Field Problems with Instrument
Transformer Installations
ElectriCities of North Carolina
Advanced Meter School
James Whitaker
Greenville Utilities Commission
Mark Wells
Town of Tarboro
Current Transformers


Proportionally steps down
the current level in the
meter circuit
Isolates meter personnel
and metering equipment
from high current flow
FORM 9S WIRING DIAGRAM
USING ONLY CTS
SECONDARY METERING
3 PHASE 4 WIRE WYE

SOME UTILITIES MAY
USE ONLY CTS AND NO
VTS
A
B
C
K
Y
Z
FORM
8/9S
SOLID STATE
METER
VOLTAGE
120 / 208
N
WHITE
ORANGE

THIS IS BY
PREFERENCE OR
POLICY
RED / BLACK
BLUE
ORANGE / BLACK
RED
BLUE / BLACK
BLACK
P P P N R
R
R
P
RED / BLACK
ORANGE
BLUE / BLACK
BLACK
ORANGE / BLACK
BLUE
/ BLACK
WHITE
RED

THE BILLING
MULTIPLIER WILL BE
DETERMINED BY THE
CT RATIO
A
+
B
+
C
+
120V
CT
120V
LINE
N
BLACK
CT
CT
120V
WIRING DIAGRAM
TRANSFORMER-RATED SOCKET TYPE
THREE PHASE, 4 WIRE WYE CT SERVICE
120-208 VOLT FM 8/9 S THREE ELEMENT SOLID STATE METER
FORM
NUMBER
S-8/9 S
Voltage Transformers
A voltage transformer
or VT steps down
higher voltage by
some ratio to a level
that is safer and
more practical to
meter.
FORM 9S WIRING DIAGRAM
USING VTS & CTS
SECONDARY METERING
3 PHASE 4 WIRE WYE USING SECONDARY VTS & CTS

THIS DIAGRAM USES
SECONDARY VTs TO
STEP DOWN THE
VOLTAGE TO 120V
FORM
8/9S
SOLID STATE
METER
VOLTAGE
277 / 480
A
B
C
K
Y
Z
N
MULTIPLIER =
CT x VT RATIO
WHITE
ORANGE
RED / BLACK
BLUE
ORANGE / BLACK
RED
BLUE / BLACK
BLACK
P P P N R


CTs ARE ALSO USED
THE BILLING
MULTIPLIER WILL BE A
COMBINATION OF VT
AND CT RATIO
R
R
P
RED / BLACK
VT
2.4 : 1
ORANGE
VT
2.4 : 1
BLUE
VT
BLUE / BLACK
BLACK
ORANGE / BLACK
VT
2.4 : 1
/ BLACK
WHITE
RED
A
+
B
+
C
+
CT
277V
CT
277V
LINE
N
GROUND
BLACK
CT
277V
WIRING DIAGRAM
TRANSFORMER-RATED SOCKET TYPE
THREE PHASE, 4 WIRE WYE SERVICE WITH VTS & CTS
277- 480 VOLT FM 8/9 S THREE ELEMENT SOLID STATE
METER
FORM
NUMBER
S-8/9 S
CT PROBLEMS


CT POSITIONED
BACKWARDS ON
PRIMARY
CONDUCTOR
THE METER WILL
RUN BACKWARDS
ON THIS PHASE
ANOTHER CT PROBLEM


WIRING REVERSED
AT SECONDARY
SIDE OF CT
SAME EFFECT AS
THE PREVIOUS
SLIDE, REVERSE
ROTATION ON THIS
PHASE
CT IMPROPER WIRING
POLARITY REVERSED


TEST SWITCH
CONNECTIONS
SAME THING,
REVERSE
ROTATION ON THIS
PHASE
CT INSTALLATION ISSUES


CT SHORTING BAR
LEFT IN THE
CLOSED POSITION
NO MEASURERMENT
OF CURRENT ON
THIS PHASE
LOOSE SCREW ?


CT CIRCUIT
SHORTED
NO OR LOW USAGE
ON THIS PHASE
OPEN CT CIRCUIT




BROKEN OR BURNED CT WIRING
BROKEN NEUTRAL CAN RESULT IN NO
REGISTRATION AT ALL
AGAIN, NO MEASUREMENT ON THAT
PARTICULIAR PHASE
POSSIBLE DAMAGE TO CT
OPEN VOLTAGE CIRCUIT



BROKEN VOLTAGE
WIRING
BAD VT = NO
VOLTAGE
NO MEASUREMENT
ON THIS PHASE
POSSIBLE TAMPERING


OPEN TEST
SWITCHES ON
CURRENT OR
VOLTAGE SIDE
NO MEASUREMENT
OF CURRENT ON
THESE TWO
PHASES
LOCKS HELP

USE SOME TYPE OF
METER BASE
LOCKING DEVICES
BILLING PROBLEMS

BILLING MULTIPLIER

CT RATIO 200:5=40

VT RATIO 288:120=2.4

40 X 2.4 = 96
WHAT IF ?



INSTALLATION CREW GIVES INCORRECT
INFORMATION TO THE BILLING
DEPARTMENT
SERVICE UPGRADE, CTS ARE CHANGED TO A
HIGHER RATIO AND THE CHANGE NEVER
GETS TO THE BILLING DEPARTMENT
BILLING MULTIPLIER IS WRONG!! LOSS OF
REVENUE
NEW MULTIPLIER





SERVICE AND CT UPGRADE
PREVIOUS BILLING MULTIPLIER WAS
96 (40X2.4=96)
NEW CTS 600:5 USING THE SAME VTS
WHAT IS THE NEW MULTIPLIER?
600:5=120 X 288:120=2.4 (120 X
2.4=288)
NEW BILLING MULTIPLIER IS 288
LOSS OF REVENUE


ALL OF THESE EXAMPLES AND MANY
OTHER PROBLEMS CAUSE A
TREMENDOUS AMOUNT IN REVENUE
LOSS EACH YEAR
WHAT CAN YOU DO TO CORRECT THIS
PROBLEM?
CT TEST PROGRAM


CHECK NEW INSTALLATIONS AS WELL AS
ANY UPGRADES AS THEY ARE DONE. THIS IS
WHEN A LOT OF ERRORS OCCUR AND THEY
ARE HARD TO CATCH BECAUSE THERE IS NO
BILLING HISTORY
HAVE A TEST SCHEDULE TO RECHECK CT
INSTALLATIONS PERIODICALLY
SAMPLE FIELD TEST




WIRE VERIFICATION
CT RATIO AND
ACCURACY
METER ACCURACY
TOTAL SYSTEM
ACCURACY
QUESTIONS ?