Proposed Offset Mirror System
J. Arthur
Be 13mrad
SiC 1.5mrad
24mm offset
SiC 1.5mrad
8.0m
April 7, 2005
Offset mirrors
John Arthur
[email protected]
The Problem
Unfiltered LCLS beam contains significant background
from spontaneous harmonics (Ec ~ 150 keV) and from
Bremsstrahlung from scattered electrons (GeV)
Much of this background lies directly on axis, and it is
time-coincident with the FEL pulse
This is a nuisance for radiological shielding, and a
huge problem for data taking
April 7, 2005
Offset mirrors
John Arthur
[email protected]
The Proposed Solution
Use total-reflection mirrors to deflect FEL radiation
(and 3rd harmonic, up to 24 keV). Use collimating
apertures to eliminate non-reflected background
April 7, 2005
Offset mirrors
John Arthur
[email protected]
Reflectivity vs energy for a flat SiC mirror at 1.5 mrad incidence angle
R > 95% for
E < 24 keV
R < 10% for
E > 28 keV
From Berkeley CXRO calculator: <http://www.cxro.lbl.gov/optical_constants/mirror2.html>
April 7, 2005
Offset mirrors
John Arthur
[email protected]
The mirror system will consist of two mirror pairs. One
pair will be inserted at a time. The SiC pair gives a cutoff
at 24 keV; the Be pair gives a cutoff at 2 keV. Interlocks
can be used, if necessary, to assure that one of the
mirror pairs is always inserted.
Be 13mrad
SiC 1.5mrad
SiC 1.5mrad
24mm offset
8.0m
April 7, 2005
Offset mirrors
John Arthur
[email protected]
Technical Issues
Create new White Beam Optics Enclosure by moving
shielding in FEE upstream
5mm apertures define FEL beam (plus core spontaneous)
Alignment is critical
Need high-quality mirrors
Risk of damage to mirrors from intense FEL pulse
April 7, 2005
Offset mirrors
John Arthur
[email protected]
Proposed layout of FEE
4 ft Fe
3 ft concrete
4 ft Fe
SiC MIR
Be MIR
ADJ SLIT
GAS ATTEN
ADJ SLIT
COLLIM
STOP
SOLID ATTEN
15m
STOP
11.6m
>2M SPACE FOR DIAGS
~0.6M SPACE FOR DIAGS
April 7, 2005
Offset mirrors
John Arthur
[email protected]
4 ft
Fe
3 ft
Concrete
1m
2.13m
3 ft
Concrete
4 ft
Fe
24mm offset
0.65m 1m
8.0m
9.0m
3.78m
11.65m
2.13m
Pop-in camera location
April 7, 2005
Offset mirrors
John Arthur
[email protected]
Status of Proposal
Radiation Physics has examined shielding implications,
presented preliminary report
Discussion between XTOD and XES regarding real estate
in FEE, commissioning plan, etc.
Conventional Facilities implications are understood
Final decision expected soon