Turkish Environmental Information Exchange Network
Download
Report
Transcript Turkish Environmental Information Exchange Network
TURKEY SoER 2010 STUDIES
Ministry of Environment and Forestry
September, 2009
Özlem Esengin
1
Content
Background
SoER Part C
Commonality
Diversity
Flexibility
EIS Projects
2
Background
History of Reporting in Turkey
• Since 1993, SoER at provincial level are prepared every
year
• SoER at national level is prepared every 4 year (latest
2007)
• Besides, a questionnaire aiming to define the
environmental problems and priorities was prepared by the
MoEF and was filled in by Provincial Directorates of MoEF
every year.
• An environmental indicators booklet is prepared and
published every year since 2007.
3
Background
SoER Part A … EEA
SoER Part B … EEA
SoER Part C … countries
NFP team
related PCP’s
Division of SoE Reporting
(country coordinator)
4
SoER Part C
•
Commonality (8 topics)
•
Diversity (uploaded)
•
Flexibility (topics determined)
5
Commonality
•
•
•
•
•
•
•
•
Air pollution (studies ongoing)
Climate change mitigation (ready)
Nature protection and biodiversity (ready)
Land- CLC 1990-2006 (ready)
Freshwaters (studies ongoing)
Waste (studies ongoing)
Soil (from country report)
Marine (from country report)
6
Diversity
•
•
•
Prepared with the help of State Planning
Organisation (responsible for preparing 5year Development Plans)
Uploaded
4 questions
•
•
•
•
Distinguishing factors
Major developments since 1980
Main drivers of environmental pressures
Foreseen main cause of enve. problems
7
Flexibility
•
•
•
Biodiversity (a vast variety of species;
both common and endemic)
Climate change (as of 26 august 2009,
Turkey is a party to the kyoto Protocol)
Information Systems (since 1990’s
studies are ongoing, EIS, TEIEN)
8
EIS & Teien
•
•
•
Environmental Information System was established in
2006 under MoEF that also allows data access and
query to other institutions that deal with environmental
data.
TEIEN will create an environment over which
participants shall exchange regular environmental data
through the mechanisms and applications to be
developed. The system will also serve advanced
reporting tools and GIS-enabled decision support tools
for geo-referenced environmental data. It was started
in December 2008 and will last in 16 months.
Reporting at all levels planned to be realised through
the reporting tool of TEIEN
9