Contingency Plan for NR Gandhi

Download Report

Transcript Contingency Plan for NR Gandhi

Salient Features
Northern Regional Power System
CONTINGENCIES
Welcome
IN
GRID OPERATION

Largest sized hydro unit (180 MW at Chamera) in the
country
MONITORING HEALTH OF THE GRID

GRID DEFINITION

PERFORMANCE INDICES

FREQUENCY VARIATION
 VOLTAGE VARIATION
PROBABLE REASONS FOR GRID CONTINGENCIES

EQUIPMENT FAILURE
 WEAK TRANSMISSION SYSTEM

OPERATIONAL ERROR

LOW FREQUENCY/ VOLTAGE

HIGH FREQUENCY/ VOLTAGE

GRID INDISCIPLINE
NR GRID : BRIEF INTRODUCTION
• Wide spread transmission network
• Large Installed capacity ~ 28243 MW
-with thermal hydro mix ~ 69:31
• Wide variation in peak-off peak demand
TYPICAL FEATURES OF
NORTHERN REGIONAL GRID

Large number of constituents

Wide variation in demand

Multiplicity of generating sources

Critically loaded transmission network

Important and crucial Loads
CONTINGENCIES SPECIFIC TO NR GRID and
ACTION PLAN TO MEET THESE

Outage of Rihand – Dadri HVDC Pole (s)

Outage of 400 kV circuit (s) in parallel
AC network through UP

Outage of Trunk Lines between UP and
BBMB systems ….

Critically Low System Frequ. Conditions …
PROBABLE CONTINGENCIES
IN NORTHERN GRID

Critically Low Voltage Conditions ….

Critically High System Frequency
Conditions ….

Critically High Voltage Conditions ….

Outage of 400 kV Dadri – Mandola Circuit (s)

Disturbance / Trippings in J&K System ...