Anil Thomas
Asst. Executive. Engineer
Southern Regional Power Committee
Central Electricity Authority











Plant Availability Factor of ISGS.
Percentage of Allocated Capacity Share.
Share of Beneficiaries in ISGS.
Misdeclaration of Declared Capacity.
Ratio of Fees of SRLDC to be Shared.
Ratio in which Transmission Charges to be Shared.
Energy Scheduled to the Beneficiaries from ISGS.
Details of Scheduled Energy Wheeled to Other Region.
Details of Short Term Open Access.
Details of Short Term Open Access Through Power
Exchange.
Details of Wheeling Charges.


PAF-: The Average of the Daily Declared Capacities
for all the Days during that period expressed as a
percentage of the Installed Capacity in MW
reduced by the Normative Auxiliary Consumption.
PAFM/PAFY=10000*
DC/(N*IC*(100-AUX) )%
TARIFF
Fixed Cost
Return on
Equity + O&M
+ Sec Fuel Cost
Interest +
Depreciation
Running Cost
Primary Fuel +
O&M


Allocated Capacity Share – Gadgill Formula.
Un Allocated Share (15%)

Weighted Average of Percentage Allocation Capacity
Decides the Ratio in Which Fixed Capacity Charges
is to be share by Beneficiaries.

Ratio in Which SRLDC fees are shared is based on
Weighted Average of Total Entitlement of a
Beneficiaries with Different ISGS and LTOA


Postage Stamp Method- Based on Entitlement.
Point of Connection Method- Based on Hybrid
Method ( from 1.7.2011)



Running Charges of a Station Recovered through
Scheduled Energy.
Concept of Un-Requisition Energy (URS Power).
Concept of Unscheduled Interchange.




From Goa SR-Goa WR
From ER-WR Via SR.
Jeypore - Gajuwaka (ER)
Bhadravati - Chandrapur (WR)



Short Term Open Access.
Short Term Open Access through Power Exchange
PXI & IEX.


ISGS Embedded in State Transmission network
KAPS & MAPS.
State Transmission network Connecting Different
States.












Declared Capacity
Requisition
Schedule
Drawl
Losses
Frequency
Least count of 0.02 Hz Freq= 49+Code/50
UI
De incentive UI
Capped UI (4.08 ps/kwh)
Capping Under APM (4.08 ps/kwh)
Additional UI (49.5-49.2)(49.2-49)





No Generators Involved.
Penalty for injecting Reactive Energy at 103% of
Voltage Level and Incentive for Drawing .
Penalty for drawing Reactive Energy at 97% of
Voltage level and Incentive for Injecting
Reactive charges Rs 10/MVARH .
Payment for Interstate Lines.