Przykłady projektów
Andrzej Siemaszko
Bełchatów, 5 listopada 2001
Udział wybranych firm europejskich
w projektach 5. PR
60 54
51
50
Złożone
Finansowane
43
40
30
22
17
20
17
16
9
10
Electrabel
Iberdrola
Siemens
EdF
5
ENEL
0
11 11
Vattenfall
30
Proposal No NNE5-1999-00173
Demonstration of a MWe Class Power Systems Using High Temperature Fuel
Cells (SOFC) Combined With Micro-Turbine Generators
Acronim: 1MWSOFC
Partners (6)
•
•
•
•
Abstract
(CO) ENERGIE BADEN WÜRTTEMBERG
Germany
ELECTRICITE DE FRANCE
France
TIROLER WASSERKRAFT
AKTIESELLSCHAFT
Austria
SIEMENS AKTIEGESELLSCHAFT
Germany
•
•
GAZ DE FRANCE
France
SIEMENS WASTINGHOUSE POWER
CORPORATION
US
Type of Action: DM
Duration: 48 M
Możliwość dołączenia!
Because of the steady increase of energy consumption ,
and the cost of energy production , and the related
pollution , the conversion efficiency from fossil fuels
to electricity has to be as high possible . The high
temperature Solid Oxide Fuell Cell (sofc) in
combination with a gas turbine is an excellent
method to overcome these problems. Such a hybrid
system can reach an electrical net-efficiency up to 60
% with minimal Nox, even in a power range between
O.5 and 10 MW, which fits very well into the
strategy for a decentralized energy market.
Combined with adapted Microturbine Generators
(MTG) two 1 MW SOFC power systems will be
designed, manufactured and tested using the tubular
SOFC technology of SWPC. With these
demonstrations the feasibility of such a high
efficiency hybrid power system will be shown and
the European industry will become familiar with this
new technology.
Proposal No NNE5-1999-00283
Fireside Corrosion In Coal-Fired Utility Boilers
Acronim: CORROSION
Partners (7)
•
•
•
•
•
•
•
•
(CO) MITSUI BABCOCK ENERGY LIMITED
United Kingdom
ENEL - SOCIETA PAR AZIONI
Italy
ANSALDO ENERGIA S.p.A
Italy
VATTENFALL AB
Sweden
UNIVERSITAET STUTTGART
Germany
ALGECO
France
CINAR Ltd
United Kingdom
KEMA NEDERLAND B.V.
Netherlands
Type of Action: RS
Duration: 36 M
Możliwość dołączenia!
Abstract
. The proposed project is concerned with a programme of
experimental modelling and engineering work aimed
at providing an improved understanding of, and
reducing the risks of, the accelerated wastage rates of
coal-fired boiler components associated with
operation at advanced steam condition, and with the
aggressive gas-side conditions which may result from
advanced primary nox control technologies and the
co-firing of biomass and waste materials. The
testwork will be performed at laboratory and
industrial scale, and will involve the development of
advanced online diagnostic techniques for boiler tube
corrosion and the development and demonstration of
a range of remedial measures. The results of this
work will be employed in the development of a
predictive corrosion model and in the preparation of
a suite of guidelines for boiler designers and
operators to allow minimisation of the risks of
accelarated corrosion.
Proposal No NNE5-1999-00294
Slagging And Fouling Prediction by Dynamic Boiler Modelling
Acronim: SLAGMOD
Partners (6)
•
•
•
•
•
•
(CO) UNIVERSITAET STUTTGART
Germany
TECHNISCHE UNIVERSITEIT DELFT
Netherlands
ABO AKADEMI UNIVERSITY Finland
NATIONAL TECHNICAL UNIVERSITY OF
ATHENS
Greece
VATTENFALL AB
Sweden
INSTITUTO SUPERIOR TECNICO Portugal
Type of Action: RS
Duration: 36 M
Możliwość dołączenia!
Abstract
. In order to promote a widespread utilisation of
decentralised biomass combustion operational
problems like slagging, fouling and corrosion have to
be solved or reduced. Based on existing and
measured steam data, an on-line dynamic model of
the <water/steam cycle wil be developed and tested
for different boilers in large scale. The model
provides operators a tool to recognise and to reduce
the slagging and fouling during operation by
countermeasures in order to increas'e the economy,
efficiency and also emiisions of the plant. The model
will be applied for a pf, fb and agrate boler and
validate both by available operational measurement
data and by additional on-line and off-line
measurement. The verification of the model for
different boilers should result in guidelines for a safe
and economic plant operation
Proposal No NNE5-1999-00309
Development And Demonstration Of A Burner For Low Volatile Coal
Combustion
Acronim: LVCB
Partners (6)
•
•
•
•
•
•
(CO) MITSUI BABCOCK ENERGY LIMITED
United Kingdom
THE IMPERIAL COLLEGE OF SCIENCE
TECHNOLOGY AND MEDICINE
United Kingdom
UNIVERSITAET STUTTGART
Germany
INSTITUTO SUPERIOR TECNICO Portugal
ENEL - SOCITA PER AZIONI
Italy
ELECTRICITE DE FRANCE
France
Type of Action: CM
Duration: 36 M
Możliwość dołączenia!
Abstract
Experience of low volatile coal combustion in wall-fired
plant is poor due to problems associated with high
carbon-in-ash and flame stability. There is, however,
economic benefits in utilising low volatile coals in
wall-fired plant. For new plant, improvements in
combustion performance and overall cycle efficiency
should provide considerable economic benefits and a
significant reduction (25%) in CO2 emissions
compared to current boiler technology. This project
aims to develop and demonstrate a full-scale burner
for firing low volatile coals in a large-scale burner
test facility (Phase1). Phase 1 will be supported by
coal characterisation, advanced modelling techniques
and pilot scale testing activities. A full-scale
demonstration of a developed burner for low volatile
coals in a power station furnace (Phase 2) will be the
subject of a future proposal.
Proposal No NNE5-1999-00345
Pre-Engineering Of An IGCC Demonstration Plant In China
Acronim: CHINAIGCC
Partners (3)
•
•
•
(CO) SIEMENS AKTIENGESELLSCHAFT
Germany
MITSUI BABCOCK ENERGY LIMITED
United Kingdom
FOSTER WHEELER CONTINENTAL
EUROPE SrL
Italy
Type of Action: DM
Duration: 36 M
Możliwość dołączenia!
Abstract
Coal will play a leading role in electricity generation,
therefore coal must be able to meet the increasingly
stringent requirements in terms of economics and
environmental protection. There is a rising demand
for power plant technology with increased thermal
efficiency, Low environmental impact and
competitive economics also in other coal countries
like in China. Due to the outstanding technical
features of the IGCC technology, the erection of a
demostration plant appears an interesting option for
the Chinese institutions. Therefore it is intended by a
group of European companies to carry out a preengineering study for the erection of an IGCC
demonstration power plant in China. The main goals
of this engineering effort are to define the general
and site-specific planning fundamentals and to
prepare a pre-engineering documentation of the
overall plant in a scope, that the detailed engineering
and erection of the plant can directly be based on that
work.
Proposal No NNE5-1999-00396
Large-Scale Renewable Energy Grid Integration With Redox Energy Storage
Acronim: REI-STORE
Partners (8)
•
•
•
•
•
•
•
•
Abstract
(CO) ELTRA
Danmark
NATIONAL POWER PLC
United Kingdom
UNIVERSITY COLLEGE CORK,
Ireland
BRUNEL UNIVERSITY
United Kingdom
LOUGHBOROUGH UNIVERSITY
United Kingdom
ELECTRICITE DE FRANCE
France
UNIVERSITY OF MANCHESTER
United Kingdom
ELSAM
Denmark
Type of Action: CM
Duration: 60 M
This combined RTD and Demonstration projec will
aid the integration of a 140 MW offshore wind
farm through the provision of regulating power.
The project provides a technology soluation to
the barriers limiting the value and future
prospects of variable renewable generation. An
innovative electromechanical energy storage
technology, with a performance and cost
structure better thant that of pumped hydro, will
be developed.Research will lead to a variety of
innovations that will allow a 200MWh plant to
be built for 90 EURO/kWh with a substantially
improved efficiency and footprint compared to
the pilot plant. The commercial and technical
drivers for energy storage, as well as the
expected dynamic performance, will be fully
examined to determine the optimum
configuration.
Proposal No NNE5-1999-00403
Quality Of Secondary Fuel for pulverised fuel co-combustion
Acronim: SEFCO
Partners (4)
Abstract
•
(CO) UNIVERSITAET STUTTGART
Germany
•
ENEL - Societa per Azioni
•
•
RWE Energie AG
Germany
TECHNISCHE UNIVERSITEIT DELFT
Netherlands
Type of Action: CM
Italy
Duration: 36 M
Możliwość dołączenia!
Co-combustion of waste material is a possibility of waste
utilisation, as long as there are no negative effects on
operation, emissions and utilisation of by-products.
The suitability of different biomass and waste
materials has been tested for a long time and testing
will continue in the future. The basic idea of the
project is that waste materials are composed of a few
major components (e.g.: paper, plastic, inert material,
biomass). If the composition of the waste is
available, and the impact of the pure waste is known,
it will be possible to predict the behaviour of the
waste fuel mix. The main objective is to provide
knowledge for operator, manufacturer and
authorities, when considering a new secondary fuel.
In order to establish a data base of the impact of
different wastes of combustion, emission and
operation, tests of pure wastes will be done from lab
to large scale.
Proposal No NNE5-1999-00553
Housing For Families On Low Incomes
Acronim: DEMULOG
Partners (8)
Abstract
(CO) ELECTRICITE DE FRANCE France
FUNDATIO INSTITUT DE TECNOLOGIA DE
LA CONSTRUCCIO DE CATALUNYA
Spain
•
CAR LTD
United Kingdom
•
TECHNICAL RESEARCH CENTRE OF
FINLAND
Finland
•
ALGECO
France
•
OPAC
France
•
POPULATION AND SOCIAL POLICY
CONSULTANTS
Belgium
•
NENE HOUSING SOCIETY LTD
United Kingdom
Type of Action: DM
Duration: 48 M
Możliwość dołączenia!
. The aim of the project is to propose long-term solutions
which will allow low income people to have access
to adequate housing, at an acceptable investment cost
(for the community) and running cost (for the
inhabitant). This housing should meet the needs of
the poulations concerned, and help their social
integration. The work will consist on the
construction of demonstration houses, which will be
inhabited by very low income households. In order
to resolve the problem posed by the climatic,
environmental and socio-economical differences
within the European Community, 8 dwellings will be
built in 4 fifferent countries: 2 inFrance, 2 in Spain,
2 in Finland and 2 in England. The basic concept is a
house using modular construction techniques with a
few preliminary equipments inside, a single source of
energy in order to limit total subscription charges.
Building these houses will require techniques that
already exist but are not yet used together.
•
•
Proposal No NNE5-1999-20104
Investigation Of European Specification For Medium Voltage Power Cable
Acronim: EuroMVCable
Partners (8)
•
•
•
•
•
•
•
•
(CO) ELECTRICITE DE FRANCE France
THE ELECTRICITY ASSOCIATION SERVICE
LTD.
United Kingdom
ENEL - SOCIETA PAR AZIONI
Italy
IBERDROLA
Spain
ALCATELL
Italy
BICCGENERAL UK CABLES Ltd.
United Kingdom
CABLES PIRELLI S.A.
France
VEW EUROTEST
Germany
Type of Action: RS
Duration: 36 M
Możliwość dołączenia!
Abstract
. In electrical power Supply, the medium voltage
underground cables are representing a significant
part of power distribution system. Various studies are
carried out by utilities to improve the costeffectiveness of the cable design. However, there is
still a lot to do in the field of harmonisation in
Europe to rationalise the cable design. As a result, a
large variety of medium voltage extruded insulation
cables are in use in Europe, with designs depending
on the operating environments and experiences of
each utility, and some standards that have not
changed over the past decades. In addition to the
cost-reduction challenge inherent to the cable design
specifications, the other main challenge taken up by
the partner is to rationalise the options for cable
design by drawing up common specifications.
Proposal No NNE5-1999-20185
Prediction And Control Of Combustion Instabilities For Industrial Gas
Turbines
Acronim: PRECCINSTA
Partners (15)
Abstract
•
(CO) ABB STAL
•
ABB ALSTOM POWER UK LTD
United Kingdom
ROLLS-ROYCE POWER ENGINEERING PLC
United Kingdom
POWERGEN UK PLC
United Kingdom
ENEL - SOCIETA PAR AZIONI
Italy
ELECTRICITE DE FRANCE
France
and others
•
•
•
•
•
Type of Action: RS
Sweden
Duration: 42 M
Możliwość dołączenia!
. In the pace of increasing efficiency with at the same time
reduced emissions lean premixed combustion was
introduced for industrial gas turbines. This sacrificed
the stability of the combustion process to a certain
extend which resulted in operating restrictions,
possible damage by pressure pulsations and higher
emission levels than anticipated. PRECCINST aims
at improvment and development of tools, methods
and criteria for predicting and controling the
combustion process in a way which ensures stable
operation at low emissions for all load conditions and
applications and increases the reliability and
availability of the gas turbine. Thsi is important to be
able to further increase efficiency and extend fuel
flexibility of the gas turbine in the future.
Proposal No NNE5-2001-00050
Phase 2. Advanced 700° C Pf Power Plant
Acronim: AD700-2
Partners (39)
•
•
•
(CO) TECH-WISE A/S
Denmark
ALSTOM POWER (UK) LTD United Kingdom
ALSTOM POWER (SWITZERLAND) LTD
Switzerland
•
ALSTOM POWER - STEAM POWER PLANT
SEGMENT
France
•
ALSTOM POWER BOILER GMBH Germany
•
EDF/DIS/CNET
France
•
EDF/R&D/EP/SPE
France
•
EDF/R&D/RNE/EMA
France
•
ENEL - PRODUZIONE S.P.A.
Italy
•
RWE POWER
Germany
•
VATTENFALL AB
Sweden
•
SIEMENS AKTIENGESELLSCHAFT
Germany
and others
Type of Action: RS
Duration: 72 M
Abstract
This proposal covers phase 2 of the "Advanced 700°C PF
Power Plant" (AD700) project. Overall goal is to
enhance European security of energy supply by
ensuring a role for coal in the future fuel-mix. This
effort is based on a phased development of the
AD700 technology to improve the economic and
environmental competitiveness of coal-fired power.
Feasibility studies were covered in phase 1 and
demonstrated sound economy of advanced concepts.
Also a materials development and testing progr. has
started and shows no sign of not reaching the targets.
Phase 2 targets fabricability and welding of advanced
materials, matr. testing in an operating boiler and
investigations on co-firing with biomass at ~700°C
steam temp. Other phase 2 activities target
component design, dissemination of results, planning
activities for phase 3 with component demonstration
and finally business plans for a full-scale demo-plant
to be built in phase 4.
Proposal No NNE5-2001-00104
Mitigation Of Formation Of Chlorine Rich Deposits Affecting On
Superheater Corrosion Under Co-combustion Conditions
Acronim: CORBI
Partners (5)
Abstract
•
(CO) TECHNICAL RESEARCH CENTRE
Finland
•
•
MAX-PLANCK- INSTITUTE
VATTENFALL AB
•
ENEL - PRODUZIONE S.P.A
•
EUROPEAN COMMISSION - DIRECTORATE
GENERAL JOINT RESEARCH CENTRE
Netherlands
Type of Action: RS
Germany
Sweden
.
Italy
Duration: 36 M
. Corrosion and deposition mechanisms in waste and
especially in biomass combustion are not well
understood. Proposedwork is achieving to improve
the understanding of these mechanisms. The main
focus of the work is on power plant and laboratory
tests to characterise fuel and ash behaviour, deposit
formation and corrosion mechanisms using different
heat exchanger materials under controlled
combustion conditions. Results could be used for
achieving higher operational reliability, cost savings,
less shut-downs, higher boiler steam properties and
efficiency of the power plants. In addition, results
will be validated by plant trials and therefore
utilized in practice for power plant operation,
defining limits for fuel mixture ratios, for boiler
design and for heat exchanger material selection.
Dodatkowe konkursy dla krajów kandydujących
Energie NAS
Konkurs na dołączanie do realizowanych projektów
Data ogłoszenia: 28.08.2001
Data zamknięcia: 14.12.2001
Lista projektów: http://www.cordis.lu/eesd/src/proj_eng.htm
QoL/Growth/EESD-2001-INTEGR
Konkurs na Centra Doskonałości
Data ogłoszenia: 18.09.2001
Data zamknięcia: 31.01.2002