TNO Presentation
Download
Report
Transcript TNO Presentation
DINO DEEP: Plans for 2009
User council 20081008
TNO B&O
Geological Survey of the Netherlands
This short presentation
• Assignment
• Progress in 2008
• Plans for 2009
Assignment DINO DEEP
three aspects
• Give users easy access to the Mining Act data
• Make the data and information produced in the Geo-Information
Program publicly available
• Support the partners in the Geological Survey of the Netherlands, i.e.
Advisory Group EA and the mapping of the deep subsurface
Easy access to the Mining Act data
•
Why? To stimulate exploration in the Netherlands (> policy letter 2004)
•
•
How? since 2007 in co-operation with the big
Priorities
1. Basic bore-hole data
2. Scanned logs
3. Directional surveys
Core analyses
LIS- and LAS-files
4. Reports and research bore-hole data
4
Progress 2008
Easy access to the Mining Act data
• Development of DINO-LOGS (LIS and LAS)
• Log scanning project
• Development of DINO-CSM (cores and cuttings)
• More seismic datatypes in DINO-SMC
Easy access to the Mining Act data
DINO-LOGS in 2008
LOGS
• In production for internal use since September
• High-end confidentiality concept is to be implemented (November)
• Conversion of the 20-40.000 files is the main target (OctoberNovember)
• Next step is to link the files to the proper bore-hole (November –
2009)
• First files available at NLOG (December)
Easy access to the Mining Act data
Log scanning project in 2008
AST
• Per ultimo 2008 54,000 logs as separate files available at NLOG
• Remaining NAM logs (>SLIDE-project) zipped and linked to primary
bore-holes available at NLOG
•
•
•
•
Winterhall images processed
NAM images processed, partially unzipped
Scanning of Gaz de France, Total, EBN logs in progress
TNO archives: small part of NAM logs to be scanned
Easy access to the Mining Act data
DINO-CSM in 2008
• Data has been converted
• Application will be in production in November
CSM
Easy access to the Mining Act data
Seismic data in 2008
SMC
• Metadata of analogous 2D seismic lines converted (end of October)
• SEGY from vectorisation of images
Progress 2008
GIP data & information & Support GSN
• DINO-MAP (maps as tiffs and datafiles) in production
• New release of DINO-RES (reserves, accumulations): in production
November
• DINO-LIC (licences) in use
Plans for 2009
General
• Business as usual
• Improving the architecture of the DINO system
• Improving the datamodel for all sample related data
Easy access to the Mining Act data
Co-operation with the big 4
Expected status per ultimo 2008
1. Basic bore-hole data:
fine tuning
2. Scanned logs:
in progress
3. Directional surveys:
started
Core analyses
started
LIS- and LAS-files
start in 2009
4. Reports and research data waiting
Plans for 2009
Easy access to the Mining Act data
AST
• Completion of the Log scanning project
• Modest start with scanning of reports from the TNO Archive
• Implementation of high-end confidentiality
• Start to monitor Mining Act data supply (workflow management)
Plans for 2009
Easy access to the Mining Act data
BRH
• Processing of the directional surveys provided by the big 4
• Processing of the (conventional) core analysis data provided by the
big 4
Plans for 2009
Easy access to the Mining Act data
• Processing of workovers and quality control of well data
• Implementation of QC-rules for production figures in DINO
RES
Plans for 2009
Easy access to the Mining Act data
LOGS
• Linking of converted files to the proper bore-hole completed
• Starting the processing of LIS & LAS provided by the big 4
• Extraction of (p, T) data from the files
Plans for 2009
GIP data & information & Support GSN
• Development of DINO P&T
• Maintenance of DINO-RES
• Production of facies interpretations
• Production of composite well logs
• Scanning of the Coal Mine Archives (continued)
Questions?