MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK is

Download Report

Transcript MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK is

«MALAYA SOSNOVKA»
INDUSTRIAL
INNOVATIONS PARK
Chelyabinsk region
- is situated in the centre of Russia on the border between Europe and Asia;
- the territory is 88.5 thousand sq.km, or 0.5% of the whole territory of Russia;
- is located on the crossing of highways that run from the North to the South and
from the West to the East
2
Economic Potential Of The Chelyabinsk Region
Among the Russian Regions:
1st place as to production of finished steel and macaroni
3d place as to poultry products
4th place as to production of steel pipes
5th place as to shipments volume in processing industries
6th place as to foreign investments
12th place as to agriculture products volume and retail turnover
The enterprises output 27% of all-Russian steel and
roll stock, 10% of steel pipes and 22% of macaroni
The regional long-term rating is – BB+
According to the national scale - «ruAA+» prognosis - «Stable»
(rating agency Standard & Poor's )
3
Information On The Ground Area in
“Malaya Sosnovka” Industrial Innovations Park
There is no encumbrances or
restrictions on the grounds
available here.
Within the framework of IIP
there is no sanitary zone and
permanent structures and
forest
Legal category is
«Settlement Area».
4
Advantages Of The Industrial
Innovations Park “Malaya Sosnovka”
Total Area – 200 Hectares
Close Proximity to the regional centre (the
distance of 2 km to
the borders of
Chelyabinsk)
Facilities Availability (Gas, Water/Sewerage, electric
energy supply)
Railway (Trans-Siberian main) near by – the
main adjoins the Park
15 thousand people live
within the distance of 5 km,
200 thousand people – 10
km, 800 thousand people –
15 km
Federal highway М5 is at the distance of 1 km
5
Engineering Facilities
«Malaya Sosnovka» Industrial Innovations Park
6
Infrastructure Aggregates of
«Malaya Sosnovka»
Industrial Innovations Park
#
Resources Type
Resources In Use
1.
Gas supply
17124.Cubic нм a day
2.
Water supply/
Sewerage
2059 cubic metres a
day/ 1940 cubic
metres a day
3.
Electric energy supply
38 mW
4.
Heat supply
102.144 gCal a hour
7
Infrastructure Of “Malaya Sosnovka”
Industrial Innovations Park
Electric Energy Supply
1. from the substation “Asphaltnaya” of 110/10 kW, 2×6,3 МВА, (power transformer
will be substituted for 2×25 МВА). Power capacity is 38 mW
2. During the period of construction electric energy supplying will be carried out
according to the temporary scheme of 1mW .
Gas Supply
From Gas Distribution Station-3 through gas pipeline of high pressure (P=0.6 mPa,
D700 to Chelyabinsk ). The gas maximal consumption estimate to cover requirementsx
of heating and ventilation and hot water supplying (boilers) and technological ones is
17124.2 cubic.hm a hour.
The gas high pressure distribution pipe (P=0.6 mPa) is 2,780 m.
The necessity to install gas regulating stations in the zones of industrial enterprises will
be determined within gas supply designing process by those enterprises.
8
Infrastructure Of “Malaya Sosnovka”
Industrial Innovations Park
Water Supply
Строительство сетей водоснабжения D200 – 5,2 км
Sewerage
Measure
unit
Quantitatve
index
piece
1
Automatic Flow Tank D300 Construction
km
2.2
Pressure header D200 construction
(from SS №2 to SS «Serazak»)
km
1.4
Installations
Sewerage station №2, Q=30-50 cubic m./h
Heat Supply
Installations
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
# 1 (for the lots #1, #2)
#2 (for the lots #3, # 4 and # 5)
# 3 (for the lots #6, # 7 and # 8)
# 4 (for the lots # 9)
# 5 (for the lots # 10, # 11, # 12, # 13, # 14 and # 15)
#6 (for the lots #16, #17 и # 18)
Boilers capacity considering
Losses and own
requirements
30 mW (25.8 gCal/h)
22 mW (18.92 gCal/h)
8,0 mW (6.88 gCal/h)
31 mW (26.7 gCal/h)
17.4 mW (14.96 gCal/h)
11.0 mW (9.5 gCal/h)
9
The First Residents in
“Malaya Sosnovka” Industrial Innovations park
Danieli – Metallurgical equipment works
(agreement for investment cooperation is
signed)
North Neoplan – auto and bus assembly
plant
«Russkiy Basalt» L.L.C. – works to
output basalt fibre and composite
materials based upon them
10
Measures to Support Investors
Lots in the Industrial Innovations park with ready-made infrastructure
Start-Up Office for Foreign Investors offers consulting and translation and
interpreting services as well as premises and office equipment use free-ofcharge
Support in regulating all permissive documentation
Rendering state guarantees in investment projects
Tax deductions for the period of 5 years:
▪ profit tax reduced to 4,5 % points;
▪ property tax reduced to 50%
Municipal authorities provide land lease preferences
11
Start-Up Office For Foreign Investors Within
The Framework Of The Ministry For Economic
Development Of Chelyabinsk Region
Mail Address: office 609, 159
Kirov str., Chelyabinsk
Phone: 007-351-7793083
Fax: 007-351-7793084
E-mail: [email protected]
12