20020507-Plenary-Catlett

Download Report

Transcript 20020507-Plenary-Catlett

I-WIRE
(Illinois Wired/Wireless Infrastructure for Research and Education)
• State Funded Dark Fiber Optical
Infrastructure to support Networking
and Applications Research
• $7.5M Total Funding
• $6.5M FY00-02 (in hand)
• Additional $500k in FY03 and FY04
• Application Driven
• Access Grid: Telepresence & Media
• TeraGrid: Computational and Data
Grids
• New Technologies Proving Ground
• Optical Network Architecture
• Dense Wave Division Multiplexing
• Optical network control and
management
• Advanced middleware infrastructure
• Timeline
• 1994- Governor interest in Internet to
schools
• 1997- Task Force formed
• 1999- I-WIRE funding approved
• 2002- Fiber in place
Charlie Catlett ([email protected])
Starlight International
UIC
Optical Network Hub
(NU-Chicago)
Argonne
National
Laboratory
IIT
U Chicago
40 Gb/s Distributed
Terascale Facility Network
U Chicago
Gleacher
Center
Chicago
James R. Thompson
Center – Illinois Century
Network
Commercial Fiber Hub
UIUC/NCSA
The TeraGrid: A National Infrastructure
For more information: www.teragrid.org
Charlie Catlett ([email protected])
NSF TeraGrid: 14 TFLOPS, 750 TB
574p IA-32
Chiba City
256p HP
X-Class
128p Origin
128p HP
V2500
HR Display &
VR Facilities
Caltech: Data
collection analysis
92p IA-32
HPSS
HPSS
ANL: Visualization
SDSC: Data-Intensive
UniTree
HPSS
1024p IA-32
320p IA-64
1176p IBM SP
Blue Horizon
Myrinet
Myrinet
Sun E10K
NCSA: Compute-Intensive
Charlie Catlett ([email protected])
1500p Origin
TeraGrid Network Architecture
2200mi
Los Angeles
Chicago
Starlight
15mi
Caltech
Cluster
115mi
SDSC
Cluster
Charlie Catlett ([email protected])
140mi
NCSA
Cluster
25mi
ANL
Cluster
I-WIRE
I-WIRE Geography
ANL
Northwestern
Univ-Chicago
“Starlight”
Starlight / NU-C
UChicago
Gleacher Ctr
UChicago
I-290
Main
UIC
IIT
ICN
UIUC/NCSA
UI-Chicago
Commercial Fiber Hub
• Status:
Done: ANL, NCSA, Starlight
Laterals in process: UC, UIC, IIT
• Investigating extensions to
Northwestern Evanston, Fermilab,
O’Hare, Northern Illinois Univ,
DePaul, etc.
I-294
Argonne Nat’l Lab
I-55
Illinois Inst.
Tech
Dan Ryan Expwy
(I-90/94)
(approx 25 miles SW)
Charlie Catlett ([email protected])
U of Chicago
UIUC/NCSA
Urbana (approx 140 miles South)
I-Wire Fiber Topology
Starlight
(NU-Chicago)
Argonne
18
4
Qwest
455 N. Cityfront
UC Gleacher Ctr
450 N. Cityfront
4
UIC
10
4
12
12
4
McLeodUSA
UIUC/NCSA
151/155 N. Michigan
Doral Plaza
Level(3)
• Fiber Providers: Qwest, Level(3),
McLeodUSA, 360Networks
• 10 segments
• 190 route miles; 816 fiber miles
•Longest segment: 140 miles
• 4 strands minimum to each site
111 N. Canal
State/City Complex
2
2
James R. Thompson Ctr
City Hall
State of IL Bldg
FNAL
(est 4q2002)
2
IIT
UChicago
Numbers indicate fiber count (strands)
Charlie Catlett ([email protected])
I-Wire Transport
TeraGrid Linear
3x OC192
1x OC48
First light: 6/02
Starlight
(NU-Chicago)
Argonne
Starlight Linear
4x OC192
4x OC48 (8x GbE)
Operational
UC Gleacher Ctr
450 N. Cityfront
Qwest
Metro Ring
1x OC48 per site
First light: 8/02
455 N. Cityfront
UIC
McLeodUSA
UIUC/NCSA
151/155 N. Michigan
Doral Plaza
State/City Complex
James R. Thompson Ctr
City Hall
State of IL Bldg
IIT
UChicago
• Each of these three ONI DWDM systems have capacity of up to 66 channels, up to 10 Gb/s per channel
• Protection available in Metro Ring on a per-site basis
Charlie Catlett ([email protected])
I-WIRE Economics
• Up front cost of ~$4M for fiber
• 20-year IRU Fiber (existing fiber)
• $700 to $5,000/strand-mile
• New construction (for ‘last mile’)
• $30 to $100/foot ($160-530k/mile)
• Up front cost of ~$2.5M for equipment
• Annual costs
• ~$100k for fiber maintenance, small number collocation spaces
• ~$250k for equipment maintenance, staff effort
Charlie Catlett ([email protected])