Transcript PPT - unece
UNECE Working Group on
Environmental Monitoring and Assessment
27-29 November 2006, Geneva
Asim Acikel/Tacis Project Coordinator
TACIS project (2006-2007)
•
Presentation on Tacis project at the 6th Session of
UNECE/WGEMA is available at
(http://ewindows.eu.org/belgrade07/eecca/tacis/ta
cis_06/fol468791/doc614226)
•
Effective start of the Tacis project was announced at
the 6th Session of UNECE/WGEMA and was notified to
the Ministries of Environment of EECCA countries in
June 2006
•
Tacis project objectives, outputs, plan of operations,
logical framework, overall output performance plan,
newsletter (RU/EN) etc., is available at Tacis website
under Belgrade portal of the EEA website
(http://ewindows.eu.org/belgrade07/eecca/tacis/ta
cis_06)
Project focus & structure
• 3 key areas:
A. Water
B. Air and climate change
C. Improve environmental information
and reporting in the framework of Belgrade
report preparations (with focus on
indicators)
Water component
Tasks:
•
•
•
Needs assessment
reports on water
quality monitoring for
each EECCA country
for future funding
through
international/bilatera
l donors;
Support EECCA
countries in
development of
national databases
and data sharing
Eionet water (AZ, BE,
MO, RU, UKR)
Training and capacity
building in the field of
water management.
Activities:
•
Country visits to 10
EECCA countries
were carried out for:
•
•
Needs Assessment
on water quality
monitoring
(sampling,
laboratory analysis
and information
management)
Assessment of the
state of the national
databases and the
capacity to be able
to provide data
electronically for the
construction of
indicators (i.e. join
in the Eionet-Water
priority data flows)
Preliminary findings for Needs
Assessment
AM
AZ
BY
Sampling and
sample processing
Laboratory analysis
Data management
Minor investment needed
Moderate investment needed
Intensive investment needed
No information
GE
KZ
KG MD RU
TJ
TM
UA
UZ
Preliminary Findings for Capacity to
deliver data for EECCA water indicators
AM
AZ
BY
GE
KZ
KG
MD
RU
TJ
TM
UA
UZ
N/I
N/I
Air and Climate change component
Tasks:
•
Training of EECCA
experts through
participation in
relevant Tacis
workshops
•
Support in the
translation of the
EMEP/CORINAIR
Emission Inventory
Guidebook.
Activities:
•
•
•
TACIS training seminar
on air pollutant and
greenhouse gas
emission inventories,
19-20 October 2006,
Almaty, Kazakstan
Tacis training seminar
on air quality
monitoring, assessment
and management in
EEA and EECCA region,
07-08 November 2006,
Chisinau, Moldova
EMEP/CORINAIR
Emission Inventory
Guidebook translated
into Russian (QC in
process)
Feedbacks from participants to the
workshops
•
•
•
Workshops were assessed as useful and practical one
Underlined importance of continuity and systematic
approach,
Participants suggestions for future capacity
building/trainings on:
•
•
•
•
•
•
•
•
available inventory IT tools
calculation of uncertainties
How to use facility level data for the national inventory
(reliability, incompleteness)
health impact of air quality in bigger cities of EECCA
region,
methodology for monitoring and measurements of air
pollution (case studies),
air quality modelling in EECCA countries
Participation in EIONET air workshops
Country-specific trainings
Improve env. information and reporting:
Belgrade report preparation
Tasks:
•
•
•
Build expertise in
environmental
assessment & the
use of indicators;
Production of EECCA
core set of indicator
methodological guide
and compendium
Review of Belgrade
report chapters on
the occasion of
different Tacis
project
events/workshops/
meetings
Activities:
•
UNEP and UNECE are
partners for
development of EECCA
CSI Methodological
guide and
compendium (see
presentation of UNEP
and UNECE for details)
•
Review of draft panEuropean Assessment
Report, Belgrade
2007: Consultation
with nongovernmental and
other bodies,
November 16-17,
2006, Copenhagen
(Eco-Forum)