EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA …
Download
Report
Transcript EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA …
EVACUATION STRATEGIES
FOR KARWAR ULTRA MEGA
THERMAL POWER
PROJECT
SOUTHERN REGIONAL
LOAD DESPATCH CENTRE
ULTRA MEGA THERMAL POWER
PROJECTS
GUJARAT
MADHYA PRADESH
CHATTISGARH
KARNATAKA
MAHARASHTRA
MUNDRA PORT
ASSAN
AKALTARA
KARWAR
KONKAN COAST
4000 MW EACH
RS 15000 CRORES INVESTMENT FOR
EACH PLANT
68
72
76
88
84
80
92
96
INDIA
PROPOSED 5 ULTRA MEGA POWER PROJECTS
GEO POLITICAL
POWER REGIONS
J&K
HP
PUNJAB
HARIANA
N
SKM
DELHI
RAJASTHAN
UP
MP
SASA
W
JKND
B’
DESH-
WB
ORISSA
MAHARASHTRA
DIU
ME
L
CTGR
DAMAN
S
GOA
AP
PONDICHERY
KARNATAKA
A&N
TADIRI
LAKSHADWEEP
TAMIL
NADU
SRI
LANKA
NG
ASSAMNE
BIHAR
E
MUDRAKOTGUJARAT
NER
BHUTAN
NEPAL
MNP
TRPMIZ
MYANMAR
KARWAR ULTRA MEGA
THERMAL POWER
PROJECT
EVACUATION CHALLENGES
FOREST MAP OF KARNATAKA
ENVIRONMENTAL ISSUES
KARWAR IS IN COASTAL SURROUNDED
BY DENSE FORESTS
– FOREST CLEARANCE APPROVALS – LONGER
LEAD TIMES
– NECESSITATES QUICK FINANCIAL TIE-UPS
AND STATUTORY APPROVALS
– MAY REQUIRE USE OF MULTI CIRCUIT
TOWERS TO CONSERVE ROW
TECHNICAL ISSUES
LOAD-LOAD GROWTH IN NORTH COASTAL
KARNATAKA NOT COMMENSURATE WITH
THE GENERATION ADDITION.
LOAD CENTRES ARE TOWARDS SOUTH –
BANGALORE-MYSORE-MANGALOREHASSAN.
BANGALORE LOADS GROWING AT A
PHENOMENAL RATE (15%).
EVACUATION STRATEGIES
CORE ISSUES
EVACUATION FOR A 4000 MW STATION
NEEDS TO BE ROBUST
LOAD CENTRES ARE FAR AWAY
NECESSIATING A NEED FOR LONG LINES
HOLISTIC PLANNING:-SHOULD BLEND IN
WITH THE EXISTING SCHEME FOR
ECONOMY AND BETTER CORRIDOR
UTILIZATION
VOLTAGE LEVELS:
– 765 KV LINES
– 400 KV D/C QUAD MOOSE
– 400 KV D/C
Suggested Evacuation Plan for KARWAR
ULTRA MPP (4000MW): OPTION 1
MAPUSA
(GOA)
HVDC
B2B@
MAPUSA
AC Link or HVDC B2B
at RAICHUR or PARLE
TO PARLE (WR)
NARENDRA
MUNIRABAD
HYD
RAICHUR
NSR
KAIGA
SSLM
KURNOOL
TORANGALLU
KARWAR
ULTRA MPP
(4000 MW)
GUTTUR
D/C QUAD
LINES
ANANTPUR
(AP)
GOOTY
HIRIYUR
Lines considered
in CEA NEP 2012
TALAGUPPA
Lines in service
by end Dec 06
DODBALLAPUR
HASSAN
NELAMANGALA
NAGARJUNA
HOODY
1000 MW
MYSORE
BIDADI
TO KOHZIKODE (KERALA)
SMNHL
TO KOLAR
Suggested
KARWAR
Evacuation and
NAGARJUNA
Mangalore Project
Evaluation
Fixed Series
Compensation
Suggested Evacuation Lines
OPTION 1
• KARWAR-MAPUSA ( HVDC B2B LINK)
• KARWAR-TALAGUPPA (400 KV DOUBLE CKT.)
• KARWAR-HIRIYUR (400 KV DOUBLE CKT.)
• HIRIYUR-HASSAN (400 KV DOUBLE CKT.)
• NELAMANGA-TALAGUPPA BOTH 400 KV CKTS. LILO AT HASSAN
•HIRIYUR-DODDABALLAPUR 400 KV S/C
•HIRIYUR-ANATHPUR-DODDABALLAPUR 400 KV S/C
• NAGARJUNA – HASSAN (400 KV DOUBLE CKT.)
• HASSAN-MYSORE (400 KV DOUBLE CKT.)
• MYSORE-NELAMANGALA ONE CKT. LILO AT BIDADI.
OPTION 1: HIGHLIGHTS
THE EXISTING CORRIDOR OF TALAGUPPA NELAMANGALA
LINE IS USED FOR ENHANCING EVACUATION.
BY PROVIDING HVDC BACK-TO-BACK CONNECTION WITH
GOA, FLEXIBLE AND GUARANTEED EXPORT TO GOA (WR)
CAN BE ACHIEVED.
CREATION OF A NEW STATION (DODDABALLAPUR) NEAR
BANGALORE HAS BEEN ENVISAGED FOR ADDED SECURITY
AND RELIABILITY OF SUPPLY TO AND AROUND BANGALORE.
TOUCH POINT HAS BEEN PROVIDED AT ANANTHPUR IN AP –
GROWING LOAD CENTRE.
MAY REQUIRE COMPENSATION OR STRENGTHENING OF
TALGUPPA-HASSAN SECTIONS.
N-1 CRITERIA IS BARELY MET.
Suggested Evacuation Plan for KARWAR
ULTRA MPP (4000MW): OPTION 2
NARENDRA BB WADI
AC Link or HVDC B2B
at RAICHUR or PARLE
TO PARLE (WR)
KOLHAPUR
(WR) HVDC
B2B@
NARENDRA
HYD
RAICHUR
NSR
KAIGA
SSLM
KURNOOL
MUNIRABAD
KARWAR
ULTRA MPP
(4000 MW)
TORANGALLU
GUTTUR
ANANTPUR
(AP)
GOOTY
D/C QUAD
LINES
HIRIYUR
Lines considered
in CEA NEP 2012
TALAGUPPA
DODBALLAPUR
HASSAN
NELAMANGALA
NAGARJUNA
HOODY
1000 MW
MYSORE
BIDADI
TO KOHZIKODE (KERALA)
SMNHL
TO KOLAR
Lines in service
by end Dec 06
Suggested
KARWAR
Evacuation and
NAGARJUNA
Mangalore Project
Evaluation
Fixed Series
Compensation
OPTION -2 HIGHLIGHTS
NARENDRA-KOLHAPUR BACK-TO-BACK LINK
INSTEAD OF KARWAR-MAPUSA.
ADDITIONAL D/C LINE TO BASAVANA
BAGEWADI TO SERVE N.KARNATAKA AND
ALSO CONNECTS TO TWO HVDC B2B
EXPORT PATHS
– NARENDRA- KOLHAPUR
– RAICHUR-PARLE
ADEQUATE
EVACUATION CAPACITY.
Suggested Evacuation Plan for KARWAR
ULTRA MPP (4000MW): OPTION 3
AC Link or HVDC B2B
at RAICHUR or PARLE
TO PARLE (WR)
NARENDRA
BB WADI
KOLHAPUR
(WR) HVDC
B2B@
NARENDRA
HYD
RAICHUR
KAIGA
NSR
MUNIRABAD
KARWAR
ULTRA MPP
(4000 MW)
SSLM
KURNOOL
TORANGALLU
GUTTUR
D/C QUAD
LINES
TALAGUPPA
ANANTPUR
(AP)
GOOTY
HIRIYUR
Lines considered
in CEA NEP 2012
SERIES
CAPACITOR
Lines in service
by end Dec 06
MANGALORE
POOLING
POINT
DODBALLAPUR
HASSAN
NELAMANGALA
NAGARJUNA
HOODY
1000 MW
MYSORE
BIDADI
TO KOHZIKODE (KERALA)
SMNHL
TO KOLAR
Suggested
KARWAR
Evacuation and
NAGARJUNA
Mangalore Project
Evaluation
Fixed Series
Compensation
OPTION -3 HIGHLIGHTS
ADDITIONAL LINE ALONG THE COAST TOWARDS MANGALORE POOLING
POINT FOR NAGARJUNA AND KARWAR POWER
– SERIES CAPACITOR ON THIS LINE MAY BE REQUIRED DUE TO ITS
LARGER IMPEDANCE
– TALGUPPA LINE CAN BE AVOIDED IF NEED BE
ADDITIONAL D/C LINE TO BASAVANA BAGEWADI TO SERVE
N.KARNATAKA AND ALSO CONNECTS TO TWO HVDC B2B EXPORT PATHS
– NARENDRA- KOLHAPUR
– RAICHUR-PARLE
MANGALORE-POOLING POINT TO MYSORE ALSO CAN BE CONSIDERED
– EVACUATION IS SAME AS THE COGENTRIX PROJECT WHICH WAS
SHELVED
MAXIMUM RELIABILITY WITH MINIMUM FOREST CLEARANCE
REQUIREMENT
ANOTHER STATION AT HAVERI CAN BE CONSIDERED FOR EVACUATION
INSTEAD OF HIRIYUR
– LILO OF NARENDRA GUTTUR AT HAVERI
– KARWAR - HAVERI – HIRIYUR D/C QUAD
– THIS WOULD REDUCE THE LINE LENGTHS
– THIS WOULD FURTHER REDUCE FOREST CLEARANCE