Information for redesign of airspace composition

Download Report

Transcript Information for redesign of airspace composition

Information for redesign
of airspace
composition
Yoshimichi HAMAHATA
ATC division, JCAB
THE EIGHTH MEETING OF THE INFORMAL EAST ASIA AIR TRAFFIC
MANAGEMENT COORDINATION GROUP (EATMCG/8)
(Hong Kong, 21-22 May 2015)
Ministry of Land, Infrastructure, Transport and Tourism
Current facility and shape of sectors
Sapporo ACC
6 sectors
S34
S04
●
S03
S31
S02
S01
T02
T01
T28
T27
Fukuoka ACC
11 sectors
T21
T22
F11
F01
F03
●
T23
F02
T26
T24
T03
T07
●
T12 T13
T09
T05
T04
T06
T14 T15
T10
F16
T17
F08
F05
F07
F06
T11
F17
F15
N01
●
N06
N02
Naha ACC
3 sectors
Tokyo ACC
22 sectors
Demand forecast of air traffic in Japan
 International flight and flying-over are increased. Domestic flight is dependent on the case of GDP.
 Even if GDP is estimated low, the number of aircrafts will exceed the limit of air traffic control capacity around 2025.
 The demand may go up rather than this forecast by further promotion of inbound tourism and the growth of LCC.
Traffic volume (thousand/ year )
2,200
Reference
Predicted
value
Actual
value
2,000
1,800
1,666
1,671
1,605
1,553
1,393
1,400
1,303
1,414
1,346
1,285
1,208
1,200
1,973
1,834
1,713
1,600
2,092
Actual
実績値
Flying- over
1,000
Upper case
上位ケース
Upper case
1,029
International
800
Middle
882
826
755
838
811
774
714
600
Medium
中位ケース
Lower
Lower
下位ケース
Domestic
400
200
0
1990
2000
2010
Actual
2020
2030
(FY)
2040
* Basic case of GDP is set up based on the economic growth rate which is a target of the Japanese future strategy.
(economic growth rate is set up to 1.7% from 2010 to 2017 and 2.0% from 2017 to 2032)
* In upper case, economic growth rate is set up 1% higher than basic case.
•In lower case, economic growth rate is set up 1% lower than basic case.
•The number of IFR flights is that to add military, non-scheduled and cargo flights to those above.
Expectation of Air Traffic Flow Control
In 2025, airspace capacity in the current airspace configuration becomes
the limit.
2012
2012
年の制御状況
Air Traffic Flow Control
Expectation of 2025
2025
Air年頃の制御想定
Traffic Flow Control
TOKYO
羽田空港
international Airport
・On the Ground due to flow control : 60 traffics
・Average of delay : 8 min
・On the Ground due to flow control : 270 traffics
・Average of delays : 25 min or over
⇒flight cancellation will occur
Improvement of ATC capacity (measures to expand )
Current airspace composition
and future airspace divided by altitude
(航空路空域)
✓Handling ability of Air Traffic Control was raised by reducing number of aircraft per 1 sector by
subdivision of a sector conventionally.
✓However, enforcement of subdivision beyond this will increase the time and effort of taking over
between sectors. Moreover, the airspace that detour for bad weather or turn order of an aircraft
becomes less insufficient, and throughput declines conversely.
We order to respond to an increase in the future traffic demand, conventional and different, to expand
the ATC capacity by the airspace divided by altitude.
・By difference of cruising, climbing, and descending, we raise the treatment capacity of aircraft.
・In the high altitude airspace of low workload, the handling number of aircraft makes to increase.
(航空路空域)
→「巡航」
「上昇降下」
(航空路空域)
(高高度空域)
→「巡航」
(低高度空域)
(低高度空域)
→「上昇降下」
【image of airspace divided by altitude】
Expand capacity and implementation stage
The introduction of New en-route
RADAR data processing system
2,000,000+α
★TOKYO OLYMPICS
Traffic volume 1,800,000 / year
1,900,000
FUKUOKA UAC
高高度
FUKUOKA UAC
西日本高高度
東日本低高度
西日本低高度TOKYO
東京管制部
TOKYO
福岡管制部
FUKUOKA
那覇管制部
ACC
NAHA
ACC
ACC
2015
KOBE ACC
札幌管制部
SAPPORO
ACC
東京管制部
TOKYO ACC
西日本低高度
SAPPORO
札幌管制部
ACC
KOBE ACC
【western JAPAN divided by altitude】
2018
2020
2022.Apr.
2020.Oct.(or Nov.)
ACC
【Restructure of en-route airspace
completed】
2025.Apr.
Change of Domestic Airspace and Facilities
○ Redesigning the current domestic airspace (En-route and ACA)
○ Decreasing ATC workload totally and improving ATC operational efficiency.
Redesign of Airspace
Restructure of Facilities
【Before redesign- En-route and ACA】
(En-route)
(En-route)
(En-route)
(En-route)
2024 - Sapporo ACC
↓
Consolidated Terminal
Radar Control
(Airport)
2018- Kobe ACC (New)
Western Lower En-route
(ACA)
【After redesign】
(En-route- Upper)
2024- Tokyo ACC
Eastern Lower En-route
(consolidated ACA)
(Airport)
(En-route-Lower)
2020 - Fukuoka UAC
Upper En-route
2018 - Naha ACC
↓
Consolidated
Terminal Radar
Control
6
Draft of airspace composition in 2025
1 FUKUOKA UAC (Upper Area Sector + Oceanic sector)
・EAST area・・・11 sectors (within 4 Oceanic sector)
・WEST area・・・11 sectors (within 1 Oceanic sector)
2 TOKYO ACC (EAST of JAPAN below FL335)
・North area・・・7 sectors
・East area・・・8 sectors
3 KOBE ACC (WEST of JAPAN below FL335)
・WEST area・・・8 sectors
・SOUTH area・・・3 sectors
n30
h01
n31
n33
w43
h07
Fukuoka UAC
w49
h09
h12
w52
n35
n36
w47
w51
h02
n34
w48
h08
w53
n32
h04
e38
h05
w44
e45
T25s
e46
s50
e41
h03
e39
e40
h06
e42
h10
h13
s54
h14
h15
h11
Tokyo ACC
Kobe ACC
h16
s55
~Number of sectors~
h17
current
SAPPORO
6
TOKYO
22
FUKUOKA
11
NAHA
3
ATMC(Oceanic)5
total 47
restructured
FUKUOKA
22
(within Oceanic 5)
TOKYO
15
KOBE
11
total 48
Draft of airspace composition in 2025
h01
【Shape of Upper Area sectors】
h04
h02
h07
h08
h12
h03
h05
h09
h06
h10
h13
h14
h11
n30
n31
h15
h16
n32
n33
w43
h17
n34
n35
n36
w48
w51
w53
w52
w47 w44
w49
s50
e38 e39
T25s e40
e45
e46
e41
e42
s54
【Shape of ACC sectors below FL335】
s55
2018
①Metropolitan airspace around TOKYO and NARITA international airport
will be change. (Preparation for the Tokyo Olympics)
②NAHA ACC will move to KOBE building
(KOBE aeronautical satellite center building)
2018~2019
Introduce new en-route RADAR data processing system to 4ACC.
2020 TOKYO Olympics & Paralympics
2020~2022
Redesign of western en-route airspace.
2023~2025
Redesign of eastern en-route airspace.
2025.April
Redesign of en-route airspace will be completed.