FCal-LSB.LArIntReviewx
Download
Report
Transcript FCal-LSB.LArIntReviewx
Forward Calorimeter
Layer Sum Boards
Phase I Upgrade
LAr Internal Review
J. Rutherfoord
29 May 2015
FCal LSBs for Phase I
Goals of the Phase I upgrade
Description of the baseline
Present status
23 September 2014
J. Rutherfoord
2
One FCal1 -slice
Will be 12 trigger towers
per -slice
Now
Proposed
Now just 4 trigger
towers per -slice
28 May 2015
J. Rutherfoord
3
FCal front-end is different
Trigger summing
No summing in depth
All LSB inputs are individually weighted by
sin() – Of order 10 variation
23 September 2014
J. Rutherfoord
4
FCal Layer Sum Bds
Layer Sum Board
Layer Sum Boards will provide
finer segmentation, i.e. less
summing.
Will maintain legacy summing
23 September 2014
J. Rutherfoord
5
FCal1 LSB Schematic
23 September 2014
J. Rutherfoord
6
FCal1 Phase I Layer Sum Board
23 September 2014
J. Rutherfoord
7
Dynamic range
Table is everywhere in units of ET
In FCal, kinematic limit determined at s = 14 TeV
Choose pT = 512 GeV as upper limit for all FCal
trigger towers for now No saturation!
Use shaper linear mixer output upper limit of 3.0 V
Set linear mixer gains as low, hi, hi
23 September 2014
J. Rutherfoord
8
Resistor values assuming 512 GeV pT and linear mixer 3.00 V
23 September 2014
J. Rutherfoord
9
Test (dummy) boards
Front-End Board (with LSB slots)
Calibration board
Input from pulse generator to mux which
drives 128 lines
LTDB with mux from inputs to output to
digital scope
23 September 2014
J. Rutherfoord
10
“Dummy” Front End Board layout
23 September 2014
J. Rutherfoord
11
FCal1 prototype Phase 1 LSB
100 ns
Input: pin 02
Output: pin 49
Rise: 35 ns
Amp: 2.5 Vpp
Only one power
and one ground
pin connected
for this test.
23 September 2014
2.5 V
J. Rutherfoord
12
FCal1 LSB prototype: Normal x-talk
100 ns
Input: 2.5 Vpp
Output: 3 mVpp
5 mV
0.1% x-talk
2.5 V
23 September 2014
J. Rutherfoord
13
FCal1 LSBOnly case of bad x-talk
100 ns
Input: 2.5 Vpp
Output: 50 mVpp
2% x-talk
50 mV
2.5 V
23 September 2014
J. Rutherfoord
14
Present status
FCal1 LSB pcb stuffed and tested
Flaw – One channel in one location has crosstalk exceeding specs. Easy to fix.
Possible mix-up on which pair to sum.
Three dummy FEB pcbs stuffed – ready to
test
23 September 2014
J. Rutherfoord
15