______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Grid-Scale Energy Storage Solutions
•
•
•
Grid-scale storage enables development of double-digit levels of wind
penetration
Europe integrates variable energy with big transmission, conventional
hydro, and carbon-free pumped storage
Changing US market for system reserves and grid reliability services
Ancillary Services: Demonstrating
Hydro’s Flexible Generation
Flexible Hydropower Is a Proven and Widespread Technology!
Denmark & Grid Reliability
•
•
•
30% wind penetration in the generation mix
No native load balancing
Balancing services provided via interconnects:
- Strong interconnections with Norway, Sweden, and Germany
- Utilizes energy storage and flexible energy options in neighboring balancing areas
- Excess wind is exported and stored in Norwegian hydropower reservoirs
Power Balance in Denmark 2008
Norway
Sweden
Germany
Source: Energinet.dk
Western Denmark
Wind Output and Net Electricity Flows
Source:
Manitoba Hydro
Pumped Storage Activity in the United States
Proposed/Preliminary Permits for Pumped Storage
Contact Info
RICK MILLER, P.E.
SENIOR VP AND NATIONAL DIRECTOR
RENEWABLE ENERGY SERVICES
HDR Engineering, Inc.
704.248.3686
[email protected]
BACKUP SLIDES
What Can Be Done to Address Challenges?
Markets: Energy Storage Model
(Similar to Gas Storage Model)
200 MW
Injection
Fee:
1
~$5/MWh
Electricity
LOAD, DSM,
or
Reg. Down
1
$10/MW
1,000 MW
PSH
Reservation Charge/Customer (sold in
100-200+/- MW increments)
Transmission Services:
Fast Response, Voltage
Support, Regulation
(AS provided while still
providing storage services)
Electricity
GENERATION,
or
Reg. Up 1
$15/MW
Withdrawal
Fee: 1
~$5/MWh
Coordination with Neighbor TSO (REE, Spain)
The Portuguese Goals for Renewables