gsc11_joint_12 Developed Status of FTTH in China
Download
Report
Transcript gsc11_joint_12 Developed Status of FTTH in China
SOURCE:
China Communications Standards Association
(CCSA)
TITLE:
Developed Status of FTTH in China
AGENDA ITEM:
Joint 4.4
CONTACT:
Mr. Mao Qian ([email protected])
GSC11(06)_JOINT_12
Developed Status of FTTH
in China
China Communications Standards Association
(CCSA)
1 April 2016
GSC: Standardization Advancing
Global Communications
Outline
General
FTTH technologies developing in China
Trial and application situation
Standards developing status
summary
GSC: Standardization Advancing Global
Communications
24 April 2006
2
General
There are total 4.05M km cable have been installed
in China
160×10Gb/s and 80×40Gb/s DWDM system have
been used in commercial network
ASON, MSTP have been deployed in core and
Metro network.
Access network is still the bandwidth bottleneck.
GSC: Standardization Advancing Global
Communications
24 April 2006
3
Outline
General
FTTH technologies developing in China
Trial and application situation
Standards developing status
summary
GSC: Standardization Advancing Global
Communications
24 April 2006
4
Technology Choices
Two major FTTH architectures: P2P and PON.
P2P good for: enough CO space, subs sparsely located and
their distances to CO vary, and/or high scalability requirements
in b/w.
P2P SDH for big and medium corporations
P2P Ethernet for homes and small businesses
PON good for: limited CO space, subs are closely located
and their distances to CO similar, low scalability in # of users
and b/w.
Both P2P and PON be used in China.
GSC: Standardization Advancing Global
Communications
24 April 2006
5
Technology Choices
APON is used very less in China
EPON dominates FTTH market
For home and small office with high-density
Provide POTS, Internet, IPTV, VOIP, and maybe CATV
Cheap and easy to evolve to NGN
GPON will be mainly used for FTTO
For medium size corporations with high-density
Provide POTS, Internet, IPTV, VOIP, leased lines
Make the best use of exiting SDH network resource
GSC: Standardization Advancing Global
Communications
24 April 2006
6
GEPON products (OLT)
17U sub-frame,48Gb/s capacity.
18 slots,2 for core switching,16 for
line cards
2×GEPON-OLT/card, one OLT
supports 1:32 splitter.
Per sub-frame supports 1024 ONU.
GSC: Standardization Advancing Global
Communications
24 April 2006
7
GEPON products (ONU)
FTTO type
Support 1 or 2×PON、8×POTS、4×FE、
2×E1
220V/-48V
Power supply optional。
~
=
• FTTH type
• Support 1×PON、2×POTS、2×FE、
1×RF (for CATV)
• 220V power adapter.
• Spare power supply.
GSC: Standardization Advancing Global
Communications
24 April 2006
8
Outline
General
FTTH technologies developing in China
Trial and application situation
Standards developing status
summary
GSC: Standardization Advancing Global
Communications
24 April 2006
9
Advantaged conditions
M
10K
70
60
50
40
BB user
30
20
10
0
2002
No. of Internet user in China
Home
Co.
2003
2004
2005
No. of Broad-Band user in China
Bar
Uni.
Pub.
Other
Enter Internet location
GSC: Standardization Advancing Global
Communications
Source: CNNIC
24 April 2006
10
FTTH Target Market
High end residence, especially the new builds, will be the starting
point for FTTH
They are wealthy, seeking for modem life with advanced
technologies
High end
residence
Large scale deployment, easy for planning, deployment and
maintenance
Most users in business building/CBD requires high bandwidth and
integrated services. This type of users generates high ARPU
They need triple play plus TDM leased lines
Business/CBD
They are more concerned of stability and quality,not sensitive to
cost
Internet bar are very popular in China, they usually closely located
to each other and need lot of b/w
ADSL does not meet b/w requirement, FTTH is a good solution
Internet bar
Because of close location, PON is a good choice
GSC: Standardization Advancing Global
Communications
24 April 2006
11
China’s FTTH Roadmap
Stage 1
Stage 2
Stage 3
Research and
development
Testing and field trial
Commercial deployment
and operation
Phase1:Testing
Phase3:Small
Scale Deployment
Equipment maturity
and availability
Operation and
maintenance
Phase2:Field Trial
Deployment and
business model
2003.11
2004.6
2004.12
2005.9
GSC: Standardization Advancing Global
Communications
2007
2006.6
24 April 2006
12
FTTH Current Deployment
By end of 2005, about 10K commercial FTTH subscribers and
another 10K in field trials. By end of 2006, may be 120K.
The biggest FTTH network has about 1000 subscribers
Beijing, Wuhan, Shanghai and Hangzhou are major cities with
FTTH deployment, more than 20 cities are involved.
China Telecom and China Netcom are two major carriers in
FTTH deployment and operation
Almost all the deployments are using GEPON
The major equipment vendors include Fiberhome, UTstarcom,
ZTE, ASB and Huawei
About 75% of over all FTTH deployment using Fiberhome’s
equipment
GSC: Standardization Advancing Global
Communications
24 April 2006
13
FTTH example
High-end
High-end
Residence
Residence
House
GSC: Standardization Advancing Global
Communications
24 April 2006
14
Zisong FTTH Deployment Field
Cabinet with splitter inside
Cabinet in the building
Insider of the Cabinet
End unit (ONU)
GSC: Standardization Advancing Global
Communications
Leading cable
Insider of the ONU
24 April 2006
15
FTTO Example
Building A
Building B
Company E
BP5001
(ONU)
Internet
Company A
Company F
Teleom
Company B
building
Company G
Company C
(ODN)
Company H
Company D
Company I
BP5012
(OLT)
Basement
GSC: Standardization Advancing Global
Communications
24 April 2006
16
FTTH Applications
Multiple play
POTS voice: provide RJ11 interface with built-in IAD
VoIP voice: provide Ethernet interface for IP phone
Internet: Ethernet inteface
IPTV: Ethernet interface to a STB
CATV: CATV cable interface
TDM leased line: E1/T1
Because of regulation restrictions, most deployments do not
provide CATV
IP phone is not usually provided due to its less popularity
GSC: Standardization Advancing Global
Communications
24 April 2006
17
Deployment Model
By telecos and CATV providers
– Same as that for the existing BB access networks
– Invest once and profit in a long term
By telecos, CATV providers and house builders
– House builders responsible for deployment, deployment cost
counts into into house price
– Telecos and CATV responsible for operation and
maintenance
– Multiple parties share the profit
By residential service providers (RSP)
– RSP responsible for network operation and maintenance
– Telecos responsible for providing exit port and b/w
– Services provided by multiple-parties
GSC: Standardization Advancing Global
Communications
24 April 2006
18
Operation Model
By telecos and CATV providers
– Enough operation experience
– No interworking and inter-billing problem
– Hard for triple-play
By residential service providers
– Easy for integrated planning and deployment of the
overall information platform
– Evolution to NGN
– Encourage competition
– Network resource sharing
– Tailong model in Chengdu is the first attempt
GSC: Standardization Advancing Global
Communications
24 April 2006
19
Outline
General
FTTH technologies developing in China
Trial and application situation
Standards developing status
summary
GSC: Standardization Advancing Global
Communications
24 April 2006
20
First level standard of FTTx
CCSA TC6 WG2 is drafting “Broad band
optical fiber access network general” now. It
will be submitted for approval soon.
GSC: Standardization Advancing Global
Communications
24 April 2006
21
Second level standard of FTTH
CCSA TC6 WG2 is drafting “Architecture
and general requirement for FTTH” now. It
will be submitted for approval soon too.
GSC: Standardization Advancing Global
Communications
24 April 2006
22
Third level standard of FTTH
YDN 057-1997
Access network technical requirements——PON
based optical access network
YD/T 1077-2000 Access network technical requirements——narrow
band PON)
YD/T 1090-2000 Access network technical requirements——A-PON
YD/T 1250-2003 Access network test methods——A-PON
2005H41
Access network technical requirements——GPON
2005C3
Access network test methods——GPON
2003H34
Access network technical requirements——EPON
2005H42
Access network test methods——EPON
GSC: Standardization Advancing Global
Communications
24 April 2006
23
Fourth level standard of FTTH
YD/T 981.1-1998 Optical fibre ribbon cables for access network Part1:
Groove type
YD/T 981.2-1998 Optical fibre ribbon cables for access network Part2:
Central tube type
YD/T 981.3-1998 Optical fibre ribbon cables for access network Part3:
loose tube stranded type
YDN 042-1997
Technical requirements of feed cables for access
network
2002H15.6
Indoor fiber cable Part6: Plastic optical fiber cable
YD/T 1294-2003 Technical requirement of A-PON Optical transceiver
module—— 155Mb/s burst type
2004H153.1
Technical requirement of XPON Optical transceiver
module- Part1:For APON(BPON) OLT/ONU
2004B1
Technical requirement of XPON Optical transceiver
module- Part2 :For EPON OLT/ONU
2004B2
Technical requirement of XPON Optical transceiver
module- Part3 :For GPON OLT/ONU
GSC: Standardization Advancing Global
Communications
24 April 2006
24
Outline
General
FTTH technologies developing in China
Trial and application situation
Standards developing status
summary
GSC: Standardization Advancing Global
Communications
24 April 2006
25
Summary
Massive deployment will start in 2007
China’s FTTH market is huge
FTTH still too expensive than existing technologies in
the near future, but the cost will drop rapidly
“China Telecom Law” to be issued soon and will be
promoting three network convergence
Field trial and deployment shift from big cities to
medium cities , then every cities
GSC: Standardization Advancing Global
Communications
24 April 2006
26
attention
GSC: Standardization Advancing Global
Communications
24 April 2006
27