Prezentace aplikace PowerPoint

Download Report

Transcript Prezentace aplikace PowerPoint

Implementation of the Kyoto
protocol mechanisms in the Czech
Republic
Climate Change Department
Ondrej Bores
Pavel Zamyslicky
Climate Change Department
Ministry of the Environment
of the Czech Republic
Vrsovicka 65
Praha 10, 100 10
Phone:
Fax:
E-mail:
+420 267 122 937
+420 267 126 937
[email protected]
[email protected]
Contents of the Presentation
 Overview of JI projects
 JI approval and criteria in the Czech Republic
 Planned activities
 Domestic requirements for Track I
 Linking directive (Opportunities and Threats)
 Implementing of GIS in the Czech Republic
 Process of Establishing GIS
Current information (JI)

In total 96 projects registered (PIN)
→ about 1 000 000 tons of CO2ekv./year

Two portfolios
•
PCF Portfolio of projects (16 small hydro, 2 centralized heating)
– total emission reduction 100 000 tons of CO2 / year
•
BTG Portfolio of projects (15 biomass central heating projects)
– total emission reduction 120 000 tons of CO2 / year

Last approved projects (LoA): Lovochemie, SHP Vraňany

Implementation of (CDM) Landfill Gas Methodology (29 projects in
pipeline)

Rest of projects in various stages of implementation
Projects registered in 2006
 249786
083/JI/2006
Bohemia Waste
Management
Landfill Gas Capture and Energy Use Project - Zdechovice
(Chvaletice)
084/JI/2006
EKOBIOENERGO
Heating plant JIH (Třebíč) -Biomass central heating
8410
085/JI/2006
EKOBIOENERGO
Boiler house K-13 (Třebíč) - Biomass central heating
2617
086/JI/2006
MAEN s.r.o.
Landfill Gas Capture and Energy Use Project- Mrsklesy
10000
087/JI/2006
ECOENERG
Wind Power Plant Farm Kryštofovy Hamry
91407
088/JI/2006
BTG
New biomass energy source (CE WOOD, a.s.)
31378
089/JI/2006
BTG
Biomass energy and heat production Trhové Sviny
12155
090/JI/2006
BTG
Biomass central heating system Kněžice
2587
091/JI/2006
BTG
Biogas Unit Kněžice
5507
092/JI/2006
BTG
Biogas Unit Kostelci na Hané (Statek Kostelec na Hané, a.s.)
4346
093/JI/2006
BTG
Biogas Unit Čejč (Horák energo, s.r.o.)
9863
094/JI/2006
Bierhanzl Biogas
Biogas Unit Rožmitál pod Třemšínem
14311
095/JI/2006
TEDOM
Landfill Gas Capture and Energy Use Project - Kozlany
3869
096/JI/2006
TEDOM
Landfill Gas Capture and Energy Use Project - Dačice
2562
50775
JI projects registered by MoE
50%
40%
30%
20%
10%
0%
Landfill Gas
Small Hydro Powerplants
Central Biomass Heating
Number of Projects
Wind Power Plants
Emission reduction per year
Reduction of N2O
Approval process in the Czech Republic
1. Registration of the project by MoE – PIN (LoE)
2. Registration by State Environmental Fund (SEF) –
program 2.8 (assessment)
3. Discussion in working group of MoE (suggestion for
approval or refusal)
4. Ministerial approval (LoA)
Criteria
 Defined relatively generally
• Priority areas (renewables, energy savings, landfill gas projects,
non - CO2 gases, transport…)
• Non-priority areas also possible
• Assessment takes into account environmental, technical and
economic issues
• Case-by-case basis
• Link to → Methodical Guideline for JI Projects in the Czech Republic
http://www.env.cz/AIS/web-pub.nsf/$pid/MZPPZFEQYNJ6/$FILE/Methodical%20Guidelines_EN.doc
Track I eligibility criteria
 Track 1 - necessity of moving forward
 Criteria for Track 1:
 Reporting issues
http://unfccc.int/national_reports/initial_reports_under_the_kyoto_protocol/items/3765.php
• Initial Report was submitted to the UNFCCC
• GHG Inventory
• National Inventory Report
 National Registry System (International Transaction Log)
• ITL - testing operation are starting during spring 2007.
• Operator – Czech Electricity Market Operator, linking with EU ETS
registry
 Other things should not be a major problem
Domestic requirements for Track I
 Learning from problems in JI track 2
 Standardization to a maximum extent possible
 Validation and verification done by accredited local bodies
 Additionality issues? To be considered
 Simplification of procedures as much as possible
 Pooling of projects needed
 Potential for new JI projects?
Linking directive
 Opportunity for EU ETS developers (limit 10 % in the second NAP for
CERs and ERUs)
 Big problem for new member states of the EU - New JI potential
shortening
 Reserve 99 389 allowances per year in NAP2 for indirect linking (only
RES projects with LoA, No allowances for projects with LoE)
 Is there a room for JI in linked regime at all?
 New JI – only (biomass) heating and non – CO2 projects)
 Room for AAU crediting, International Emission Trading and Green
Investment Scheme - GIS)
Implementing GIS in the Czech Republic (I)
 MoU – Denmark, Austria, (Preparation -Japan, Netherlands, Finland, Portugal, Spain,
Slovenia... )
 Czech Republic in a relatively advantageous situation
•
Projected emissions are below Kyoto target (- 24%) = surplus AAUs for sale
•
Available cca 30 mil AAUs per year
Mt CO2ekv.
200
150
100
50
1990
1992
1994
1996
1998
2000
National Emmisions
2002
2004
Kyoto Target
2006
2008
2010
2012
Implementing GIS in the Czech Republic (II)
 Expected amount 50-150 million AAUs per commitment period
(estimation with the highest probability) – Uncertainty - allowances
surplus, national reserve issue ???
 What is the difference between Track I and IET (Article 17 trading in
the form of Green Investment Scheme – GIS)?
 Potential exists in various sectors (energy, transport, industry, …)
 Domestic resources limited – foreign funding welcomed
 Existing framework for funding – National programs
 Capacity of State Environmental Fund, Czech Energy Agency
GIS responsibilities
 Number of issues (responsibilities) to be clarified, but in general:
• MoE responsible for Climate Change and Kyoto flexible mechanisms
(Main coordinating role MoE – Department of Climate Change)
• Cooperation with other ministries (Industry of industry and Trade,
Foreign Affairs, Transport, Agriculture)
• Greening facility – transferring of money to individual projects on the
basis of pre-defined criteria (issue for working group)
• Greening facilities on the Czech side
•
– State Environmental Fund (SEF) – www.sfzp.cz
•
– Czech Energy Agency (CEA) – www.ceacr.cz
The process of establishing GIS
 1) signature of Memorandum of Understanding (MoU)
 2) establishing bilateral expert working group for GIS
 3) criteria for selection of projects (greening, scope of projects,…. )
• Approach for choosing projects (kind, size, sector,…….)
 4) preparation of ERPA(s)
 5) Pilot phase of GIS (testing)
 6) Work phase of GIS
• Funding programme with defined criteria established
• Applicants send applications – assessed against criteria
• List of approved projects – funding
Issues to solve
 State aid – need to be checked (depends on who is the
recipient of money)
 EU ETS – AAU trading not explicitly mentioned – could be a
problem in terms of „crossing“ of various ways of funding
 „Soft“ or „Hard“ greening?
 Resources available up front (payments)? When the concrete
projects need to be presented?
 Role of investor country in approval process?
 Validation and verification projects
Thank you for your attention !