Tracker Power System –
Requirements and Studies
Katja Klein
RWTH Aachen University
CMS Upgrade Workshop
May 14th, 2009
https://twiki.cern.ch/twiki/bin/view/CMS/SLHCTrackerPower
[email protected]
Outline
• Introduction & requirements
• Ongoing activities
• Open questions
• Next steps
• Summary & conclusions
Katja Klein
Tracker Power System
2
Motivation
• Increased granularity & functionality increase of power consumption
• Lower operation voltage larger currents for same power consumption
• Services must be re-used (P ~ I2)
• Decrease of material budget highly desirable
Novel powering scheme inevitable for the tracker (strips & pixels)
Katja Klein
Tracker Power System
3
Powering Schemes
Two powering schemes are widely discussed in the SLHC community:
Serial Powering and Powering via DC-DC converters
Power Task Force recommendation (Jan. 09, chair P. Sharp):
“The ‘Task Force’ recommends that the baseline powering system for an upgraded
CMS Tracking system should be based on DC-DC conversion,
with Serial Powering maintained as a back-up solution. [...]
It is important that design decisions taken during this process do not preclude
reverting to the back-up solution at a later date.”
Converter C converts a “high“ DC input voltage to voltage needed by detector D (V0)
Conversion ratio r = V0 / Vin < 1
Lower input currents and
power losses:
Pdrop = RcabI02r2
Katja Klein
Tracker Power System
4
Buck Converters
Inductor-based converters provide large currents and are very efficient
- the buck converter is often studied as the simplest inductor-based variant
Switching noise
Ferrites saturate for B > ~2T
air-core inductor needed
Vin 12V
HV-tolerant
semi-conductor
technology needed
radiation-hardness
radiates noise
Efficiency
Material budget
Schematic scheme of a buck converter
(feedback control loop not shown)
Katja Klein
bulky
Tracker Power System
Space constraints
5
“Charge Pump“ = Switched Capacitors
In simple step-down layout: capacitors charged in series and discharged in parallel
Iout = nIin, with n = number of parallel capacitors
Capacitors are external
space, mass (but less than coil!)
Efficiency
Many switches
noise, losses
No regulation
(costs efficiency)
Lowish currents
Must be rad.-hard and tolerate Vin
Katja Klein
Tracker Power System
6
Strip Power System Requirements
• Compatibility with both trigger and tracking layers
• A large conversion ratio (depends on tracker power consumption)
• Adequate efficiency (depends on r, but roughly > 80%)
• Provision of all necessary low voltages: Vana = 1.2V, Vdig ~ 0.9V, Vopto = 2.5V
• Provision of ~ 50mA per chip, i.e. ~ 1A per module for outer tracking layers
• Provision of up to several Amps for trigger modules (depends on module variant)
• Provision of sufficient bias voltage with sufficient granularity
• Must not compromise the noise behaviour of the system (depends on FE-PSRR)
• Compatibility with existing Low Impedance cables
Low voltage: V < 30V, I < 20A; high voltage: V < 600V, I < 0.5A
• Must respect heat tolerance of cable channels
• Contribution to material budget as low as possible
• Must be small enough to fit (details depend on integration)
• Save operation & easy start-up of thousands of modules
• Include proper grounding and shielding strategy
Katja Klein
Tracker Power System
7
Power WG Activities
Topic / Scheme
Electronics development
System tests
Material budget
DC-DC conversion
(baseline
solution)
Non-isolated inductor-based:
CERN (technology, ASIC
development, simulation);
Aachen (PCB);
Bristol (air-core coil)
Aachen (strips)
Aachen
Transformer-based:
Bristol
Fermilab, Iowa,
Mississippi (pixels)
Charge pump:
PSI (pixels);
CERN (strips)
Piezo-electric transformer: Serial powering
(back-up solution)
(Fermilab)
Fermilab, Iowa,
Aachen
Mississippi (pixels);
Rochester? (strips)
Implementation
Karlsruhe (Powering via cooling pipes): on hold
Power supplies, cables: not covered
Katja Klein
Tracker Power System
8
Phase-1: Power to the Pixels
• Phase-1 pixel upgrade: 4 barrel layers and 3 end cap disks
FPIX power system layed out for 3 disks, no problem
BPIX: 1612W 2919W (for L = 21034cm-2s-1)
cannot be supplied by current power supplies
• How to power this BPIX detector? Options being worked out by PSI
1. Modify & use existing CAEN power supplies (A4603)
Status: modified PS in hands, to be tested
2. Use switched-capacitor DC-DC converters (“charge pump“)
a. Both for analog & digital power, conversion ratio 1:2
Vana = 1.7V, Vdig = 2.5V device in HV-tolerant semiconductor process
b. Only for analog power, conversion ratio 1:2
c. Derive Vana from Vdig with 2:3 converter (less cables and connectors);
in combination with modified PSs
Evaluation of options is ongoing, no conclusion yet
Katja Klein
Tracker Power System
9
On-Chip Charge Pump for Pixels
Discharging
Charging
• Prototype by PSI (`08)
• Conversion ratio 1:2
• Iout = 24mA (1 ROC)
phi 1
phi 1
VIN
C1
phi 2
• 0.25 m IBM CMOS
phi 1
C2
VOUT
• Ext. capacitors (10-100nF)
phi 2
• Test of noise behaviour with
ROC to be done
• Future options: version for 1 module (16 ROCs); ratio 2:3
cap- cap+
GND
VDD
del
Vout
SW1 SW2 SW3
clk
Katja Klein
GND
VIN
C1
phi 2
phi 1
C2
VOUT
phi 2
Output voltage ripple (f=4MHz, C=10nF)
f
[MHz]
P_SC
P_Ri
Pout
10
2%
14 %
84 %
20
4%
15 %
81 %
40
8%
18 %
74 %
Tracker Power System
5 mV/div
10
Pixel Power Distribution Studies
• Fermilab, Iowa, Mississippi
• Power distribution studies with pixel ROC (PSI46)
(Commercial) inductor-based converters with various PCB-embedded inductors,
switched-capacitor regulators, Serial Powering Interface Chip (developed at Fermilab)
• CAPTAN DAQ system with daughter boards
for DC-DC conversion (ready) & Serial Powering
flexible, powerful DAQ used during integration,
can read out 480 ROCs
• Measurements have just started
Katja Klein
Tracker Power System
11
Development of Converter ASICs
• CERN electronics group, F. Faccio et al.
• Buck controller ASIC in HV compatible AMIS I3T80 technology (0.35m CMOS)
First prototype “AMIS1“ (summer 2008): working, but large switching losses
Second improved prototype “AMIS2“ submitted, expected back in May 09
Semiconductor technology is not sufficiently radiation hard
Nevertheless the AMIS2 will be tested within CMS (RWTH Aachen)
AMIS2
Vin = 3.3 – 12V
Vout = 1.2, 1.8, 2.5, 3.0, 5.0V
Iout < 3A
fs = 400kHz – 3MHz
Katja Klein
Tracker Power System
12
Development of Converter ASICs
• Identification of a sufficiently radiation-hard technology is crucial!
• New semi-cond. technology: IHP (Frankfurt/Oder) SiGe BiCMOS (SGB25VD)
Irradiation tests of single LDMOS transistors (N and P)
X-rays up to 350Mrad TID,
protons (24GeV) up to 1016p/cm2
Sufficienctly rad-hard for r > 20cm
• Buck ASIC including all main features submitted by CERN to IHP last week
expected back in ~ August
• More irradiations planned by CERN electronics group (May/June):
Various generations of IHP LDMOS transistors
AMS 180nm LDMOS transistors
• Development of r = ½ charge pump in 130nm (CERN + external student)
I = 60mA; developed for Atlas, but could also be used in CMS readout chips
Katja Klein
Tracker Power System
13
Strip Tracker System Tests
• Commercial buck converters used to systematically investigate effects on
CMS FE-electronics (Enpirion EN5382D: fs = 4MHz, Vin < 7V) (Aachen)
• Aspects studied: ferrite/air-core inductor, solenoid/toroid, Low DropOut reg., shielding
Current FE-electronics is sensitive to conductive & radiated converter noise
Improve PCB layout, develop efficient filtering and low mass shielding
(ongoing, report in June meeting)
--- No converter
--- Toroid converter
--- Toroid converter + 30m shield
--- Toroid converter + LDO
--- T. converter + LDO + 30m shield
Katja Klein
Tracker Power System
14
Simulation of Strip Material Budget
• Reduction of material is one of the main motivations for novel powering schemes
• Simulation of the effect of powering schemes on the MB in CMSSW (Aachen)
Total MB of:
TEC modules
TEC Converters
TEC electronics & cables: - 30.0%
Original TEC
TEC with
buck converters
r = 1/8
• Many options/layouts have been studied (position, 1-step/2-step, shielding, ...)
Typical gain: ~20-30% for electronics/cables, ~5-7% for total MB
(Caveat: gain in motherboards is not only due to decreased current)
Katja Klein
Tracker Power System
15
Tasks / Open Questions & Next Steps: Pixels
• Phase-1
How to power the pixel barrel detector during phase-1?
Is a switched-capacitor converter needed?
Various options being evaluated (PSI, 2009)
Charge pump development has started (PSI)
• Phase-2
Are additional buck-like converters on service cylinder needed?
What is their effect on the pixel electronics?
Investigation of powering schemes on ROC (US, 2009/10)
Katja Klein
Tracker Power System
16
Tasks / Open Questions & Next Steps: Strips
• Overall system layout must be defined, in particular
conversion ratio (depends on tracker power consumption)
1-step vs. 2-step scheme (depends e.g. on conversion ratio)
# of converters/module (Vana, Vdig)
integration onto module or motherboards (space, EMI, practicability, etc.)
position of converter (close to module, or higher radii)
bias voltage delivery (problematic, if > 600V are needed)
integration of GBT components (2-3W, some parts need 2.5V)
• Specifications for ASIC & PCB, driven by tracker needs
output voltage & current, conversion ratio, switching frequency,
tolerable noise level, minimal efficiency, tolerable dimensions etc.
Intense discussion over next couple of months, taking into account the
recent layout developments/options
Try to narrow down powering options and develop a consistent scheme
until autumn, to streamline powering R&D and guide other WGs
Katja Klein
Tracker Power System
17
Tasks / Open Questions & Next Steps: Strips
• Interplay with readout ASIC(s)
- PS rejection ratio, additional circuitry (regulators, charge pump)?
To be understood/decided together w/ FE designers; discussion has started
• Cables (not covered)
• Power supplies (not covered)
• Performance of converter ASIC (efficiency, optimal layout (buck?) etc.)
Development of custom buck converter prototypes (CERN, 2009/2010)
• Semiconductor technology
Irradiation of transistors from IHP and AMS (CERN, until autumn 2009)
• Noise effects on CMS tracker structures
System tests with converter prototypes (Aachen, 2009/2010)
System tests with SLHC readout chips, hybrids, modules (Aachen, 2010 - ?)
• Integration of DC-DC converters into tracker system
Developm. & optimization of PCB + inductor (Aachen, CERN, Bristol, 2009/10)
Grounding & shielding, system design (> 2010, needs rod prototypes)
Katja Klein
Tracker Power System
18
Summary & Conclusions
• HV-tolerant rad-hard process identified important step forward
• Development of buck converter ASICs progressing well
• Development of switched-capacitor chips started at PSI and CERN
• Understanding of noise issues progressing at several institutes
• Discussions during next couple of months should lead to a strip powering
scheme that obeys all boundary conditions and is technically feasible
• Iterate and converge towards Technical Proposals
Katja Klein
Tracker Power System
19
Back-up Slides
Katja Klein
Tracker Power System
20
R&D Proposals relevant for Power WG
07.01: R&D on Novel Powering Schemes for the SLHC CMS Tracker;
by RWTH Aachen (contact person: Lutz Feld), submitted in October 2007;
status: approved
07.08: R&D in preparation for an upgrade of CMS for the Super-LHC by UK groups;
by University of Bristol, Brunel University, Imperial College London, Rutherford
Appleton Laboratory (contact person: Geoff Hall), submitted in October 2007;
status: approved
08.02: An R&D project to develop materials, technologies and simulations for silicon
sensor modules at intermediate to large radii of a new CMS tracker for SLHC;
by University of Hamburg, Karlsruhe University, Louvain, HEPHY Vienna, Vilnius
University (contact person: Doris Eckstein), submitted in March 2008;
status: approved
08.04: Power Distribution System Studies for the CMS Tracker;
by Fermilab, University of Iowa, University of Mississippi (contact person: Simon
Kwan), submitted in June 2008;
status: approved
Katja Klein
Tracker Power System
21
Open Tasks
• Cables
Understand consistency of LICs with new powering scheme
Looks ok except for bias voltage
Understand how to integrate LICs into new scheme
Cables from PP1 to detector need replacement
• Power supplies
Very likely power supplies need to be exchanged
Develop specs, identify and interact with company, test etc.
• Need to identify groups willing to take these responsibilities
Katja Klein
Tracker Power System
22