SC C2 Strategic Plan
New SC C2 structure:
•
•
•
•
•
•
•
•
•
Within SC C2 a new structure was introduced.
A new Strategic Advisory Group was created.
Members of this AG include the SC Chairman and Secretary, the three former AG
conveners and all current WG conveners.
This Strategic AG plans to hold meetings approx. twice a year.
Advantages are faster reaction possibilities and an intensified horizontal dialogue
between the WGs of the three main areas of SC C2.
The former AGs were disbanded.
With the new structure, the study committee is in line with the SC reference model decided
by the TC: “Advisory Groups with only one person should be avoided.”
The Strategic Plan for SC C2 will be reviewed within the next months.
The review will take into account the TC Strategic Plan, to which the revised C2 plan will
be aligned.
59th Technical Committee Meeting, Barcelona (ES), March 26-27, 2012
SC C2 Organization Chart
SC Chairman
Joachim Vanzetta (DE)
SC Secretary
Christoph Schneiders (DE)
Publication Advisor
Anjan Bose (US)
Ian Welch (UK)
Strategic Advisory Group
Joachim Vanzetta (DE)
WG C2.13
Voltage and Var support in System
Operation
WG C2.21
Lessons learnt from recent Emergencies
and Blackout Incidents
WG C2.33
Control centre operator Requirements,
Selection, Training
JWG C2/C5.05
Developments and changes in the
Business of System Operators
Thales Papazoglou (GR)
Ben Li (CA)
Ninel Cukalevski (RS)
Ole Gjerde (NO)
WG C2.16
WG C2.22
Application of resilience engineering to
safety management principles in Control
Centers, ensuring and enhancing power
system reliability
Teresa Carolin (ZA)
WG C2.34
Capabilities and requirements of a control
centre in the 21st century- Functional and
Human Resources view
JWG C1/C2/C6
Coping with Limits for High Penetration of
Renewable Energy
Challenges in the control centre
(EMS) due to distributed Generation
and Renewables
Michael Power (IE)
Udo Spanel (DE)
C2 Representative: Hugh Jones (IE)
Real time System Operation and Control
System Operational Planning and
Performance Analysis
Control Centre Infrastructure and
Human Resources for System Operation
Joint Working Groups
59th Technical Committee Meeting, Barcelona (ES), March 26-27, 2012
2