Transcript Slide 1

Delivering Advanced
Connectivity to
Ireland’s IoTs
Owen Byrne
09/11/06
Outline
• Project Background
• Current Status
– Connectivity
– Service delivery
• Implementation
– Network build
– Design
– Technologies used
• Pilot phase oriented
Some Background:
• Initial ITnet Services Scoping task
• Decision to commence as a “pilot” project
• 3 pilot sites chosen:
– Waterford IT
– Limerick IT
– Blanchardstown IT
• 3 primary services chosen:
– General IP transit
– Connectivity to An Cheim
– Commodity IP transit
Integration Project Team
Implementation Team
Project Manager
Martin McCarrick
Brian Boyle
Owen Byrne
John Boland
Steering Committee
HEA
DES
Council of Directors
IUA (CHIU)
DIT
Mary Kerr
Ian McKenna
Brendan Murphy, Tim Creedon
Michael Nowlan, Brendan Tolan
David Scott
Current Status (Connectivity)
• Dark fibre connections to WIT, LIT, ITB currently in production
• Dark fibre connections to LYIT, Sligo IT, DKIT GMIT, Cork IT and An Cheim
now complete
• Circuit rollout for remaining sites currently underway (RFT process)
• Backbone regional PoP installed in WIT
• Backbone regional PoP scheduled for install in DKIT next week
• Further dark fibre quotations to eGov are being evaluated (Commodity IP)
Current Status (Services)
• General IP transit for ITB, WIT, LIT has been
migrated (each at 260Mbps)
• Technical solution for An Cheim fully tested; now
awaiting approval for cutover
– Now a total of 3 service providers
– Failover scenarios simulated in lab
• Some outstanding negotiations still required
regarding Commodity IP transit link
Implementation
• Use of regional Government MANs reached
via NBE (dark fibre)
• Network design in access network (last mile)
• Use of CWDM for multiple wavelengths
• New Points of Presence
• Equipment used on NBE & regional network
Access Network
(Government MANs)
• Previously, regional dark fibre was a scarcity
Limerick Core Ring
Limerick Access Ring
Network Design (Limerick)
Templates
Limerick Regional λ Planning
·
·
·
1470nm is used to provide a 1 Gbit/s resilient link between Site LIT and UL
1490nm is used to provide a 1 Gbit/s (TBC) resilient link between UL and Outreach Centre
10G resilient link between UL and ESB Telecoms aggregating n * 1Gbit/s from Access Ring (n<=8)
mux/demux
1470nm
1470nm
1490nm
1510nm
1530nm
1550nm
1570nm
1590nm
1610nm
1510nm
1530nm
1550nm
1570nm
1590nm
1610nm
mux/demux
MAN Ring
(n * 1Gbit/s)
Outreach Centre (LEDP, Roxboro):
Fibres 1&2 ---> UL
Fibres 3&4 ---> LIT
UL (Block A, Comms Room)
Fibres 3A&4A ---> LIT
Fibres 3B&4B ---> Outreach Centre
LIT (Primary Comms Room)
Fibres 5&6 --->Outreach Centre
Fibres 1&2 --->UL
E-net ODF
3,4 A to LIT
3,4 B to Outreach
mux/demux mux/demux
3750 Stack
E-net ODF
5,6 to Outreach
1,2 to UL
1470nm
1Gig TX
3750 Switch
E-net ODF
3,4 to LIT
1,2 to UL
1490nm
3750 Switch
10G
Cisco
7606
Regional
University of Limerick
Core Ring
(10G)
Adva
FSP
National
ESBT PoP
National Backbone
(10G)
Limerick Institute
of Technology
UL Outreach Centre
(LEDP)
Wavelength Division
Multiplexing
Multiplexing
lambdas
Ethernet
transmitters
Different light frequencies (colours)
over a single fibre path
Separating
lambdas
Ethernet
receivers
• CWDM in access network (1470nm – 1610nm. 8 x
channels, modulated at 1Gbit/s)
• DWDM in backbone. Each channel capable of
10Gbit/s (1 channel initially)
Access Layer transmission
Backhaul Transmission (Adva)
TX/RX
OSC
EDFA
DCF
Points of Presence
• Regional Layer 2 & Layer 3 PoP located in room A0-060 Main
Building University of Limerick
• Disaster recovery PoP located in Library comms room (@
intersection of access & core ring)
• CPE located in LIT comms room 1A.05
– Patched through adjacent room 1A.06
• Backbone transmission PoPs located in ESBT substations, at
Killonan and Drumline
Network Design (Waterford IT)
Templates
Waterford Regional λ Planning
mux/demux
It is planned to eventually provide a resilient connection to both Carriganore & College St. by forming
a MAN ring. In the interim, coloured wavelengths will be used on both point-to-points in anticipation
of this future work.
mux/demux
College St.
Carriganore
3750 Switch
3750 Switch
1490nm
1470nm
3750 Stack
1Gig SX
10G
Cisco
7606
Regional
Waterford PoP
Core Ring
(10G)
Adva
FSP
National
ESBT PoP
National Backbone
(10G)
1470nm
1490nm
1510nm
1530nm
1550nm
1470nm
1490nm
1510nm
1530nm
1550nm
1570nm
1570nm
1590nm
1610nm
1590nm
1610nm
New Waterford Points of Presence
• Layer 2 HEAnet PoP in Walton building
(diverse entry points)
• Disaster Recovery PoP at ABT building within
nearby IDA park
• Layer 1 backbone transmission PoP in ESBT
Killoteran
Fibre Topology Waterford IT
Client Site List
1. WIT Cork Rd.
2. WIT Carriganore
3. WIT College St.
4. WIT Narco Building
College St.
Carriganore
(TSSG)
ESBT PoP
ABT
Building
(IDA)
Walton
Building
Orange is the E-Net
provisioned SMF.
Brown (dashed) is the
new ESBT PoP to
HEAnet PoP core ring.
Blue are other E-Net
installed fibre links.
Waterford Core Ring
Blanchardstown IT
• Dark fibre point-to-point circuit to DCU PoP
– Complimented by existing 10Mbps circuit
• Substantial civil works complete at DCU after
lengthy delays
• General IP connectivity finally migrated on
26/10/06
Services Implementation
• Initial services migration:
– Connectivity to An Cheim
– General Internet connectivity
– Commodity IP transit
Pilot Services (L2/L3 Design)
HEAnet & Itnet Integration Pilot Phase
obyrne_v3 (last modified 31/10/06)
Regional L2/L3 PoP
An Cheim Vlan
Commodity IP Vlan
IP transit Vlan
Access Router
HEAnet
IP Network
Head-end
HEAnet
EoMPLS network
Packet Exchange
E-Gov Interconnect
Internet
3750
Regional
HEAnet
PoP
LSPs,
“pseudowires”
Citywest
HEAnet PoP
An Cheim
Head-end
CWDM Access ring
3750
An-cheim-7200
Head-end
hsrp
Institute of Technology
3750
Eircom
dot1q trunk
7206
Eircom
hsrp
hsrp
hsrp
Eircom
3560
Internal IoT LAN
Smart
3560
3560
SMART Telecom
SMART
3560
Internal
An Cheim Lan
E-Gov Services/Commodity IP
Transit
• Progress to date has been slow
• Requires circuit to the e-Gov interconnect at 40-50 Citywest
• Negotiations with eGov regarding most suitable interconnect
point are ongoing
– One possibility is INEX at DEG, and/or Telecity
• Not just required for commodity IP, but also for rollout of e-Gov
services
An Cheim
•
Resilient dark fibre ring between HP hosting centre and HEAnet’s Citywest PoP is
complete
•
Colocation contract signed with HP for 1 cabinet
•
Equipment and cabinet are installed
•
Cross connect to An Cheim row is in place
•
Layer 1,2,3 design & testing phase complete
•
Implementation restricted to11pm on Friday nights!
•
Hope to shortly begin actual cutovers
General IP Migration (LIT)
• On 19/07/06 LIT’s IP connectivity was migrated to
transit HEAnet directly
General IP Migration (WIT)
• On 27/07/06 WIT’s IP connectivity migrated to transit
HEAnet network directly:
Improvement in Delay Variation
• Before:
• After:
Circuit Delivery Timescale
Questions?