Implementation of River Information System on the Bulgarian Part of
Download
Report
Transcript Implementation of River Information System on the Bulgarian Part of
OPERATIONAL PROGRAMME
ON TRANSPORT 2007-2013
Implementation of BulRIS Project
BULGARIAN PORTS INFRASTRUCTURE CO.
RIS Workshop Danube Commission
April 11, 2011
Budapest
Kuzman Genov
ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia
Agenda:
Project Overview
System Components
Tracking & Tracing
Voice VHF Communication System
ERI
Data Gateway
Notices to Skippers
Communication Infrastructure
AIS and VHF Network Layout & Design
Construction Works
What next ? - Phase II and III
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
Project overview - General
Project duration 18 Months
Start: May 2010
End: November 2011
Contracting Authority: Bulgarian Ports Infrastructure Co.
Budget 5.6 Mil €
Project is co-funded by EFRD - Operational Program on
Transport 2007 – 2013
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
Project Overview - Project Goals
To establish the required base infrastructure for RIS
operation on the Bulgarian part of Danube
Communication infrastructure
Tracking and tracing (AIS) infrastructure
Voice VHF Communication System
ERI
Data Gateway
Notices to Skippers
To apply DIRECTIVE 2005/44/EC of the European
Parliament and of the Council
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
Project Overview – Implementation Schedule
Task 1: Inception report and planing (completed)
Task 2: System design (completed)
Task 3: Construction (in progress)
Task 3: Software development (completed)
Task 4: System installation (in progress)
Task 5: System integration (Q2-Q3’2011)
Task 6: Testing and training (Q3-Q4’2011)
Task 7: Migration to real life operation (Q4’2011)
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components - Tracking and Tracing
AIS based system
8 sites
Exchange of actual, safety related information between
ships and shore
Client – Server architecture
Web interface
Functions:
Provision of a TTI/STI
Provision of traffic management or fairway
information services
Web access for logistic users
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components - Tracking and Tracing
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
Tracking and Tracing - Additional AIS functions
dGPS trough AIS network
Improves the accuracy of the
vessel positioning
Functions:
Correction of GPS
positioning
Compliant with international
recommendations
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System components - Voice VHF Communication Network
8 sites along Bulgarian Danube
Cohabitation with AIS base stations
Independant system
Integration and data exchange with AIS
Graphic presentation of the vessels position
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components - ERI
Allows simplification of cross border procedures
Functions:
Data exchange between vessel and competent authorities
Available via web application
Access according to the user rights
Users:
Vessel parties
Competent authorities
Compliant with European and international standards
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components - ERI
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components – Data Gateway
National and international exchange of RIS data
Functions:
Provision of relevant RIS data
Interface to T&T, ERI and Hull system
Web based users interface
Users:
Governmental users
Commercial users
Different data access rights have to be defined
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components – Data Gateway
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components – Notices to Skippers
Used for fairway information, traffic information and
management as well as voyage planning
Functions:
Available via web service
Automatic translation on 23 languages
Input information for voyage planning
Users:
Traffic/Fairway authorities
Harbour Master’s Offices/Port authority
Police
Shippers
Skippers/Captains
Inspection and customs authorities
Compliant with European standards
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components – Notices to Skippers
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components – Communication Network
Total of 16 sites
14 radio reley links
1 dedicated optical link
1 MAN link
Interlinked togeather to form a closed network
Network is invisble to outside world
Hack proof
Used for AIS and VHF communication
Real time data replication between Ruse and Varna backup
centre
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
System Components – Communication Network
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
AIS and VHF Network - Locations
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
AIS and VHF Network – Radio Coverage
(c) Kongsberg Seatex AS
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
GUI of the Client Application 1/2
(c) Periskal
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
GUI of the Client Application 2/2
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
GUI AIS WEB Application 1/2
(c) Periskal
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
GUI AIS WEB Application 2/2
(c) Periskal
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
Construction Works
Scope of works
Design
Evaluation of radiation influence
Obtainig building permits
Site construction
Exploatation permits
4 new sites
Other sites are existing sites owned by
Bulgarian telecom
Implementation of River Information System on the
Bulgarian Part of Danube - BulRIS
What next? – Phase II and III
Construction of the RIS Center building
Conceptual design finalized
Technical project – start in May 2011
Construction works – start in fall 2011
In operation – end of 2012
Upgrade and development of the services (pre-project study)
Automatic water level measurement/modeling
RIS portal
WLAN access to RIS services
Calamity abatement services
………………………………………
THANK YOU FOR YOUR
KIND ATTENTION