Interconnect Planning, Synthesis, and
Layout for Performance, Signal
Reliability and Cost Optimization
SRC Task ID: 605.001
PI: Prof. Jason Cong (UCLA)
Students: Lei He, David Pan, Xin Yuan
Mentors: Dr. Prakash Arunachalam (Intel)
Dr. Norman Chang (HP)
Dr. Wilm Donath (IBM)
Dr. Stefan Rusu (Intel)
Project Overview
Objective: investigate an
interconnect-centric design flow and
methodology, consisting of:
Interconnect
Planning
Interconnect
Synthesis
Interconnect
Layout
Key Issues in Interconnect Planning
Three levels of planning:
Interconnect
architecture planning (pre-design)
Interconnect
planning with RTL-floorplan
Interconnect
planning with physical-level
floorplan
Enabling tools: interconnect estimation
models for interconnect synthesis/layout
Review: Accomplishments in Year 1
Efficient (constant time) and accurate (90%) interconnect
delay estimation models for 2-pin nets under different
interconnect optimization algorithms [Cong-Pan, IWLS’98,
SRC/TECHCON’98, ASPDAC’99]
Optimal wire sizing (OWS)
Simultaneous driver and wire sizing (SDWS)
Simultaneous buffer insertion/sizing and wire sizing (BISWS)
Interconnect architecture planning [Cong-Pan,DAC’99]
Propose a unified wire-width planning framework
Obtain a surprising result that our pre-determined two-width can
achieve close to optimal solution for a large wire length range !
Can handle different objective functions
Accomplishments in Year 2
Efficient and accurate interconnect estimation
models for multiple-pin nets [Cong-Pan,
TAU’99]
Buffer block planning for interconnect-driven
floorplanning [Cong-Kong-Pan, ICCAD’99]
Further study on interconnect architecture
planning
Interconnect Estimation for Multiple-Pin Nets
G
G0
S1
Cs3
Cs1
S3
Sn
Csn
Input
Cs2
S2
Objective: estimate delay/area under different
interconnect optimizations (e.g, OWS, BISWS) quickly
(100K - 1M nets per second)
Different targets:
1. Minimize the delay to a single critical sink (SCS)
2. Minimize the maximum delay (defined as the tree delay) for
multiple critical sinks (MCS)
Estimation for Multiple-Pin Nets
Very difficult:
No
closed-form wire shaping or buffer insertion
All available optimization algorithms are
iterative based
Multiple critical sinks may exist at the same
time !
Our approach
Reduce
the multiple-pin net estimation problem
into one or several 2-pin net estimation
problems, then use our previous (Year 1) results
Reduction for OWS of SCS
G
S1
Cs1
S3
G0
Sk
Csk
Input
Cs2
G0
G
Sk
C1
Input
S2
C2
Csk
Single-Line-Multiple-Load (SLML)
OWS for SCS
Transform SLML to SLSL (i.e., 2-pin net)
Rd
l1
lk
l2
Sk
W
C1
C2
Ck-1
Ck
OWS for SCS
Transform SLML to SLSL (i.e., 2-pin net)
Rd
lk
l2
l1
Sk
W
C0
C1
C2
k
i1li
j 1
l
CL
CL
Ck-1
j
Cj
k
C 0 Cj CL
j 1
Delay/Area Estimation for OWS/SCS
Closed-form delay estimation for the critical sink
1l
2 1l
Tows ( Rd , l , CL) RdC 0 2
Rdcf
W ( 2l ) W ( 2l )
where
1
1
4
rca ,
1
2
2
Rdrcacfl l
rca
RdCL
W(x) is Lambert’s W function defined as wew x
Closed-form area estimation for the critical path
Aows ( Rd , l , CL)
r (cf l 2CL)
l
2 Rd ca
Summary for Interconnect Estimation
Develop delay and area estimation models for
multiple-pin nets with consideration of various
interconnect optimizations
Consider different optimization objectives
Single
critical sink (SCS)
Multiple critical sinks (MCS)
Apply various optimization alternatives:
Optimal
wire sizing (OWS)
Buffer insertion/sizing and wire sizing (BISWS)
Model 5mm
TRIO 5mm
Model 10mm
TRIO 10mm
Model 20mm
TRIO 20mm
Model 5mm
TRIO 10mm
2
2.5
1.5
2
W_avg (um))
Delay (ns)
Delay/Area Comparison with TRIO
1
0.5
0
0
5000
10000
15000
20000
L_1 (um)
TRIO 5mm
Model 20mm
Model 10mm
TRIO 20mm
1.5
1
0.5
0
0
5000
10000
L_1 (um)
15000
Rd = 180ohm, C1 = 100 fF, C2 = 10 fF
One internal load, l1 = 0.1 to 0.9 x l (l = 5, 10 or 20 mm)
Max. allowable wire width is 20x min. width; wire is segmented in
every 10um.
20000
Accomplishments in Year 2
Efficient and accurate interconnect estimation
models for multiple-pin nets (Cong-Pan,
TAU’99)
Buffer block planning for interconnect-driven
floorplanning (Cong-Kong-Pan, ICCAD’99)
Further study on interconnect architecture
planning
Motivation for BBP
For high-performance DSM designs, many buffers
may be inserted to optimize/meet interconnect delay
(e.g., up to 800,000 for 50nm tech., [Cong’97, SRC
Work Paper])
The introduction of so many buffers will
significantly change a floorplan; thus shall be
planned to ensure timing/design convergence.
Need proper buffer block planning (BBP) to address
buffer location constraints (e.g., hard IP blocks)
“dead area” utilization
regularity for ease of layout and power/ground network
sharing
Buffer Block Planning Problem
buffer blocks
white space
grey (soft) block
(limited buffers)
black (hard) block
(no buffer allowed)
Given: initial floorplan, buffer capacity for each soft
block, and performance constraint for each net;
Output: “optimal” location/dimension of buffer
blocks such that the overall chip area and the number
of buffer blocks are minimized.
Feasible Regions for BI
Feasible region is the maximal region that a buffer
can be placed to meet given delay constraint.
1 buffer
driver
CL
driver
k buffers
CL
Feasible Regions for BI
We obtain the closed-form formula for FR’s
Important observation: even under tight delay
constraint, FR for BI can still be pretty large!
=> FR provides a lot flexibility to plan buffer location
6000um
7000um
8000um
9000um
10000
8000
um
6000
4000
2000
0
0
0.2 delta 0.4
0.6
• FR distance
under different
delay budgets
• Delay budget is
(1+delta) Topt (the
best delay by
optimal buffer
insertion)
Feasible Regions for BI
FR extended to 2-dimension with obstacles
sink
source
2-D FR
Restricted (RES) line (delay minimal BI positions)
Overview of BBP Algorithm
1. Build polar graphs for given floorplan;
2. Build tile data structure;
3. For each tile, compute its area slacks;
4. Compute FR(s) for each net;
4. While (there exists some buffer to be inserted) {
Pick_A_Tile that can insert most buffers w/o area
penalty; if no such tile exists, pick the one with most BI
demand ;
Insert_Buffers into : insert all those buffers whose FR’s
intersect with to create BB w/o area penalty; or insert
one buffer into to expand its channel;
Update chip dimension, FR, and area slacks, etc.
}
Experimental Setting
Two Scenarios (for buffer insertion flexibility):
RES:
restricted buffer insertion position(s) as to
minimize delay
FR: feasible buffer region as to meet delay
constraint
Two Algorithms (for buffer clustering):
RDM:
a buffer is randomly assigned to any feasible
location
BBP: buffers are assigned with appropriate
clustering
6 MCNC + 5 randomly generated circuits (0.18um tech)
#nets that meet delay constraints
1200
1000
800
600
400
200
0
RDM/RES
RDM/FR
BBP/RES
BBP/FR
FR provides a lot more flexibility than RES (e.g.,
to avoid obstacles) during BI, thus can better
meet delay constraints
Area Increase (%) due to BI
5.00
4.00
3.00
2.00
1.00
0.00
RDM/RES
RDM/FR
BBP/RES
BBP/FR
BBP/FR can effectively cluster individual buffers
together with marginal area increase (less than 2% in all
above test cases), by high utilization of “dead areas”.
Comparison of #BB
600
500
400
300
200
100
0
RDM/RES
RDM/FR
BBP/RES
BBP/FR
BBP reduces #BB from RDM by a factor of up to 3x;
BBP/FR further reduces #BB from BBP/RES by up to 34%
Accomplishments in Year 2
Efficient and accurate interconnect estimation
models for multiple-pin nets (Cong-Pan,
TAU’99)
Buffer block planning for interconnect-driven
floorplanning (Cong-Kong-Pan, ICCAD’99)
Further study on interconnect architecture
planning
Our
two width-planning is still valid for certain
range (2x) of driver size variation
Currently investigating wider range of variations
Deliverables
Development of efficient and accurate interconnect performance
estimation models for interconnect-driven synthesis and planning
(Completed - 30-Jun-1999)
Development of interconnect architecture planning framework
(Completed - 30-Jun-1999)
Development of efficient algorithms for integrated interconnect
planning & floorplanning capabilities at the physical level
(Completed - 30-Sep-1999)
Development & validation of accurate noise models to guide the
interconnect synthesis algorithm for signal reliability (Planned 31-Dec-1999)
Development of optimal or near-optimal interconnect synthesis
algorithm for multiple spatially or temporally related signal nets
for performance & signal reliability optimization (Planned - 31Dec-1999)
Development of efficient algorithms for integrated interconnect
planning & floorplanning capabilities at the RTL-level; Software
(Planned - 31-Dec-2000)
Technology Transfer
TRIO (TRIO-Repeater-Interconnect-Optimization)
package
Integrated into Intel design technology
Available on the web:
IDEM (Interconnect Delay Estimation Model) package
Prototype provided to Intel
Package will be available this week to all SRC member
companies:
http://cadlab.cs.ucla.edu/~trio
http://cadlab.cs.ucla.edu/~trio
BBP (Buffer Block Planning) for physical level
floorplanning
Interest from Intel and HP
Summary and Future Work
Efficient and accurate interconnect estimation
models
Interconnect architecture planning
Buffer Block Planning
Future Work:
Noise
estimation and planning
RTL interconnect planning
Milestones
Development of a computational model for interconnect architecture
planning based on a given design characterization (specified in terms of
target clock rate, interconnect distribution, depths of logic,network, etc.)
(31-Dec-1998)
Development of estimation models for interconnect layout optimizations
suitable for pre-layout synthesis and planning (31-Dec-1998)
Development of efficient algorithms for integrated interconnect planning
and floorplanning capabilities at the RTL-level (31-Dec-1999)
Completion of the ongoing effort on the development on a multi-layer
general-area gridless routing system (31-Dec-1999)
Development of optimal or near-optimal interconnect synthesis algorithm
for multiple spatially or temporally related signal nets for performance
and signal reliability optimization (31-Dec-1999)
Development and validation of very efficient but accurate noise models to
relate the noise with the physical parameters to guide the interconnect
synthesis algorithm for signal reliability optimization (31-Dec-1999)
Development of efficient algorithms for integrated interconnect planning
and floorplanning capabilities at the physical level (31-Dec-1999)
Development of efficient algorithms for integrated interconnect planning
and floorplanning capabilities at the RT-level (31-Dec-2000)