392 - Y- ADAGIO

Download Report

Transcript 392 - Y- ADAGIO

Proposal of Strategic Task Force
- Making requirements to Smart Grid and LVDC -
2010-5-18
Norimasa Minami
Assistant secretary and TA9 Technical secretary
Contents
1, Current activities in IEC high level committees
1) SMB/SG1 (Electrical Energy Efficiency)
2) SMB/SG2 (Ultra High Voltage)
3) SMB/SG3 (Smart Grid)
4) SMB/SG4 (Low Voltage Direct Current)
5) MSB/SWG
2, Scope in IEC
3, Impacts to TC100
1) Smart Grid
2) LVDC
3, About ad-hoc group
1) Objectives
2) Goal
3) Timeline
4) Members
1, Current activities in IEC high level committees
1) SMB/SG1 (Electrical Energy Efficiency)
Created the below SGs
2) SMB/SG2 (UHV)
Ultra high voltage transmission among the grids
No impact to TC100
3) SMB/SG3 (Smart Grid)
TC100 products are using electricity
Impact to TC100 about from/to in-home, such as HEMS
4) SMB/SG4 (LVDC)
TC100 products are driven by DC in its hardware
Direct current inside home, not transmission outside
5) MSB/SWG
EEE report mentioned new energy technologies
In the future may be discussed
2, Scope in IEC
Should be discussed on a sectoral basis
PV
network
HVAC
Data Centre
Distribution Panel
系統
創
network
Generator
制御
蓄
FULL
家電
AUTO
Energy Management
LVDC
A/V equipment
ECO
Substation
Residential
Battery
Heat Pump
FC
Fridge
EV
Generation
Transmission
Distribution
In-home
3, Impacts to TC100
1) Smart Grid (SG3)
Electrical using equipments, HEMS, Smart meter, etc
Air-conditioner
Transformer
Refrigerator
Washing Machine
heat pump
Power Station
AC 100-200V
Microwave Oven
AC 50/60Hz
Induction Heater
Storage
Cell
TV
LVDC
24~48V
Photovoltaic
DVD/BD
PC
Printer
Audio Set
GameMachinei
Phone/Fax
Hybrid
Control
DC PLC
LED Lighting
Sensor
ー
Wireless Charger
Heat pump
FC
Hydrogen
Bath
Kitchen
Waste heated water
Wash-basin
Energy Architecture in home (MSB-SWG report)
Ventilation
Electric Toothbrush
Electric Shaver
2) LVDC (SG4)
All most of TC100 products are using DC
Unification of voltage, plug, wall socket, wiring, accessories, etc
4, About a proposed task force(s)
1) Objectives
Survey and discussions of requirements to Smart Grid, LVDC
ex. Interfaces, Protocol, Voltage, and Safety issues
2) Goal
Establishment of projects to make a standard related TC100
3) Timeline
1st step : - December, 2010
Survey the impact to TC100 by Smart Grid
2nd step : 2011- depend on the SMB decisions in October
Discussions and making requirements to related TCs
Making standards related TC100
4) Members
Request to resister experts