Hcal sx5 status/issues
overview
• CCM temperature readout
• DAQs for sx5hcal
• HCAL installation status
• SATOCRICH
CCM: to modify or not to modify
1. ccm does not have a perfect design (with respect to
temperature measurement).
2. vladimir/vitali tried to improve it by introducing 0.5Mohm
resistors between signal and ground.
this solution cured original problem (presence of signal from
channels even if no temperature probe is connected).
3. vladimir noticed that with 0.5Mohm resistors, there is still a
problem of correlation between channels.
he checked that by introducing 1.3khom resistors to ground,
the correlation is effectively gone.
Not to modify ?
4. however this solution is no good, as it makes temp sensors 4 times less sensiitve.
for voltage definition, inside CCM there is 6kohm resistor. by introducing 1.3kohm, we get
~ 4 times less volts/deg C. so we go from granularity of 1.5deg (original design) to ~ 6deg
(1.3kohm).
5. one can expect that if we introduce lower resistors (maybe 20kohm) in parallel with 6kohm
internal resistor, then temp sensitivity wil change only minimally. and this would be the
best compromise.
6. however, at this point, we think that is may not be worth an affort to patch up CCM design.
we have installed all 18 CCMs on HE-, and another 18 CCMs on HB+.
we plan to start installation of CCMs, RMs, and Calboxes on HE+ starting aug8.
so at that point any additional modification jobs on CCMs delay installation and
commissioning of all hcal subsystems significantly.
7. we think it is better invest our time into proper installation and commissioning of hcal.
in order to give us reliable temp control on RBXes, we will continue (german is leading this
effort) to develop/install independent temp sensor/control system.
DAQs for sx5hcal
1. moe3 (hb+ side), until end of august
hb+ wiresourcing
long-term burn-in of hb rbx
satocrich project
when drew/jeremy are ready to setup/test hcal internal trigger in
september, we will use also moe3 for this
2. moe6: (hb- side), until end of september:
hb- qc/burn-in
he- laser + wiresourcing
3. 3rd daq (parts from fnal/b28): as soon as it is fuctional:
he+ commissioning
ho+2 commissioning
Many people are now working
full-time in sx5:
vitali smirnov, peter goncharov, vladimir
epshteyn, sasha vishnevski, petr
moissenz, alexei volkov, tola lipatov, alexei
shnyrev, german martinez, Alexi
Mestvirishvili , michal szleper, alvin
laasanen, oscar gonzalez, salim cerci
numan Bakirci, pelin kurt, huseyin topakli,
also support upport from arjan, ianos,
richard
he- status
• All (but one) HE- sector fixed:
s8/rm3, on HV (need time to access)
s14/rm1/ch11 recovered
• Started to reposition OF p. panel to its
final (?) location on HE- (near) side
• Water flow OK in all sectors , 25deg water,
RBXes at 35-37 deg, DCS LV cutoff set at
45deg
• Two aux. patch panels installed
he- plans for next two weeks
(aug4-aug18)
• Laser commissioning (using old/qc laser)
check optical path (laser-> 80m cable->
aux p. panel -> 20m cable -> LDB ->
Calbox -> HPD
check timing of sectors with laser after OF
p. panel is installed in new place
Preparing for 5mCi sourcing of he• 5mCi source installation into ‘rewamped’
source driver (ianos/alvin)
• Radiation zone issues (pawel/sasha)
• Source logistics (sasha)
• Upgrade of DAQ: HTRs, 2nd DCC (arjan)
w/o Slink64
only two (maybe 4?) spigots at a time
• Sourcing analysis (peter m.)
he- action items
•
•
•
•
•
•
•
Add two more HV power supplies (sergey)
Start laser work (configuration file- arjan)
Reconnect OF p. panel (peter/vladimir)
Aux p. panels (sasha, nicolai)
Calbox channels assignment (alexei)
HEM/burn-in analysis (pelin/husain/irina)
Start assembly of source elevator (alexei)
he+ status
• All copper and OF cables installed
• Satelite cables (TTC, Calbox readout)
pulled
• Water to be connected this week
• LDB installed, connected to RBXes
• Ready to start installation of RMs, CCMs,
Calboxes
• Ready to connect OF to p. panels
he+ plans for august
• Install DCS system (sergey)
• Install HV system (sergey/alexei)
• Start working on LV system (CAEN style,
arjan/vladimir)
• Connect cables to 3rd DAQ (still not at sx5)
hb+ status
• started wire sourcing of hb+ wedges with
1.5mCi source
• so far 3 wedges done, hope to reach a
rate of 1 wedge/day
• Day-time: install cables/run LED test
• Eve-time: wiresourcing
• In parallel, we do long term stability
test/burn-in of one of hb RBXes
satocrich project
(german, irina, numan, pete m., peter g., pawel)
Install four muon counters:
two 40cmx80cm, inner radius of w15
two 30cmx108cm, outer radius of w6
Feed coincidence to princeton trigger board (arjan)
See signal in few towers (phi=2,3, eta=1-5)
Also working on event display (andrei loginov)