HiLumi-Pres-Template-16-9-2logo-v2
Download
Report
Transcript HiLumi-Pres-Template-16-9-2logo-v2
SM18 news
Marta Bajko
For TETM the 19th of January 2017
Content
Magnet test stand layout @ CERN
Vertical cryostats : ongoing upgrades, status and next steps
HFM
Cluster D
Horizontal test benches: ongoing upgrades, status and next steps
Cluster A
Cluster E
Sc link test stand
60 m long prototype set up 1-3
110 m long series
Operation
Marta Bajko for TETM 19th of January 2017
2
Magnet test stands layout @ CERN
THE SUPERCONDUCTING MAGNET TEST STAND AT CERN in SM18
• 10 horizontal benches
OPERATION
• I= 0.12 kA-30 kA
• T = 1.9 K to 70 K He
• withstanding U = up to 3 kV
CLUSTERS
A
B
C
HORIZONTAL BENCHES
F
Is in a building of 7200 m2
INSTALLATIONS
over
test stands
• 5 which
vertical the
cryostats
,
for
magnets
occupies
• 1 feed box for supercritical He,
aboutfor
50%.
• 1 cryostat
LN2,
CLUSTERS
D
E
STRING and SC LINK
CRYOGENIC
ZONE
SUPERCONDUCTING RF CAVITY TEST
ZONE
LN2 TEST ZONE
Marta Bajko for TETM 19th of January 2017
3
Vertical test stands
Cluster G
Cluster D
The vertical cryostats zone , called Cluster G of about 400 m2 is under upgrade with an extra space called Cluster
D of 150 m2 to accommodate the test of larger diameter magnets @ higher operating current for HL LHC.
Marta Bajko for TETM 19th of January 2017
4
Magnet test stand: photos@ CERN
INSTALLATIONS
• 5 vertical cryostats ,
• 1 feed box for supercritical He,
• 1 cryostat for LN2,
• 10 horizontal benches
OPERATION
• I= 0.12 kA-30 kA
• T = 1.9 K to 70 K He
• withstanding U = up to 3 kV
Marta Bajko for TETM 19th of January 2017
5
Cluster G recently finished upgrade (HFM)
20 KA
POWER
CONVERTER
with EE and
DUMP
RESISTOR
“DIODE/LEAD”
CRYOSTAT :
@ 4.2 K
PRE COOLING WITH
He GAS AND
QUENCH BUFFER
FOR COLD He
RECOVERY
The circuit is
distributing
current towards
vertical
cryostats or the
feed box via a
commutator
“LONG” CRYOSTAT :
3.8 m long and 600
mm diameter @ 1. 9 K
“SIEGTAL”
CRYOSTAT :
1.4 m long and
800 mm diameter
@ 1. 9 K
The new cryostat in this zone is the:
CRYOGENIC
FEED BOX FOR
He 4.2-80 K
“HFM” CRYOSTAT ALLOWING
MAGNETS TO BE TESTED WITH
1500 mm diameter and 2. 5 m length
Marta Bajko for TETM 19th of January 2017
6
HFM cryostat : photos
Marta Bajko for TETM 19th of January 2017
7
Cluster G status
1. MQXF tested successfully in the cryostat
2. FReSca2 magnet is under installation
Review and reduction of He consumption.
Optimisation of the cryo performance
•
•
•
•
Measurements
Sealing
Current leads ( CLIQ?)
ect
Marta Bajko for TETM 19th of January 2017
8
Cluster G: next steps
Secondary electrical
powering circuit of HFM:
•
•
•
•
•
Current leads 15kA
Fast switch ( IGBT) 2 x 7.5 kA
Water cooled cables
Dump resistor
Power converter
The circuit is
distributing
current towards
vertical
cryostats or the
feed box via a
commutator
Target date for finishing : July 2017
Marta Bajko for TETM 19th of January 2017
9
Vertical test stand upgrade
Cluster D
Marta Bajko for TETM 19th of January 2017
10
Cluster D : on going upgrade
EE and DUMP on
the 2 m LEVEL
POWER
CONVERTERS
30 kA AT
GROUND
LEVEL
PREPARATION ZONE
AT 0 AND -3 m LEVEL
CRYOSTAT : 4.8 m
LONG AND 800 mm
@ 1. 9 K
ELECRICAL AND
CRYO RACKS
NEAR THE
CONTROL ROOM
5.5 m
2m
0m
TWO ODH ARE IN
THE -3 m ZONE
(justified by
presence of N2)
-3 m
CONTROL ROOM
NEAR THE
CLUSTER
Integration by A.Kosmicki
-10 m
COLD He RECOVERY BUFFER 10 m3 à 5 bar, UNDER THE
NEW OVERHEAD CRANE ALLOWS
WORKING AREA IN CONFINED
HADLING 25 t AND AT -3 m LEVEL
SPACE
th of January 2017
Marta Bajko for TETM 19
11
Cluster D in pictures
Ref.
Construction:
H. Botella, R. Morton, E. Perez Duenas,
Safety: E. Paulat
Marta Bajko for TETM 19th of January 2017
12
Cluster D status
Commissioning:
Warm circuit at 30 kA done
Warm circuit endurance test: today
Cold test without Current Leads
Cold test with Current Leads
Cold test with magnet
Magnet ( MQXFS) to be tested in April 2018
Marta Bajko for TETM 19th of January 2017
13
Cluster D : next steps
Secondary electrical
powering circuit of cluster D:
•
•
•
Current leads 15 kA
Water cooled cables
Power converter 4 kA 4 quadrant
Target date for finishing : 2018
Marta Bajko for TETM 19th of January 2017
14
Horizontal test benches on going upgrades
Cluster A
The horizontal test zone Cluster A to F excluding D is composed by 10 benches equipped with 5 independent
electrical circuits allowing to test magnets up to 15 kA @ 1.9 K. Two clusters are planned to be upgraded to 20 kA
capacity.
Marta Bajko for TETM 19th of January 2017
15
Horizontal test benches: next steps
Cluster A
Cluster F
Secondary electrical powering circuit of cluster A :
•
•
Current leads 2 kA = 600 A
Power converter 2 kA 1 quadrant = 600 A
Primary and secondary electrical powering circuit of
cluster F
Marta Bajko for TETM 19th of January 2017
16
Sc link test stands
For 60 m long prototype for two different test with different set up
Marta Bajko for TETM 19th of January 2017
17
1st set of Sc link tests
Length = 60 m
Cryostat feeding
Cable feeding
Scheme of the setup of the 60m-long test station
with the 4-wall cryostat and the cable
being fed from the present feedbox.
Available
Marta Bajko for TETM 19th of January 2017
18
2nd set Sc link of tests
Length = 60 m
He recovery line ( 5-30 K 10 g/s max)
Cryostat feeding
Cable feeding
Scheme of the setup of the 60m-long test station
with the 2-wall cryostat and the cable
being fed from the present feedbox and
additional He
recovery ligne
Shopping list:
Warm line, heaters, instrumentation
Marta Bajko for TETM 19th of January 2017
19
3rd set of Sc link tests
Length = 60 m
He recovery line ( 5-30 K 10 g/s max)
Cryostat feeding
Cable feeding
Scheme of the setup of the 60m-long test station with
the 2-wall cryostat being fed from the present
feedbox , cable from horizontal
benches He recovery from a new line
Shopping list:
Warm line, heaters, instrumentation
Water cooled cables
Marta Bajko for TETM 19th of January 2017
20
Sc link test stands: next steps
For 110m long series…. To be defined where… we started to working on it
Marta Bajko for TETM 19th of January 2017
21
Operation Sm18
Presently in SM18 in test:
A1: D2L103 ( priority1)
Long : MQY ( priority3)
Diode: Splice test
Siegtal: SMC ( priority 2)
In preparation:
HFM: FRESCA2
Siegtal : Sushi
Marta Bajko for TETM 19th of January 2017
22
Thank you for your attention
Marta Bajko for TETM 19th of January 2017
23