Capacity Building Approach (Draft Version)

Download Report

Transcript Capacity Building Approach (Draft Version)

Project presentation
Closing Workshop
November 22, 2013
Chennai
Folie 1
Dokumentation Ergebnisse 29./30 August 2006 / Folie 1
Goal
 Reduce the vulnerabilities of coastal communities and cities in Tamil Nadu
and Andhra Pradesh, India, to climate change and strengthen capacities of
local authorities and the population on climate change adaptation (CCA),
climate change mitigation (CCM) and disaster risk reduction (DRR).
Folie 2
Dokumentation Ergebnisse 29./30 August 2006 / Folie 2
Key results and achievements in WP 1 (Year 2)
Folie 4
Dokumentation Ergebnisse 29./30 August 2006 / Folie 4
Community Level
City Level
Urban Approach – Integration of CCA & CCM
Engagement
• Introduce the project
• Formal consent through MoU
• Formation of a City Task Force & Stakeholder
Group
• Engaging stakeholders
City level climate change
research and needs
assessment
Developing a detailed city profile and collation of
data which would support further processes
Identification of vulnerable
areas & Community
vulnerability and needs
assessment
• To identify the most vulnerable areas of the city
• To carry out a community needs and vulnerability
assessment in these areas.
• Engaging stakeholders in the process Folie 5
Dokumentation Ergebnisse 29./30 August 2006 / Folie 5
Integration into development plans accelerated
Multiple approaches for mainstreaming adaptation
Key results include:
 Rs. 1.57 crores allocated by AP government for expanding AdaptCap schemes and concepts in Vizag
district
 District disaster management plans in Vizag and Thiruvallur under review with NIDM, to integrate CCA
and DRR
 16 Crores sanctioned in AP by the AP Community based tanks programme by the irrigation dept.
Folie 6
 District officials appointed in Nellore to monitor the pilots and look at developing a climate change
integrated plan at the district level
Dokumentation Ergebnisse 29./30 August 2006 / Folie 6
New approaches to CCA, CCM and DRR
Example of Ponneri: Integration at the city level
 City task force formed with key officials
from Town Panchayat including
Chairperson & RDO, CBOs, DRR experts and
NGOs
 MoU signed for project implementation
 V&NA replicated in 18 wards, V&NA for
entire Town Panchayat being discussed
 Chairperson plans to present results to
Chief Minister, TN
 Attempts for integration with plans of
different government flagship programmes
Mr. Kandasami, Revenue Division Officer and
Ms. DhanLaxmi Mohansundaram, Chairperson,
Ponneri Town Panchayat, presiding the SLD
workshop
Folie 7
Dokumentation Ergebnisse 29./30 August 2006 / Folie 7
New approaches to CCA, CCM and DRR
Integration of CCA & DRR with NIDM, GoI
 The DC, Vizag, DC, Thiruvallur and Relief
Commissioners AP and TN nominated nodal
officers for supporting the development of
VDMPs and DDMPs
 DDMPs Thiruvallur are being reviewed for
preparing a multi-hazard plan
 Training planned for 6 District officers by
NIDM on CCA and DRR integration
CCA and DRR integration Meeting convened
by the District Collector, Thiruvallur
 VDMPs being prepared for 6 communities
in AP and TN on GoI template
 Technical paper on mainstreaming CCA
and DRR is submitted to UNISDR
Meeting with District Collector, Vizag
Folie 8
Dokumentation Ergebnisse 29./30 August 2006 / Folie 8
New approaches to CCA, CCM and DRR
Integration in State Action Plans on Climate Change
 Chapter on community based
adaptation approaches including LAMGs
shared with nodal agency EPTRI, for the
SAPCC, AP
 Inputs for SAPCC-TN prepared and
discussions for integration of CCA and
DRR approaches undertaken with
Department of Environment, Tamil
Nadu
 Meetings conducted with SPC, TN to
look at integration at the State level
 Proposal submitted to NABARD for
funding under the Adaptation Fund
Board
Meeting with Dr. Radhakrishnan, Officer on
Special Duty– Relief and Disaster, TN with NIDM
and SPO, UNDP
Folie 9
Dokumentation Ergebnisse 29./30 August 2006 / Folie 9
Key results and achievements in WP 2 (Year 2)
Folie 10
Dokumentation Ergebnisse 29./30 August 2006 / Folie 10
Andhra Pradesh: Pilot projects in rural communities
Community Selected pilot measures being implemented
Nellore District (AP)
Construction of storage shed for fishing equipment at
Sri Ramapuram
seashore (with fish drying racks)
and
Ramudupalli
Repair road/bridges causeway over the nearby Buckingham
Palem
Canal
SMC activities (irrigation / sprinklers) in the existing
Poovula Doruvu
vegetable /floriculture lands around the village
Prakasam District (AP)
Dasaraju Palli
Water treatment: filtration and pumping by solar; pond
renovation / pipelines to pond
Renovation of irrigation tank, channelization of flood water
to irrigation tank
Vengamukka
Drinking water: upgradating of existing RO plant with
Palem
photovoltaic panels
Visakhapatnam District (AP)
Chepala Dibbada
Palem and
Improvement of piped water scheme
Chukkavani Palem
Individual toilets and sanitation scheme; efficient "Chulas"
Govupeta
(cooking stoves)
Motumala
Status
Completed
Completed
Completed
?
?
?
Funded by AP
Govt.
Completed ?
Folie 11
Completed
Dokumentation Ergebnisse 29./30 August 2006 / Folie 11
Tamil Nadu: Pilot projects in rural communities
Community
Selected pilot measures being implemented
Nagapattinam District (TN)
Kumarakudi
River bund strengthening (and installation of a shutter)
Perumalpettai
Coastal bund construction
Regulation of piped drinking water supply / water
Pillai colony
management
Cuddalore District (TN)
Digging rain water storage unit with irrigation channel,
Chinnakaramedu
fencing and plantation
Kaduvetti
Road side channel bund construction
Nadupalayam
Strengthening backwater river bund
Thiruvallur District (TN)
Kadapakkam
Pond renovation and bund and shutter construction
Thangal
Renovation of drainage channel
Perumpulam
Thirumalai Nagar
Installation of solar street lights
Status
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Folie 12
Dokumentation Ergebnisse 29./30 August 2006 / Folie 12
Pilot examples in AP & TN
Folie 13
Dokumentation Ergebnisse 29./30 August 2006 / Folie 13
Key results and achievements in WP 3 (Year 2)
Folie 14
Dokumentation Ergebnisse 29./30 August 2006 / Folie 14
Awareness raising and capacity building
Activities carried out
– Training material developed
– Training calendar established
– Initial ToTs for local NGOs and first training
round carried out in the villages as part of
the V&NA and pilot framing in 2011
– ToT on Urban Climate Change conducted
CCA and DRR integration Meeting
convened by the District Collector,
Thiruvallur
– 5 Shared Learning Dialogues prepared and
realised in cities
– 36 trainings on CCA, CCM, DRR and pilot
projects conducted at community
Folie 15
– 2 ToTs and 8 training workshops conducted
on Operations & Maintenance
Dokumentation Ergebnisse 29./30 August 2006 / Folie 15
Local adaptation and mitigation guides (LAMG)
 Local adaptation and mitigation guides (LAMGs) developed for all 18
rural communities in AP/TN as living documents
 Rural LAMGs: Part 1 in 2011, part 2 in 2012 done for 18 villages
City LAMGs: Initial version updated in 2012
Folie 16
Dokumentation Ergebnisse 29./30 August 2006 / Folie 16
Ongoing assistance for integration into planning schemes
Dissemination
and capacity
building on
rural and
urban LAMGs
Meetings with
local bodies
Integration
and replication
strategy
Assessment of
assistance
needs during
V&NAs
Integration into
State Level
Action Plans
CCA, CCM
and DRR
in local
planning
Cooperation
with National
Institute of
Disaster
Management
Folie 17
Dokumentation Ergebnisse 29./30 August 2006 / Folie 17
Key results and achievements in WP 4 (Year 2)
Folie 18
Dokumentation Ergebnisse 29./30 August 2006 / Folie 18
Pilot-Visibility: Local Adaptation Projects Website
www.adaptcap.in/projects
Folie 19
Dokumentation Ergebnisse 29./30 August 2006 / Folie 19
International exchange and dialogue through articles and
conference participation
 Project Awarded with Global recognition
at Solution Search
 Article on adaptation financing included in
online libraries
 Article on climate change impact chains in
the water sector submitted to journals
 Appearance of AdaptCap in SEA Change
and German Coastal Newsletter and
several online platforms
 Participation and presentations at
conferences, including Second Asia-Pacific
Climate Change Adaptation Forum
(Thailand)
Folie 20
Dokumentation Ergebnisse 29./30 August 2006 / Folie 20
Some next steps
 O&M trainings for each pilot project and development of O&M plans
(integration of these plans into part 2 of the LAMG)
 Data collection for the M&E framework (overall + pilots)
 Replication process documentation for pilot projects
 Completion of planning integration and assistance strategy (e.g., NIDM)
 Completion and documentation of local capacity building workshops
 Completion of SLDs in Cities
 6 Assistance Strategies
 Accelerate regional networking
 Continue visibility activities (articles, conference participation, updates of
Local Adaptation Projects website, best practice booklet)
 Upscaling activities with Climate Coalition Core Group
Folie 24
Dokumentation Ergebnisse 29./30 August 2006 / Folie 24
Thanks for your attention
www.adaptcap.in