Transcript Slide 1

HEAnet National Networking
Conference 2006
Fáilte go Cill Chainnigh !
9th November 2006
John Boland,
Chief Executive
Housekeeping
Sponsors
Adding a bit of luxury !
Sponsoring the Gala Dinner
Sponsoring the Welcome Reception
Sponsoring the Memory Sticks
Sponsoring the Conference Bags
Sponsoring the Wireless
Sponsoring the Lunch
Sponsoring the Conference Prizes
Sponsoring the Web Cafe
Other Sponsors
Fill in an evaluation form
and you could win one of these …
Kindly sponsored by
• 7,500 songs
• 20 hours of battery life
• New iPod software features
2.5-inch color display
136 g
61,8 x 103,5 x 11 mm
Sony DCR-DVD205E
An easy to use DVD Handycam®
that records in True Widescreen
1.07 Megapixels Advanced HAD CCD
True 16:9 widescreen mode
2.7" Wide Hybrid LCD with Touch panel
Carl Zeiss® Vario Tessar
Super SteadyShot
12x Optical Zoom / 800x Digital Zoom
Super NightShot Plus
Easy 12cm DVD copy with Nero Express 6
Evaluation Forms
Returned / Prizes
Opening Address
Mr Tom Boland
Chief Executive of the
Higher Education Authority
and
Chairman of the Board of HEAnet
HEAnet Update
Services, Schools, SuperComputers and SFPs
9th November 2006
John Boland,
Chief Executive
TOPICS
•
•
•
•
•
•
•
National Backbone & Connecting Client Sites
ITnet Integration Project
Services & Innovation
SuperComputers
Schools
International Developments
Bandwidth record
National Backbone Extension
(NBE)
Rolling out fibre to the campus
NBE
National Backbone extension Update 2nd Nov 2006
Objective: NBE phase 2 catering for:
– 43 new point to point links
– 17 IoT links
– 26 Non - IoT links
Project start date: 24 March 2006
Expected completion: March 2007
Fibre network end 2006 – approx 2300km of fibre
Outsourced Layer 1/2
Operational Network Management
• BT operational management of the Layer 1/2 network
from Dec 2006
• 24/7 helpdesk
• Tactical and strategic management remains with
HEAnet
• Layer 1 – physical breaks
• Layer 2 – ethernet/optical problems
• Layer 3 – IP routing = HEAnet NOC
IP Network Re-Design
Existing backbone IP equipment dates back to 1999
– Need to Support GE connections from clients
– Support 10 Gbps connections capable routers
• Aggregation of National, International (Geant),
General Internet and Points-2-Points
• VPNs based on virtual routers
• Plan for the next five years
– 40 - 100 Gbps over lifetime
IP Network Re-Design…
•
•
•
•
•
•
Tender process commenced 06 Nov 2006
Technical dialogue
Preparing call for tender and specification
Full IP network re-design
€3-4m project
Carrier class router base
• Possibly only two routers!
Connecting the Institutes of
Technology to the Backbone
Current Status
• General IP connectivity rolled out to WIT, LIT and ITB
• Technical solution for An Chéim fully tested &
equipment deployed; now awaiting approval for
cutovers
• Improvements in latency and link quality to each site
observed
• Commodity IP transit service in preparation
ITnet project: Current Status
• 9 ITnet locations newly connected over dark fibre since project commenced
• Circuits to WIT, LIT, ITB currently carrying production traffic (260Mbps
available on each)
• Circuit rollout for remaining IoTs currently underway (RFT process)
• Backbone regional PoP installed & commissioned in Waterford IT
• Backbone regional PoP due for install in Dundalk IT next week
• Further connectivity options with Government Network under consideration
Circuit Delivery Timescale
Services & Innovations
Services & Innovations
• Fibre-optic infrastructure rollout
• Resilience
• Client upgrades / P2P circuits enabled
by NBE Roll-out
• Improved Co-Location / Hosting facilities
Innovations Cont’d..
•
•
•
•
•
Wi-Fi / Roaming: eduroam infrastructure trials
Hosting of E-num service (VOIP for Ireland)
IPTV delivery to students trial
NDLR: preparing for production service
Streaming and Mirror Services
– = record peak traffic for the Irish Internet (on INEX)
Streaming & Archives:
Houses of the Oireachtas
• Dáil and Seanad
• Dáil Committee Rooms
Managed Schools
Network
Background: Ireland’s Schools Network
• Free Internet connectivity for approx 4,000 schools
• 3 Year Agreement - Joint Government & Industry Funding
(TIF)
• Establishment of centrally managed Schools Network at
HEAnet
• Portfolio of associated HEAnet network services:




Connectivity
Security
Content Filtering
Email
• Technical Support
Schools Network Topology
Other NRENs
Internet
HEAnet Backbone
Schools Blanchardstown
(Server infrastructure only)
Kilcarbery Park POP
Citywest POP
c
Ba
Smart
Lastmile
Irish BB
HS Data
ku
pl
ink
BT
Digiweb
Schools
Benefits for Schools
• ‘Always On’ Broadband Connection (min. 512k to 2Mbps)
• Faster downloads & improved access to Multimedia resources
• Managed School Router
• Managed Network & Security Services
• Internet Content Filtering
• Email Services
• Future Services (e.g. Web-hosting)
• Technical Support (NCTE Service Desk 1st Line)
/(Wiki)
School Router Install Run-Rate
4000
3500
Router Installs
3000
2500
2000
1500
1000
500
0
Sep
Oct
Nov
Dec
Jan
Feb
Mar
2005-2006
Apr
May
Jun
Aug
Sep
Schools: Summary Statistics
 Connectivity Statistics:




3,730 (95%) of schools installed
3,312 (84%) of school LANs have connected
Daily schools traffic exceeding 100Mbps
Schools downloading up to 250GB of data per day
 Filtering Statistics:




4% of traffic is to “blocked” categories
2% of traffic is Spyware
Virus incidents are down by 70% since Q ’06
Teachers are more prepared to use Internet in class
Schools Weekly Traffic Patterns
HEAnet
Schools
Network
SuperComputer
Procurement
Participating Institutions
National University of Ireland, Galway
Dublin City University
Dublin Institute for Advanced Studies
National University of Ireland, Maynooth
Trinity College Dublin
Tyndall Institute
University College Cork
University College Dublin
HEAnet
High-End Computing in Ireland
Marine Modelling Centre, NUI, Galway
DFT+U spin density. Michael Nolan1, Dean C. Sayle2,
Stephen C. Parker3 and Graeme W. Watson1
(1) TCD, (2) Cranfield University, (3) University of Bath
G.Murphy, et al, , DIAS/CosmoGrid
Llyod D., et al, Dept. of Biochemistry, TCD
Record-breakers
• The high-performance machines are used by scientists to
simulate everything from ocean currents to biological cells.
• At the moment the most potent machine in the world is the
IBM's Blue Gene/L at the Lawrence Livermore National
Laboratory in California
• The record breaking system, the only machine to have pushed
through the 100 teraflop barrier, performs a staggering 280.6
trillion calculations per second. The computer has more than
130,000 processors
New HEAnet Services
PoP
- ServCentric
New HEAnet Services POP
• Based at ServCentric, Blanchardstown, Dublin
• Occupies 120 m2 of floor space, in its own secure
room, with air conditioning, fire suppression and
resilient electrical supply
• Fitted with 32 * 19 inch racks
• Resilient connections to the HEAnet National
Backbone, at 10 Gbit/s
New HEAnet Services POP
TCD
UCD
DIAS
NUIM
HEA
WIT TSSG
EPA
Qualifax
IRCSET
Comreg
ILUG
SixXs
IRIS
NDLR
International
Developments
& GÉANT 2
International Enhancements
• General Internet (currently 2.5)
• DANTE and HEAnet have procured dark fibre
solution across the Irish Sea
• DANTE will run DWDM over the link
• IP service will migrate to 10 Gbps in Jan 2007
• GEANT “+” will provide 1GE P2Ps
• DANTE lease wavelength from UKERNA Dublin PoP
as very economical backup to Europe
Project Achievements in Year 2
• Network rollout 97% complete
• Very good R&D results
– Perfsonar – European monitoring framework
– Eduroam/JRA5 – European roaming infrastructure
– Performance Enhancement Response Team (PERT), Advanced MultiDomain Provisioning System (AMPS)
– Bandwidth on Demand Inter-domain Manager (IDM) prototype
– Security Toolset
– Cross-activity: end-to-end monitoring, common topology DB, E2ECU
• Greater publicity and awareness
–
–
–
–
55 events, 78 presentations, over 170 press articles
Compendium of NRENs 2005 completed
Foresight Study defined and tasks assigned
Video, interactive demo, brochures, leaflets, newsletter, maps, posters
SFPs
Traditional communications equipment
SFPs
XENPAC
GBICs
Your
colour
Your
connection
Your LAN
Bandwidth
Upgrade
Record
Client Bandwidth Upgrade Record
•
Start of term 2006/2007
•
08:00 Wednesday, October 25th saw the
biggest bandwidth upgrade in one morning in
the history of HEAnet
•
Over 1,600 Mbps extra capacity was delivered
•
Average 75% bandwidth upgrade for all clients
This visible burst is NUI-M
who went from 77Mbps to 140Mbps