North Sulawesi - Confindustria
Download
Report
Transcript North Sulawesi - Confindustria
OUTLINE:
I.General
description of North Sulawesi
II.Potential Resources
III.Proposed Investment:
Infrastructure: Toll Road, Railway
Special Economic Zone Development (KEK):
Manado-Bitung
Energy: Geothermal
Agriculture: Export Commodities
Tourism
GENERAL INFORMATION OF NORTH SULAWESI
MAP OF NORTH SULAWESI
1. Area: 15 272.44 km2
(4 Municipalities and 11 Regions)
2. Population: 2.27 million people
3. Macro Economic Indicator (2011)
i. Economic growth 8 %
ii. GRDP US$ 4,719,303
iii. Per Capita Income US$ 2,786
iv. Total Export: US$ 375,850,000
v. Total Import: US$
71,350,000
4. National Human Development
Index (HDI) Rank in Indonesia: 2
AGRICULTURE/ESTATE:
CORN, PADDY, COCONUT,
CLOVES, NUTMEG, AND HORTICULTURE (FRUIT AND
VEGETABLES)
FISHERIES:
SEAWEED, SKIPJACK, BLUE AND GOLD
SNAPPER, WAEGIU SNAPPER, PACIFIC RED SNAPPER, and
EPHINEPHELUS SPILOTOCEPS
RENEWABLE ENERGY:
GEOTHERMAL, HYDRO,
SOLAR, AND OCEAN THERMAL ENERGY CONVERSION
(OTEC)
Manado-Bitung Toll Road
Project Cost and Financing
US$ 366,8 million
Manado-Bitung Toll Road
technical aspect
Length 43,6 km, Design speed 80,00100,00 km/h, number of lane 2 x 3, lanes
of width 3,60 m
INVESTMENT OPPORTUNITY IN
SPECIAL ECONOMIC ZONE BITUNG
1.
2.
Areas : + 2.000 Ha;
Location: City of Bitung
& Minahasa Utara
Regency.
SPECIAL ECONOMIC ZONE BITUNG
Special Economic Zone at Bitung City as a
main port focusing on fisheries and agroprocessing industries. Location prepared
2000 ha. Whereas 120 hectares ready to
built area as an incentives for investors .
Why?
Special Economic Zone Bitung will become
cargo consolidation center, to
accommodate the distribution of
commodities from other regions in Sulawesi,
North Mollucas, Mollucas and Papua to be
exported outside the country through
Bitung Port.
SPECIAL ECONOMIC ZONE BITUNG
Target Market:
Domestic and International Market
Project Scope:
Fishing port
Multi warehouses
A container freight service (CFS) terminal which will be developed on
the reserved land between 3 to 5 hectares for Container Yard (CY).
Sufficient power supply for the industrial areas
Other infrastructures include telephone lines, water supply, drainage,
and central sewage treatment plant will be provided.
Project Estimation Cost: US$ 60,000,000
Project Document Availability: Feasibility Study
Railway Plan
Trans Sulawesi from
Bitung (North Sulawesi) to
Makassar (South Sulawesi)
1st Stage, Railway:
Bitung-Gorontalo: 250km
GEOTHERMAL POWER PLANT
Potential 400 MWe in Minahasa: ,
estimated cost
US$ 800.000.000
In Bolmong: Potential 300 MWe,
Estimated Cost US$ 600.000.000
Why?
Manado City needs
about 75 MW power
supply
2. Real estate developments
need 60 MW
3. IHP needs 100 MW
4. Mining Industries; 60 MW
5. Manado-Bitung IEDZ
(Integrated Economic
Development Zone);
needs 50 MW
1.