Services and integration

Download Report

Transcript Services and integration

TPC Collaboration
Meeting
Services Integration
•100kV power supply
•LV Bus Bars
•Other cables
•Gas systems
•Cooling integration
•Rack layout
2-3 June 2003
C. R. Gregory
1
TPC 100kV Cable
– The routing of the 100kV cable from the
Counting Room up to the Detector
– Cable lengths:
• Counting room to resistance
• Resistance to detector
• Inside detector
2-3 June 2003
C. R. Gregory
76.6
13.3
2.5
meters
meters
meters
2
100kV power supply located
In Counting Room level 4
2-3 June 2003
C. R. Gregory
3
Counting room level 4
2-3 June 2003
C. R. Gregory
Cable passes through
L3 magnet doors 4
Resistor box
2-3 June 2003
C. R. Gregory
5
Cable onto TPC
2-3 June 2003
C. R. Gregory
6
LV Bus Bars
• Market survey complete
• Selection of companies complete
• Technical Specification in final stages of
preparation
• Drawing work still to be competed
• Call for Tenders will be sent out very soon
2-3 June 2003
C. R. Gregory
7
Base Line Bus Bar System
RB24 side
RB26 side
TPC Detector
Analog (60A)
20
14**14
14
18 units on Mini S.F.
18 units
14 **14
20
14
20
14
14 **14
Analog (60A)
14
20 *14
* 14
20
14
14 **14
Digital (150A)
20 *14
* 14
14
14 **14
20
14
18 units on Mini S.F.
18 units
20
14**14
14
Digital (150A)
14 *14
An 1 PASA (49A)
TRD Detector
54 units
14 *14
14 *14
9 units
14 *14
An 1 ADC (65A)
14 *14
54 units
Analog 2 (51A)
14 *14
54 units
14 *14
Digital (42A)
14 *14
14 *14
9 units
DCS cards
14 *14
TOF Detector
20 * 14
DC/DC converters
(54A)
2-3 June 2003
20 * 14
20 * 14
18 units
18 units
72 units through doors
(segment 2 only)
C. R. Gregory
20 * 14
DC/DC converters
(54A)
8
e
S
g
m
e
n
1
t
o
u
d
i
s
t
e
o
m
fa
g
n
e
t
m
i
L
o
t
i
u
s
f
p
p
y
l
e
S
g
m
e
n
2
t
h
t
o
r
u
g
h
m
a
g
n
e
d
t
o
o
s
r
C
o
o
n
i
l
g
u
f
ld
in
i
P
o
w
e
s
r
u
p
p
y
l
n
i
(
a
r
c
)
s
k
S
e
g
m
e
n
3
t
n
i
d
i
s
e
3
L
m
a
g
n
e
t
m
i
L
o
t
i
u
s
f
p
p
y
l
F
e
l
i
x
b
e
l
e
s
c
o
i
t
n
s
C
o
o
n
i
l
g
u
f
ld
io
u
t
E
e
l
c
c
i
r
t
a
y
l
n
i
u
s
a
l
e
t
d
h
y
d
r
a
u
c
i
lc
o
u
p
n
i
l gS
u
b
d
e
e
t
c
o
t
o
f
r
n
t
=
C
o
n
n
e
c
o
i
t
n
s
e
n
d
e
e
lc
t
r
o
n
c
is
Generic layout of a Bus Bar unit
Chicanes in magnet doors
have been completed
2-3 June 2003
C. R. Gregory
9
Services on RB26 side
TPC services have to pass
Over TRD & TOF detectors
Without limiting access
2-3 June 2003
C. R. Gregory
10
Bus Bar layout on
RB26 Side
2-3 June 2003
C. R. Gregory
11
Bus Bars outside of
L3 magnet
2-3 June 2003
C. R. Gregory
12
Bus Bars outside of L3 Magnet
2-3 June 2003
C. R. Gregory
13
Installation
Review
March ‘03
Services Integration(4)
Services
Services for TPC & ITS
on RB24 side of ALICE
Mini Space Frame
This allows for the access
to the forward detectors
Transparency by S. Maridor EST/IC & D. Gabriele EST/LEA
2-3 June 2003
39
Presented by C. R. Gregory EST/LEA
C. R. Gregory
14
Other Cables
• Well defined
– Looking to close on this at the June
Technical Board
– See attached list
2-3 June 2003
C. R. Gregory
15
Gas System
•
•
•
•
Construction work continuing
Test set-up in preparation
Gas building ready
Primary supplies will be ready by end June
2-3 June 2003
C. R. Gregory
16
2-3 June 2003
C. R. Gregory
17
2-3 June 2003
C. R. Gregory
18
2-3 June 2003
C. R. Gregory
19
Cooling Integration
• Cooling units (see talk by Miguel Santos)
• Location of cooling units defined
• Number & diameter of cooling pipes
required for the TPC is well under stood
• Passages for these pipes defined
2-3 June 2003
C. R. Gregory
20
TPC Cooling Pipe
Layout (1)
2-3 June 2003
C. R. Gregory
21
TPC Cooling Pipe
Layout (2)
2-3rd. September 2002
2-3 June 2003
TPC Collaboration Meeting
19
C. R. Gregory
22
Racks
• Some racks have been re-located
• To optimize cable lengths
• Reduce Bus Bar lengths
2-3 June 2003
C. R. Gregory
23
General Layout of Racks in UX25
Racks for TRD & TOF are to be
Moved nearer to the Detectors
TPC power supplies on RB24 side
Remain in same place under
shielding
Racks for TPC, TRD & TOF
LV power supplies RB26 side
2-3 June 2003
C. R. Gregory
24
Racks containing
Power Supplies
2-3 June 2003
C. R. Gregory
25
Conclusions
• TPC services are well understood
• Concerns
-Bus Bar Call for Tender must not be delayed
-Integration of other pipes and cables has still to
be detailed
2-3 June 2003
C. R. Gregory
26
2-3 June 2003
C. R. Gregory
27
2-3 June 2003
C. R. Gregory
28
2-3 June 2003
C. R. Gregory
29