September 2009
Presentation Overview
2
Introduction to Associated Technologies (Pvt.) ltd.
Project Location
Location Maps
Project History
Project Plan and Photographs
Salient Features of Project
Environmental and Social Impacts
Conclusion
Associated Technologies (Pvt) Ltd
4/13/2016
Associated Technologies
3
Established in October, 1987
ISO 9001:2000 Certified
Staff Strength 450
.
Field of Activities
General Construction
Roads
Industrial Structures
Telecommunication
Energy Sector (Hydropower, Wind Power, Solar Power)
Large scale manufacturing of galvanized steel structures for telecom
and power sectors
Associated Technologies (Pvt) Ltd
4/13/2016
Karot HPP – Project Location
4
Project Located on –Islamabad-Kahuta- Kotali Road,
74 Km upstream of Mangla Dam
Distance from Islamabad to Karot is app.60km.
Associated Technologies (Pvt) Ltd
4/13/2016
Karot HPP – Project layout
5
Islamabad Kahuta Road
Associated Technologies (Pvt) Ltd
4/13/2016
Karot HPP – Project layout
6
Islamabad Kahuta Road
Associated Technologies (Pvt) Ltd
4/13/2016
Karot HPP – Project layout
7
Kahuta Karot Road
Associated Technologies (Pvt) Ltd
4/13/2016
Karot HPP – Project History
8
Project Site first time Identified in 1984 by WAPDA
and Monenco
In 1994 in a report by WAPDA and GTZ Germany
again recommended this site with better parameters
In 2007 PPIB issued LOI to Associated Technologies
for Karot HPP through a international competitive
bidding.
Associated Technologies (Pvt) Ltd
4/13/2016
Karot HPP – Features of GTZ and MONENCO Studies
9
MONENCO
GTZ
Project Location
33o 36’N 73o 36’ E
Normal Res. Level
433m
Tail Water Level
381m
Rated Discharge
215 m3/s
Gross Head
52m
Net Head
51m
Rated Capacity
93MW
Mean Annual Energy
727GWh
Plant Factor
89.2%
Dam Height
70m
Diversion Tunnel
2 No. 16m
dia and
850m length
Bottom Outlet
10 N0. 14m x
12m
Project Location
Normal Res. Level
Tail Water level
Rated Discharge
Gross Head
Net Head
Rated Capacity
Mean Annual Energy
Plant Factor
Dam Height
Diversion Tunnel
Bottom Outlet
Associated Technologies (Pvt) Ltd
330 36’N 730 36’ E
433m
381m
550 m3/s
52m
51m
240 MW
1613 GWh
76.7%
70m
2 No. 16m
dia. and
850m length
10 N0. 14m x
12m
4/13/2016
Karot HPP – Project Layout
10
Selected Project Layout
Associated Technologies (Pvt) Ltd
4/13/2016
Karot HPP – Longitudinal Section
11
Longitudinal Section of Selected Layout
Associated Technologies (Pvt) Ltd
4/13/2016
Karot HPP – Longitudinal Tail Race
12
Longitudinal Section of Tail Race Tunnel
Associated Technologies (Pvt.) Ltd
4/13/2016
Karot HPP – Concrete Dam
13
Frontal View of Dam
Associated Technologies (Pvt.) Ltd
4/13/2016
Karot HPP – Location of Major Structures
14
Dam , Intake an Power House
Associated Technologies( Pvt) Ltd
4/13/2016
Karot HPP – Location of Major Structures
15
Dam , Intake an Power House
Associated Technologies( Pvt) Ltd
4/13/2016
Karot HPP – Location of Major Structures
16
Dam Axis
Associated Technologies( Pvt) Ltd
4/13/2016
Karot HPP – Location of Major Structures
17
Power House & Tail Race
Associated Technologies (Pvt) Ltd
4/13/2016
Karot HPP – Geotechnical Investigation
18
Summary of the Geotechnical
Investigation Neotectonic Works
Geotechnical Assessment
Total Number of B/H
17
Rock Type
Total Drilling Conducted
1840 m
Shear Parameters
Seismic Refraction Survey
2000 m
Water Pressure Tests
239 nos.
Geological Mapping
2 Km2
Piezometers are installed and our site
supervisor is recording the water levels
regularly
Three of four faults Belonging to Himaliya
Arc are at distance of 60Km and only one
is at distance of 26Km. Which is also not
dangerous.
Associated Technologies (Pvt) Ltd
Sand Stone
Sandstone ,Silt Stone
C = 16MPa
φ = 30o
Unconfined Compressive Strength
Sandstone
13MPa
Silt and Clays Stone
15MPa
Tensile Strength
Sand stone
Silt and Clay Stone
6MPa
5MPa
Uniaxial Strength
Sand Stone
15MPa
Silt and Clay Stone
16MPa
4/13/2016
Salient Features of Civil Structures
19
Dam Axis
1.75Km upstream of Karot
91 m
1200 m3/s
79m
720MW
3436 GWh
54.5 %
90m
4 No. Francis Turbines
1470 Mill. US$
Bridge
Dam Height
Rated Discharge
Gross Head
Rated Capacity
Mean Annual Energy
Plant Factor
Dam Height
No. and Type of Turbine
Project Capital Cost
Associated Technologies (Pvt) Ltd
4/13/2016
Salient Features of Civil Structures
20
Spillway Gates
Type of Spillway gates
Size
Low Level Sluicing Gates
Type of Gates
Size
Diversion Tunnel
Tunnel Dia.
Tunnel Length
Head Race Tunnels
Tunnel Dia.
Tunnel Length
Associated Technologies (Pvt) Ltd
8 Nos.
Radial
7x15 m
6 Nos.
Radial
6.2 x11
2 Nos.
10m
450m
4 Nos.
10m
160m
4/13/2016
Salient Features of Power House
21
Power House
Type of Power House
Switch Yard
Cavern/Underground
Outdoor
Turbines
No. of Turbines
Type
Capacity
4
Francis
183 MW
Electrical Works
Transmission Line Capacity
Generator
Generator Capacity
Generator Voltage
Associated Technologies (Pvt) Ltd
500Kv
4 Nos. Turbo Units
180Mw/200MVA
18KV
4/13/2016
Economic & Financial Analysis
22
Financial Analysis
Economic Analysis
Reference Date
Discount Rate
Jan 09
12%
Return on Equity
Financial IRR
20 %
12.59%
Levelized Tariff
Payback
Associated Technologies (Pvt) Ltd
70.013 $/MWh
5 years
4/13/2016
Economic & Financial Analysis
23
Financial Analysis
Economic Analysis
Benefit Cost Ratio
1.99
Return on Equity
Net Present Value
Financial IRR
US$ 1029 .78 Million
Economic IRR
21.83 %
Levelized Tariff
Payback
Associated Technologies (Pvt) Ltd
20 %
12.59%
70.013 $/MWh
5 years
4/13/2016
Environmental & Social Impact
24
Minor environmental impacts only during construction
period i-e; air pollution due to heavy construction traffic,
blasting
No significant social impacts besides relocation of some
houses, 7 km road in reservoir area, some shops and roads,
side restaurants, WAPDA grid station and Azad Pattan
Bridge
Above mentioned impacts are too small therefore making
project more feasible and attractive
Associated Technologies(pvt) Ltd
4/13/2016
Structures Effected by Karot HPP
25
Azad Pattan Bridge
Associated Technologies (Pvt) Ltd
Shops & Restaurants
4/13/2016
Structures Effected by Karot HPP
26
Azad Pattan Bridge
Associated Technologies (Pvt) Ltd
4/13/2016
Structures Effected by Karot HPP
27
Grid Station
Associated Technologies (Pvt) Ltd
Roads
4/13/2016
Structures Effected by Karot HPP
28
Road Relocation
Associated Technologies (Pvt) Ltd
4/13/2016
Conclusion
29
No logistical problems due to easy project approach
Project location is close to the national grid system
and load center ,hence there will be no problem in
power dispersal
Project completion time is approximately 4.5 years.
No significant environmental and social impact.Run
of the river project.
Facts and figures brought out in this presentation
lead to ascertain that Karot HPP is an economical
and ESI free proposition compared to other such
Associated Technologies (Pvt) Ltd
4/13/2016
projects in the private and public sectors of Pakistan