GOAL
To improve the availability of and
access to quality health care by
people, especially for those residing
in rural areas, the poor, women and
children.
Health Indicators
Current Status & Goals
INDICATORS
INDIA
RAJASTHAN
CURRENT
GOAL 2011
CURRENT
GOAL 2010
CRUDE BIRTH RATE
(2004)
29.0
21.0
24.1
21.0
INFANT MORTALITY
RATE (2004)
67
56
58
<30
MATERNAL
MORTALITY RATIO
(1998)
670
285
407
<100
TOTAL FERTILITY
RATE
(NFHS-II)
3.8
2.1
2.8
2.1
COUPLE
PROTECTION RATE
(2005)
43.9
65
45.4
60
Process Indicators
for Achieving Goals
Indicators
Present Level
2006
Goals for
2011
•Full ANC
• Complete
immunisation of
children
14.7 %
48 %
60 %
85 %
• Unmet need
15 %
5%
• Institutional
deliveries
31.4 %
70%
Sector Wide Concept
NRHM
Health
RCH
PH
AYUSH
NDCP
Determinants
IEC
RHSDP
Nutrition Sanitation
Drinking
Water
NRHM
State Project
Management
Unit
District
Project
Management
Unit
State Health Mission
State Health Society
District Health Mission
District Health Society
Block Health &
Sanitation committee
Village Health &
Sanitation committee
CHC
MRS
PHC
MRS
Sub Centre
ASHA
PW
Untied
Fund
NRHM Stakeholders
AYUSH, PRI, DWCD
ARC, SIHFW, IEC
NRHM
Transport, DPR
Education, Coop,
TSC, NGOs, PPP
Village Level
• 30,000 ASHA Sahyogini selected & trained (1st Round)
• MCHN Day being organised in all 40,000 villages
• Panchamrit campaign for underserved areas ( 20,000 pregnant
women registered and 6.5 lac children immunized)
• Microplanning for MCHN – Social Mobiliser identification
• Community Needs Assessment survey completed
Village Health & Sanitation Committee to be activated
Village Household Survey to be undertaken
Village Health Plan to be developed
Identity Card & Drug Kit for ASHA under process
Strengthening Health Facilities
• 800 Sub Centre to be upgraded
•Joint Bank Account of ANM & Sarpanch opened in 10030 Sub
Centres. Untied Fund of Rs. 10000/- p.a. transferred to these
accounts.
•Untied fund used for buying weighing machine, B.P Instrument,
repairs etc
•Rs. 25,000/- released to all PHCs for strengthening
• Rs. 1,00,000/- released to all CHCs.
• Telephone connectivity in all PHC/ CHC
• Funds received from GoI to upgrade all 325 CHCs to IPHS
• CHCs being developed with RHSDP and Consultant Agency
Components of IPHS
• Hospital Building
– RHSDP
• Housing
– NRHM
• Drugs & Equipments – NRHM & RHSDP
• Manpower
– State Government / NRHM
• Training
– NRHM
Man Power Planning under NRHM
• Under NRHM implementation frame-work following additional
manpower arrangements are envisaged :* 2 ANM Sub Centres.
* 3 Staff Nurse per PHC
* 7 Specialists and 9 staff nurse per CHC.
* District cadre of ANMs and doctors.
* Contractual engagements of doctors/specialists through
Medical Relief Societies/District Health Societies.
* Block Level Management of health system.
* Incentives for rural posting of doctors.
Operationalising 24 * 7 Facilities
• 360 institutions selected for 24 * 7 services
• 42 District/ Sub Division Hospitals, 213 CHCs, 105 PHCs
• One functional facility in all 237 Blocks
• Facility Survey completed for 180 institutions.
• Ensuring functional services to be a priority of District
Administration.
Other Initiatives
• Population Stabilization Pilot in Tonk & Jhalawar
• Swasthya Sakhi Project initiated in 5 districts (Jhalawar, Barmer,
Banswara, Bharatpur & Sikar)
• Kaithun CHC telemedicine pilot with Sir Gangaram Hospital
• School Health Programme
• Drug supply for Sub Center / PHC/ CHC
Action Plan & Challenges
• Monitoring as per the State / District Template
• Microplanning at village level
• Support & Mentoring of ASHA- Sahyogini
•Preparation of Village/ Block / District Action Plan
• Ownership by stakeholders
• Mainstreaming & empowering Programme
Management Units.
Fund Flow under NRHM
• Funding for 05-06 for RCH / NRHM was Rs. 82.27 crore
• Allocation for 06-07 is Rs. 407.9 crore, including :
RCH flexi fund
: Rs. 107.90 crore
NRHM flexi fund
: Rs. 99.84 crore
National Disease Control Programme : Rs. 29.56 crore
CSS
: Rs. 135.46 crore
• Ensuring payment to ASHA-Sahyogini
• Timely submission of SoE / UC to enable fund flow
• Observance of Financial propriety
KEY THEMES FOR NRHM
• Promotion of institutional deliveries through Janani
Surksha Yojana.
• Advocacy and action for legal age at marriage.
• Improved access to quality contraception services.
• Action against sex selection and female foeticide.