Transcript Slide 1

P2 Power Solutions
Active Filter on DG – Newspaper Printing
© P2Power Solutions Pvt. Ltd
Company Profile
 An Innovative Engineering Solutions company focused on ensuring high Power
Quality for it’s customers
 Promoted by a group of IIT Kharagpur graduates
 State of the art production facilities at Noida & Kharagpur
 An ISO 9001:2008 certified company
 Currently delivering products (CE certified) and services catering to the power
and energy demands of the industry
 Dedicated R&D activities in collaboration with IIT Kharagpur to improve and
expand the current range of products and services
© P2Power Solutions Pvt. Ltd
Low Power Quality - Symptoms
 Measurement errors in metering equipments
 Spurious operation of fuses, circuit-breakers and other protective devices
 Voltage glitches in computers systems resulting in lost data
 Electromagnetic interference with TV, radio, communication & telephone
 Malfunctioning of standby generators and associated AVR control equipments
 Excessive temperature rise in motors, transformers
 Failure of Power Factor correction equipments
 Malfunctioning of precision equipments
© P2Power Solutions Pvt. Ltd
Case Study – Client Details
 Sector
-
Newspaper Printing
 DG Rating
-
380kVA
 Peak Demand
-
330A
 Load Profile
-
2x135kW DC drives
15kW Compressor
Lighting Loads
 iTHD
-
28%
 PF
-
0.76
© P2Power Solutions Pvt. Ltd
Case Study – Client Details
 The backup Diesel Generator started hunting whenever the load current
demand went beyond 200A.
 The client wasn’t able to carry out production in full capacity using the
backup generator
 P2 Power Solutions audited the site and found the current harmonic
distortions to be significantly higher than recommended limits
 The power factor was also low due to which the peak apparent current
demand on the DG was high
 We recommended the installation of a P2 Power Active filter for harmonic
mitigation and power factor correction
© P2Power Solutions Pvt. Ltd
Load Profile – Apparent Power
220.0
215.0
210.0
205.0
200.0
k VA
AF OFF
195.0
peak kVA : 208
PF
: 0.76
190.0
185.0
180.0
175.0
2/15/2012
1:44:49.776 AM
11:32.156 (min:s)
2 min/Div
2/15/2012
1:56:21.932 AM
200.0
195.0
190.0
peak kVA : 191
AF ON
PF
: 0.94
k VA 185.0
180.0
175.0
170.0
2/15/2012
12:20:45.388 AM
17:52.722 (min:s)
3 min/Div
2/15/2012
12:38:38.110 AM
© P2Power Solutions Pvt. Ltd
Load Profile – Harmonics
%
40
35
30
25
20
15
10
5
0
AF OFF
2
Ah3
iTHD
5th
11th
2
Ah5
: 12%
: 10%
: 4.5%
2
2
Ah7
Ah9
2/15/2012 - 1:44:51.000 AM
%
AF ON
2
Ah11
iTHD
5th
11th
: 28%
: 23%
: 6.5%
2
Ah13
35
30
25
20
15
10
5
0
2
Ah3
2
Ah5
2
2
Ah7
Ah9
2/15/2012 - 12:33:03.000 AM
2
Ah11
2
Ah13
© P2Power Solutions Pvt. Ltd
Post Installation Condition
 P2 Power’s Active Filter reduced the peak kVA demand on the DG by
improving the Power Factor without any risk of over compensation
 It reduced current harmonic distortions to 12%
 The client was able to run the press at full capacity on DG with our solution
© P2Power Solutions Pvt. Ltd
Active Filter – Working Principle
L1
L2
L3
LOAD
Supply
CT1
CT2
CT3
L1 L2 L3 LN
4 wire – Active Filter
© P2Power Solutions Pvt. Ltd
Active Filter – Working Principle
Iactive
Ireactive
Ireactive
Iharmonic
Iharmonic
Ineutral
ILoad
IAF
© P2Power Solutions Pvt. Ltd
Active Filter – Working Principle
ID.G
ILoad
IAF
D.G
active
Load
reactive +
harmonic +
neutral
AF
© P2Power Solutions Pvt. Ltd
Active Filter - Advantage
Ultra Fast
Response
Programmable
No Risk of Over
Compensation
Small Footprint
No Risk of
Resonance
Step less
Correction
© P2Power Solutions Pvt. Ltd
Active Filter – Benefits
Efficient
loading
Reduced
heating
Optimum capacity
utilization
Optimum
Utilization of
Generator
Capacity
Reduction in Peak
current demand
Reduced
losses
© P2Power Solutions Pvt. Ltd
COMPARISON SHEET
Active Power Conditioner
Hybrid PF Compensator
Substitute Technology
P2 Power Active Filter
P2 Power Hybrid Compensator
APFC, RTPFC
PERFORMANCE
< 0.2 milli seconds
Speed
< 0.2 milli seconds
Response time in seconds
Technology
Stepless current compensation
Stepless current compensation
Stepped kVAR compensation
Effectiveness
Effective with highly fluctuating loads
Effective with highly fluctuating loads
Ineffective with fluctuating loads
Power Factor (PF) Correction
True PF compensation
Displacement PF compensation
Displacement PF compensation
Leading/Lagging PF
Both Leading/Lagging PF compensation
Both Leading/Lagging PF
compensation
Lagging PF compensation only
Load Balancing
Negative sequence current injection
Negative sequence current injection
No load balancing
Harmonic Compensation
Harmonic compensation
No Harmonic Compensation
No Harmonic Compensation
Neutral Correction
Possible with 4 wire system
Not possible
Not Possible
Size Advantages
Smallest Footprint
Small
Largest Footprint
Installation (per Ampere)
`3400~`4200
`2300~`2800
`1000~`1800
Resource Intensive
Smallest space requirement
Low on space requirements
Increases cost of space
Capital Cost
Reduced failures
Reduced failures
Can increase failures due to resonance
Operating Cost
Low operating cost
Low operating cost
Recurring cost of capacitor replacement
Returns on Investment
High
High
High with non fluctuating loads
Improved PF
Improved PF
Ineffective with fluctuating loads
Better voltage profile
Better voltage profile
Introduces voltage transients
FOOTPRINT
COST
Reduced failures
Reduced failures
MAINTENANCE
Can increase failure due to resonance
Maintenance requirements
Modular design
Modular design
Easy Maintenance
Spare parts requirements
Virtually maintenance free
Virtually maintenance free
Recurring cost of capacitors/contactors
© P2Power Solutions Pvt. Ltd
Thanks!