCP.
Enter the 12 digit Subnet Mask followed by [#]. This
should be given to you by your IT department. DO
NOT PROGRAM FOR DHCP
Enter the 6 digit account number for the TL250
followed by [#] of the TL250. This should be given
to you by your central station. If you account is only
4 digits, enter 00 00 00 then the 4 digit account
number
Enter the 12 digit IP Address of the DRL3IP
followed by [#]. This should be given to you by your
central station.
Enter the 12 digit IP Address of the Gateway
followed by [#]. This should be given to you by your
IT department. DO NOT PROGRAM FOR DHCP
Programming continued…
Select Entry #
Ent 001-999 999
Enter [999] to default
the TL250
Select Entry #1
Enter 00-FF 99
Enter [55], wait 30
seconds then press
[#] all the way out of
programming.
Optional - If Network Supervision is Required…
Select Entry #
Enter Hex Data
Ent 001-999 023
00
Enter [01] to enable Supervision for Network
Supervision. DO NOT PROGRAM FOR UNSUPERVISED ACCOUNTS
Optional - If 128 AES Encryption is Required…
Select Entry #
Enter Hex Data
Ent 001-999 004
0000000000000000
Select Entry #
Enter Hex Data
Ent 001-999 005
0000000000000000
Enter the FIRST 16 hexadecimal digits of the
Encryption key. This is provided to you by your
central station.
Enter the LAST 16 hexadecimal digits of the
Encryption key. This is provided to you by your
central station.
4020 Panel Programming
• Ref# 0004000000 Panel Tel number = CAAA
• Ref# 000400XX01 Comms Format = SIA FSK
• Ref# 000401 Auto SIA
=Y
• Ref# 000400XX02 Dialer Directions = Alarms Y etc…
• Ref# 000300 DLS Enabled* = Y *if downloading is required
Programming Power Series
TL250 Programming:
•Section 382 opt 5 PC-Link Active = enabled
•All TL250 programming in section [851]
•[001] –TL250 IP address, [002] –Subnet Mask, [003] -6 digit
account number, [007] –DRL3IP IP address, [008] –Gateway
•[999], enter a 55 to restart (00 to default)
Programming Power Series
Power Series Communication Programming:
•Section 301 Panel Tel number
= DCAA
•Section 350 Comms Format
= SIA FSK
•Section 381 opt 3 Auto SIA
= enabled
•Section 401 opt 1 DLS Enabled*
= enabled
*if downloading is required
DLS 2002 Software
DLS2002 Programming a panel via TL250
•Ensure the DLS2002 TL250 Driver is installed
(DLS2002 T-Link II Driver.exe)
DLS 2002 Software
Programing the panel Via DLS2002 and TL250:
•Change Modem to TCP/IP
Select TCP IP then click
OK
DLS 2002 Software
DLS2002 Programming a panel via TL250
•Enter the TL250’s IP address when an account is created or edited under
account properties
IP address of TL250
DLS2002 Programming a panel via TL250
•Upload/download control panel as usual
Questions?
Thank you for your time
For future assistance, feel free to
contact me at
[email protected]