1-4_Myanmar_offgrid_2015-01_Ajith_Kumara_Hydropower_Status
Download
Report
Transcript 1-4_Myanmar_offgrid_2015-01_Ajith_Kumara_Hydropower_Status
Off-grid Hydropower Status of
Myanmar
The NEP Workshop on Off-Grid Electrification in Myanmar
Grand Ball Room, Thingaha Hotel, Nay Pyi Taw
January 28-29, 2015
P G Ajith kumara
[email protected]
Outline
Visited Hydro power projects
Categories of hydro power projects
Characteristics of Hydro power
Technical status
Hydro power service providers
Comparison with Sri Lanka off grid Hydro
power
35kW
200 HH
Private own
200W
1 HH
300kW
2000> HH
ESE owned
Mechanical power
Small industry runs
Private owned
7kW
130HH
DRD Funded
Unknown power
80 HH
DRD funded
Distribution line
300VA voltage
stabilizer
Visited Hydro power projects
Shan, Chin, Mandalay and Sagaing
states
22 hydro projects visited
Capacity range 0.1kW to
1,500kW
6 nos. of service providers
interviewed
Individual, community based,
private ,government owned and
government funded projects
Categories of hydro power projects
Domestic HPP (06 nos.)
◦ 1 – 5 HH
◦ <500W power
Village HPP (12 nos.)
◦
◦
◦
◦
Upto 100kW
Few hundreds HH
Private, community and DRD funded
Operate by Community or owner
Government (DHPI, ESE) HPP (03 nos.)
◦ Upto 1,500kW
◦ National grid tariff structure
◦ O & M by ESE
Domestic HPP
Available in Shan and Sagaing states
Low head turbine technology
Unit cost Ks. 500,000 – 800,000
Fix in Irrigation channels
Output power 100W – 400W
PowerPal (http://www.powerpal.com)
Canadian design (available upto 75kW)
Water wheel
Domestic HPP…
Not required any form of approval/ permission
Can be acquired only well income and water
sources owned families
Owners may supply electricity for few neighbors
at Ks. 2,000 per bulb
Owners use light as well as TV and audio system
No significant bad impact on environment
Equipments can be purchased by cash only
Domestic HPP…
Monthly O & M cost Ks. 3,000 – 6,000
◦ Bearing life span 1 to 3 months
Very poor power
◦
◦
◦
◦
Voltage varies 150V – 260V
Frequency varies 35Hz – 65Hz
Not use controller
Tube bulb with magnetic ballast and Incandescent bulb
only use
Ready made (PMG) generator available in market
Turbine and housing manufacturing by local
technicians
Village HPP
Invested by Private entrepreneur, community and DRD
or two of these
Capacity range is 3kW to 75kW
Actual output is less than 50% of the designed power
Locally manufactured turbines use
Monthly energy cost is Ks. 300 to 3,000/= ( one
project15,000)
Project implementation cost upto ks250,000 per HH
Energy demand 2 to 5 bulbs, TV Audio systems, mobile
phone and Rice cooker
Financing management not much transparent
Village HPP... Private owned
Started targeting own industry
2 projects in Shan state based on grain
crusher, rice mill and oil expeller
One project from Sagaing state based on
turbine manufacturing
Owners have technical capacity for O & M
Do not deal with banks
Village HPP... Community based
Project starting
◦ By practicing neighbour village HPP or
◦ By encouraging hydro power developer or
manufacturer
Per house invest up to Ks. 250,000
All advices are taken from developer/ machine
suppliers
Electricity consumer society run with mutual
understand
Written approval not required
Social, financial or technical record are not
maintaining
Village HPP... DRD developed
DRD fully funded and contractor selected
by tender calling
Capacity less than 20kW
O & M by community
Beneficiaries have little aware on income
Very poor specification in tender documents
Village HPP general comment- policy
DRD has been started 100% funded HP
development last couple of years
No recording/ registration methods of projects
Local governments have supported for some
projects in financing and technically
Monthly charge based on nos. of appliances or
fix rate
Village HPP general comment- Social
Over 80% of beneficiaries are farmers and the balance is
retails seller, labours(skilled, unskilled)
Businessmen, labours(skilled, unskilled)
Monthly energy consumption 4kWh- 75kWh
Major electricity usages are Lighting, Audio/ video,
Phone.(rice cooker)
Freely electricity supply for community centres, School
and monastery
Project manage with mutual understand and no record
minutes
Project developing and purchasing through a single
person or a company
Very poor safety level (not use RCCBs, MCBs or fuses)
Village HPP general comment- Technical
Turbine are not match for the site specification
Not use a control system (fix load/ sluice gate
control)very poor quality power (150V- 260V
and 35Hz to 70Hz)
Hidden cost to maintain appliances
Voltage stabilizer has to be used with TV and
audio system
Project failure rate is unacceptable level and
maintenance cost is very high
Over all efficiency is less than 30%
Machines life time is 3 – 10 year
Village HPP....Technical
Locally made turbines
Little knowledge on critical aspects on
turbine (speed matching, controlling, bearing
selection, finishing or turbine)
Some projects abandoned due to endless
failures
Poor workshop facility (very old lathe and
drills)
Energy pricing
Energy cost vary Ks. 40 -250 per kWh
Energy consumption 5kWh to 70kWh
per month
Major electricity demand for 2 to 5 bulbs,
TV/ Audio, phone charge , Rice cooker
Government Hydro power projects
DHPI has developed in 1980s and1990s
ESE tariff structure apply
Capacity is 200kW to 1500kW
Imported machineries use
11kV transmission line with multiple nos.
Of step down transformers
Regularly fail bearing, generator and
electronics components
Government Hydro power ....
Var HPP bearing fail 5 time per year
Laiva HPP diode fail few times per year
Very poor attention on maintenance
activities(non of flow controller
functioning)
Service providers(Domestic and village
HPPs)
Hydro power developer
◦ Acting as an intermediary linking villagers with
equipment suppliers
◦ Advice on technical, social and financial aspects
◦ Supply all equipment and earn profit
◦ Contribute for maintenance work
Machine manufacturer
◦ Manufacture turbines, penstock(steel) panel
board
◦ Act as a developer also
LCC analysis
Investment
Project
Domestic HPP
Pan Oo Tang
Mong In
Owe Kong
Ming In
Laouk Lon
Actual power
Amount(Ks)
NPV @ 10%
discounted
Year
15yrs LCC
@10%
Capacity cost
discount rate
@ 20yrs
(ks/kWh)
(Ks/kW)
0.25
600,000
2014
600,000
220
6,000,000
25
60,000,000
2002
188,305,703
380
7,900,000
1
5,000,000
2014
5,000,000
550
12,000,000
15
50,000,000
2014
50,000,000
200
6,650,000
3
500,000
2014
500,000
860
7,500,000
10
10,000,000
2011
13,310,000
376,
4,100,000
35Ks
LCC analysis...
By practicing advance technology (use in developing
countries)
Energy cost(ks/kWh) can be reduced up to 20% -50%
Capacity cost(Ks/kW) can be reduced upto 20% to 50%
(based on 20years LCC)
Cost variation
Project cost increases 20% - 50%
Life time increase over 20 years (3 times)
O and M cost reduce upto 50%
Energy generation increase about 50%
Comparison with Sri Lanka HP
Community based concept
Project implementation cost
Technology
Project O & M expenses
Community based concept
Registering in local government as a welfare
society(Electricity consumer society, ECS)
Main posts of society are adviser, president, secretary,
treasurer and working committee
Maintain minutes of each meeting
General meeting calls quarterly and emergency meeting
call to get special occasions
Pass the annual budget
20% to 40% project cost is in-kind labour and materials
All construction doing by members with guidance of the
developer
Community based..
Maintain bank account and monthly saving
deposits
Two of president, secretary and treasurer
have to be present to withdraw money from
account
ECS management has to be change annually
Knowledge sharing between ECS
Technology
Developer
◦ Facilitate between villages and all other stakeholder
◦ Manage technical, project, social and financial areas
Manufacturer
◦
◦
◦
◦
Design and manufacture according to site specification
Install and commissioning
Maintenance
Mechanical and electrical parts manufacturers
Main components
◦ Water intake, Head race, Forebay tank Penstock, Turbine,
Generator, Controller, Distribution panel, Distribution line
Forebay tank
Short wall
Trash rack
Spill way
Penstock
Flush outs
Forebay tank...
Control system
Controller – ballast load
Project O & M expenses
10kW project, 50 HH
Monthly income (LKR 300x50)
Operator salary
Monthly saving
Annual saving
=15,000($115)
= 6,000($46)
=9,000($70)
=108,000($830)
Thank you