EMS Applications
Download
Report
Transcript EMS Applications
© 2003 ABB Power Technologies
1 - Network Management
Network Manager
Energy Management
Power System Control Objectives
Limits and constraints
Avoid disturbances
Fast detection
Rapid restoration
Q = V and f
Continuity of supply
Customer service
Security
Quality
Safety
© ABB Power Technologies - 2
Employee
Public
Environmental impact
Economy
Optimal Dispatching
Energy exchange-trading
Planning
Maintenance
Deferred investments
Basic EMS Grouping
© ABB Power Technologies - 3
Transmission
Production
Training
Overview of Power Application Functions
Training Simulator
Study Database
Power
Import/Export
Load
Forecast
Weather
Forecast
Network state
and
power flow
Production Planning
Functions
Warning and Alarm
Messages
Penalty Factors
© ABB Power Technologies - 4
Production Plan
Network Analysis
Functions
Production Control
Functions
Setpoint
Controls
Measurements
and
Indications
POWER SYSTEM
Network Manager - Network Applications
Monitoring
Status & Analog Retrieval(SAR) Bad Topology Detection (BTD)
Network Model Builder (NMB) Network Parameter Update (NPU)
Scheduler Function (SF)
Network Modeling Assistant (NMA)
State Estimation (SE)
Network Sensitivity (NS)
Decision Support
Interlocking with LF & SA
Analysis
Study Data Base
Dispatcher Power Flow (DPF) Network Save Cases
Security Analysis (SA)
Short Circuit Analysis (SCA)
© ABB Power Technologies - 5
Operations Enhancement
Optimal Power Flow (OPF)
Security Constrained Dispatch (SCD)
Voltage Stability Analysis (VSA)
Thermal Security Analysis (TSA)
Available Transmission Capacity (ATC=VSA+TSA)
Equipment Outage Scheduler (EOS)
EMS - Network Functions
SNP - Telemetry SNaPshot
Takes an instant copy of the actual power system telemetered
state i.e. breaker states and measured values.
SAR - Status and Analog Retrieval
Combines the telemetry snapshot data with retrieved from the schedules,
to obtain a consistent network state.
© ABB Power Technologies - 6
BTD - Bad Topology Detection
Checks switch position indications vs. measurements
in order to detect erroneous switch positions and checks
quality of measurement by power balance test.
NMB - Network Model Builder
Builds the bus/branch network model based on the actual retrieved network state.
EMS - Network Functions
BSK - Bus Scheduler
Calculates individual loads, dispatches generating units economically and
determines regulation constraints.
SE - State Estimator
Calculates the most probable state of the network.
© ABB Power Technologies - 7
NPU - Network Parameter Update
Updates the time-dependent adaptive scheduling parameters.
EMS - Network Functions
SCA - Short Circuit Analysis
Evaluates the effects of different types of short circuit faults at different
locations of the system.
© ABB Power Technologies - 8
DPF - Dispatcher Power Flow
Executes the power flow studies for analyzing the results
and provides a base case solution for other applications.
OPF - Optimal Power Flow
Solves power flow problems and schedules power system controls
to optimize some objective while ensuring that the system operating
constraints are not violated.
EMS - Network Functions
ISR - Interlock Status and Analog Retrieval
Merges the proposed action into a fresh copy of the current network solution
to obtain the resulting network configuration.
INMB - Interlock Network Model Builder
Evaluates the resulting network bus model according to switching actions
proposed and determines changes in the network and the equipment availability.
IDPF - Interlock Dispatcher Power Flow
Computes a power flow solution to obtain the simulated base case
while determining possible overloads and voltage violations.
© ABB Power Technologies - 9
ISA - Interlock Security Analysis
Evaluates the effects of outages in the simulated case and determines
which ones will become harmful.
ISCA - Interlock Short Circuit Analysis
Evaluates the magnitude of short circuit current in the simulated case and
determines if the switch-gear capacity is adequate to interrupt them.
EMS - Network Functions
NS
SNP
SCD
SE
SAR
SA
NMB
BSK
NPU
OPF
© ABB Power Technologies - 10
SCA
Interlock
Top seven EMS applications year end 2003
© ABB Power Technologies - 11
Top favourites in order of priority:
Operator’s load flow
State estimation
Network topology
Short circuit analysis
Contingency analysis
Load forecasting
Automatic generation control
(source Newton-Evans 2001-3)
© ABB Power Technologies - 12
Real Time Power Flow
© ABB Power Technologies - 13
STPF
Network Manager - EMS Value Presentation
Value select
Tabular displays
Status lists
Result summaries
© ABB Power Technologies - 14
Event & alarm lists
State Estimator - Overview
Measure
-ments
U=R*I
.
.
.
.
.
.
Solution
Error
Bus/branc
h model
Physical laws
•
•
X
Voltages
& angles
V1,1,V2,2...Unn)
Input:
( )
30
50
( )
27.
126 kV
5
© ABB Power Technologies - 15
33.2
-
( )
30
50
48
( )
( )
61.6
19.4
( )
29.5
50
126 kV
0
2
8
.
6
( )
( )
29.5
50
28.4
48
SCADA measurements
( )
60
15
( )
60
15
( )
60
15
137 kV
-1.43
119 kV
-5.44
Output:
Complete &
consistent network
representation
State and flow variables
Security Analysis - Solution & Benefits
Case 1
G
L
L
P > Limit
V > Limit
© ABB Power Technologies - 16
Identifying bottle-necks
Adds confidence to the
operator
Improved reliability
Aid in maintenance
planning
Real time evaluatjion of
security
G
L
!
Benefits:
Overload
Voltage violation
Cascading
Short Circuit Analysis - Solution & Features
Unbalanced faults (single-phase to ground, doublephase to ground, phase-to-phase)
Balanced three-phase faults
G
L
L
L
G
Three fault classes:
© ABB Power Technologies - 17
–
Bus short-circuit violations
& voltages in one-line diagrams
–
Sub transient currents
–
standard faults - bus faults
intermediate faults - along
lines
phase-open faults
Dispatcher Power Flow
P+jQ = ?
P+jQ = ?
G
G
Line 1
L
L
V
L
L
L
What if line 1 is
disconnected?
Consequences if a load is
increased?
P+jQ = ?
P+jQ = ?
© ABB Power Technologies - 18
Benefits:
Evaluation of operational situations
Identifying bottlenecks
Evaluation of security constraints
Operational and emergency training
Calculation of losses
Network Modeling Assistant - verification tests
Parameter test
© ABB Power Technologies - 19
Warning: SERIES_REACT in line
TROY400BLOD TIE has a value
that is out of range, it is 35.689999 and
it should be between 0.05 and 30.0
Complete model test
Topology test
Term test
Loose end test
Island test
Optimal Power Flow & SCD - Objectives & Benefits
Objectives:
Cost minimization
Loss minimization
Security improvement
Corrective rescheduling
Control efficiency
Benefits:
P = 100 MW
V
P12 - P21 = 0.2 L
G
© ABB Power Technologies - 20
L
G
L
P12
P = 50 MW
Evaluate power system
performance
Reduce production costs
Security constrained EDC
Reduce transmission losses
Operation closer to network
limits
Improve security
Field proven
!
© ABB Power Technologies - 21
Equipment Outage Scheduler
Savings
Security Analysis:
Identify System Bottlenecks in Real-Time
- Indirect avoid 3-5 overload situations per year
State Estimator:
Reduced Field Maintenance or Telemetry
0,5 person year of maintenance cost
- More Accurate Penalty Factors
- 0,2% - 0,5 % of losses
© ABB Power Technologies - 22
Optimal Power Flow:
Loss Optimization / VAR Scheduling
3% - 5% of losses
Economical Justification - an example
Svenska Kraftnät (Sweden):
Grid Owner
Used functionality:
Optimal Power Flow
Transmission:
18 000 MW
Transmission Losses:
350 MW
© ABB Power Technologies - 23
Loss reduction:
5% --> 17,5 MW
Yearly savings:
$20 / Mwh
B8
125 456 678 345 567 678
B9
Station
A
C1
T1
C2
T2
B1
B2
B7
B3
B4
B5
B6
C7
--> ~3 MUSD
Economical Justification - an example
Cammesa (Argentina)
© ABB Power Technologies - 24
Transmission losses 3%
200 MW
Reduction of losses with 0.5%
35 MW
Yearly savings ( 0.02 $/KWh )
~6 MUSD
B8
125 456 678 345 567 678
B9
Station
A
C1
T1
C2
T2
B1
B2
B7
B3
B4
B5
B6
C7
Study Database for Training
Process
Real-Time Data Base
(RDB)
Operation
© ABB Power Technologies - 25
Study Data Base
(SDB)
Simulation
Study Data Base
(SDB)
Maintenance
Tractebel Engineering
Tractebel, Belgium
Project Benefits:
© ABB Power Technologies - 26
EMS supplier with proven EMS
End user Electrabel
Control System
is owned by Suez, Fr
produces 50GW, where 30GW in Europe
owns power resources all over the world
in full operation by 2003
ABB Supply
Energy Management System
TransGrid, Australia – Transmission Network
Sydney
TransGrid is responsible for the New South Wales
main grid 500/130 kV
ABB supply
© ABB Power Technologies - 27
8 Control Centers incl. emergency control center
Energy Management System including a Data
Warehouse & a full scope of EMS functions
Inter-company communication
Customer benefits
Improved supervision and control
Improved disturbance analysis
In Operation 2000
ADWEA, Abu Dhabi
ADWEA – Abu Dhabi Water and Electricity Authority
Four Control Centers
© ABB Power Technologies - 28
National Control Center for HV network
Two Regional SCADA for the electrical network
One SCADA for water distribution in Abu Dhabi
107 RTUs in substations
ABB supply
Energy Management System
Turn-key delivery
Benefits
Improved overall remote monitoring and control
Detection of outages reduce customer interruptions
Optimum Co-Generation of electricity and
desalinated water
In Operation 2000/2001
Sydkraft Nat, Sweden
Sydkraft Nat is a large distributor
Network - 130 kV to end consumers
600,000 customers
ABB supply
Distribution Management System
Replacing 19 existing SCADA systems
Customer benefits
© ABB Power Technologies - 29
Utilizing existing databases
Flexible system operation – day/night time
Improved network monitoring and control
Seamless outage management
Easy to use switch order management
Historical information for network
Network information system for assets
Interface to enterprise SAP R/3
In Operation 2004
MEW, Oman
Power
System
Voltage Levels: 132/220 kV
Total no of information points:
SCADA applications,
50 000
e.g:
Authority Assignment
Sequential Control
Utility
Data Warehouse
EMS applications, e.g:
Client/Server
7
configuration
ES40 servers; redundancy
Graphical
User Interface
7
FG workstations; 3 CRTs
5 Office workstations
Large overview screen, 3x4 meters
© ABB Power Technologies - 30
Communication
System
Optical
Fiber; 38 kbps redundancy
PLC; 1200 bps
RTU
Communication
IEC
870-5-101
32 RTU560
7 Substation Automation Systems
1 existing GE Harris
Load Frequency Control
Economic Dispatch Calculations
Load Forecasting
Reactive Power Scheduling (Optimal Power Flow)
Network Analysis (Topology and State Estimation)
Security Assessment
Short Circuit Analysis
Bus Load Forecast
Operator
Training Simulator
SONELGAZ, Société Nationale d’Eléctricité et de Gaz, Algeria
Sonelgaz - ”Renouvellment des Dispatchings”
Objectives
To improve
Establish 5
efficiency of national power supply
new load dispatch centers and IT-systems
Benefits
Matching national energy supply
Improved monitoring and control
with demand
of
power generation and transmission network
Cost savings in network operation
© ABB Power Technologies - 31
Project
National Control Center and an emergency NCC
4 Regional Control Centers
Control Center Buildings
Master Stations and RTUs
Training
5 year support contract
6 SPIDER™ EMS
In operation beginning of 2004
Sonelgaz EMS Configuration
CNC
National CC
CNCR
Emergency
CRC
Oran Region
CRC
Alger Region
© ABB Power Technologies - 32
13 operator workstations per region;
3 remote
Communications
PCU400 servers for RTU communication
IEC870-5-101
HNZ
IEC 870-6 TASE.2/ICCP
CRC
Setif Region
CRC
(Future)
8 Application servers for each region;
Redundancy
User Interfaces
CRC
Annaba Region
CRC (existing)
Sud Region
Six Client/Server configurations
RTUs
47 RTU560
200 existing ECP85 (Alstom)
Sonelgaz EMS
SCADA Functions; e.g.
Inter-Center Communication
Dynamic Network Coloring
Disturbance Data Collection;
Sequence of Events
Utility Data Warehouse
Generation Scheduling and Control
CNCR
Emergency
Load Forecasting
Thermal Unit Commitment
Interchange Scheduling
Transaction Evaluation
Automatic Generation Control
Production Costing
Generation Reserve Calculation
CNC
National CC
CRC
Oran Region
© ABB Power Technologies - 33
CRC
Alger Region
Network Analysis
Network Topology Calculation
State Estimation
Dispatcher Power Flow
Short Circuit Analysis
Security Analysis
CRC
Annaba Region
CRC
Setif Region
CRC (existing)
Sud Region
CRC
(Future)
Network Optimization
Optimal
Power Flow
Operator Training Simulator
ABB GMS&EMS Control Centers for Italy
ENEL invests in upgrade of its control
center structure
New SPIDER Control Centers
ISO - National Control Center
3 Regional Control Centers
3 Generation Mgmt Systems
22 Communication nodes, SPIDER
Upgrading of 245 new RTU 560,
in 400/220 kV S/S
Communication with 200 existing RTUs
Communication with ETrans, Laufenburg
CCI Venezia
CCI Torino
© ABB Power Technologies - 34
CCI Napoli
Terna (ENEL), Italy
Reason for CC upgrades
ABB supply
© ABB Power Technologies - 35
TSO - National Control Center
3 Regional Control Centers
3 Generation Mgmt Systems for GENCOs
22 Communication Nodes
245 new and 200 existing RTUs
Customer Benefits
Inflexible existing architecture
Obsolence/Saturation of computer platforms
New electricity liberalised market requirements
Difficult communication with the external world
Security and economy of operation
Consolidation of control centers
Improvement of performance/cost
Independence of electric market model
One single “network” structure for any present
and future application
In Operation 2001
Statnett - Control Center Project
RCC N (Alta)
RCC M (Sunndalsöra)
Statnett is TSO for main grid in Norway
Building of new Control Centers
National Control Center
3 Regional Control Centers
Control of 110 RTUs, in 400/220 kV S/S
Communication with 54 Control Centers
Handling of 105 000 data points
Contract value 15 MUSD
© ABB Power Technologies - 36
RCC S (Oslo)
NCC (Oslo)
Statnett - System Configuration
Multi-site Control Centers
C1
B8
C1
T1
125 456 678 345 567 678
B9
Station
A
T2
B1
C2
B2
B7
B3
B4
B5
B6
C7
125 456 678
125 456 678
1252
123
DEC 3000 AXP
Alpha
RCC M
123
123
123
125 456 678 345 567 678
125 456 678
125 456 678
125 456 678 345 567 678
B8
B9
T1
Station
A
T2
B1
B3
B4
B2
B5
B6
C2
125 456 678
125 456 678
B7
C7
1252
123
DEC 3000 AXP
Alpha
DEC 3000 AXP
Alpha
RCC N
25,000 points
123
123
123
123
125 456 678 345 567 678
125 456 678
125 456 678
123
DEC 3000 AXP
Alpha
20,000 points
ELCOM
RCS
...
WAN
30 RTUs
ELCOM
Statnetts own Wide Area Network
WAN
15 Control
Centers
WAN
...
WAN
5 Control
Centers
31 RTUs
T1
Station
A
T2
B2
B1
B3
B4
B5
B6
125 456 678 345 567 678
125 456 678 345 567 678
B9
B8
C1
C2
B7
125 456 678
125 456 678
125 456 678
125 456 678
C7
1252
123
123
123
123
C1
123
B9
Station
AT2
C2
B2
B7
B4
DEC 3000 AXP
Alpha
B5
B6
125 456 678 345 567 678
125 456 678 345 567 678
B8
T1
B1
B3
DEC 3000 AXP
Alpha
C7
125 456 678
125 456 678
125 456 678
125 456 678
1252
123
123
123
123
123
DEC 3000 AXP
Alpha
DEC 3000 AXP
Alpha
105,000 points
© ABB Power Technologies - 37
RCS
NCC
ELCOM
ELCOM
WAN
WAN
4 Control
Centers
60,000 points
RCC S
30 Control
Centers
RCS
...
WAN
46 RTUs
Statnett - EMS Applications
Generation Control &
Scheduling
Load
Frequency Control
ACE
HVDC
Calculation
Set-point Control
Manual
/ Scheduled
Scheduling
HVDC Set-point Scheduling
Interface to Power Plant Control
© ABB Power Technologies - 38
Real -Time & Study
Network Analysis
Systems
Daily Accepted non-metered
Interconnect Schedules
Daily Accepted Load Forecasts
Equipment Outage Scheduling
Network Model Builder
State Estimator
Dispatcher Power Flow
Contingency Analysis
Reactive Control
Optimal Power Flow
Security Constrained Control
Voltage Collapse Analysis
Short Circuit Analysis
Voltage Stability Analysis
Provides PTC transfer
limits (maximum MW
capacity) - in the current
topology and with the
worst contingency!
On-line contingency
list from SA used
Voltage Limits
monitoring in the key
station for each PTC
© ABB Power Technologies - 39
Binary search to
identify point of voltage
collapse (when the load
flow diverges)
Base Case
SA Contingencies
VCA List
Monitoring Bus
Voltage Limits
Voltage
Collapse
Analysis
PTC Limits
© ABB Power Technologies - 40
Voltage Stability Analysis
Thermal Security Analysis
Provides PTC transfer limits (maximum MW capacity) in the
current topology, calculated for the selected PTCs
Individual branch limits in the PTC not exceeded at the
event of “n-1” contingencies
PTCs to be analyzed specified in the PTC list
Overload-Initiated Protection Schemes
© ABB Power Technologies - 41
SE Solution
DPF Solution
PTC List
Other input parameters
Thermal
Security
Analysis
PTC Limits
Available Transmission Capacity
Calculates power transfer through the selected PTCs in the
current topology
Compares with the available (maximum) power transfer
Provides the spare capacity to increase the power transfer
through the selected PTCs
ATC
© ABB Power Technologies - 42
= TSA + VSA
Optionally, can use Operator Defined Limits (ODLs)
Statnett - EMS HV Network Applications
Network Analysis
Real-time / Study mode functions
PTC limit calculations / Bottleneck costs
Automatic Generation Tripping Schemes
Automatic Breaker-triggered Generation Tripping Schemes
Automatic Grid-Splitting Schemes
Fault Current Compensation in 132 kV Network via Petersen coils
© ABB Power Technologies - 43
Additional application functions
Power transfer corridors
Automatic disconnection of generation units (PFK)
Graphic displays
Load shedding (BFK)
Statnett - Operational Information System
OIS functions:
Personnel and personnel schedule information
Working orders
Scheduled maintenance
Switching agreements
Static information displays
Vedlikeholdsplaner: Region Syd
Region/OmrådeRegion Syd
Type Alle
Stasjon/Linje
Spenning 300kv
1996 27
Anl.Del Årsak
Nr Stasjon/Linje
96S432-1Hasle
96S530-2Flesaker
96S532-1Lysebotn
96S541-1Rendalen
© ABB Power Technologies - 44
Alle
10 G2
G1
F1
G3
1
8
Skala
28
15
Juli
29
22
30
29
Uker
31
32
5
33
12
August
Ombygging I Gang
Årlig RevisjonUtsatt
Mekanisk
OK Reg.
Utskifting
OK Land
Lukk Detaljplan
OIS Maintenance Plans
Status
Status Alle
Ny plan
Utskrifter
Hjelp
Statnett - Development System
RCC S
RCC M
Data maintenance/
Picture
EMS/SCADA
Test system
maintenance
B8
C1
T1
B1
B9
Station
A
C2
T2
B2 B7
B3 B4 B5 B6
C7
125 456 678 345 567 678
125 456 678
125 456 678
B9
B8
A
C1 T1 Station
C2
T2
B1
B2 B7
C7
B3 B4 B5 B6
Data maintenance/
Picture
EMS/SCADA
Test system
maintenance
125 456 678 345 567 678
B8
125 456 678
125 456 678
C1
T1
B1
B9
Station
A
C2
T2
B2 B7
B3 B4 B5 B6
Picture-database
RCC N
C7
125 456 678 345 567 678
125 456 678
125 456 678
B9
B8
A
C1 T1 Station
C2
T2
B1
B2 B7
C7
B3 B4 B5 B6
Data maintenance/
Picture
EMS/SCADA
Test system
maintenance
125 456 678 345 567 678
B8
125 456 678
125 456 678
C1
T1
B1
B9
Station
A
C2
T2
B2 B7
B3 B4 B5 B6
C7
Picture-database
B9
B8
A
C1 T1 Station
C2
T2
B1
B2 B7
C7
B3 B4 B5 B6
125 456 678 345 567 678
125 456 678
125 456 678
125 456 678 345 567 678
125 456 678
125 456 678
Picture-database
Statnett Internal WAN
NCC
© ABB Power Technologies - 45
Global Maintenance
Database (ORACLE)
Common
Picture Database
Data maintenance/
Picture
maintenance EMS/SCADA Test system
B9
B8
A
C1 T1 Station
T2
B1
B2
B3 B4 B5 B6
125 456 678 345 567 678
C2
125 456 678
B7
C7
125 456 678
B8
C1
T1
B1
B9
Station
A
C2
T2
B2 B7
B3 B4 B5 B6
Picture-database
C7
125 456 678 345 567 678
125 456 678
125 456 678
Statnett - Development System Functionality
Geographically distributed Data Engineering
© ABB Power Technologies - 46
Centralized Repository Server in NCC
Work Flow Manager
SCADA EMS Data Management
SPL code management
Picture management
Documentation Management System
Incremental Database update
Repository Server including SPICM Code Management
System
Statnett - Development System Functionality
Tests are performed in DS SPIDER
Separate RCS for local testing
Process data updates in DS from real-time system
Pictures can be linked in online server
Separate ELCOM s/w server
© ABB Power Technologies - 47
No need to disconnect/connect ELCOM partners at
EMS/SCADA switch-over
EMS Benefits
Optimum allocation of generation resources, incl. reserves
Optimum transmission network utilization
Identification of transmission bottlenecks & transfer capacity
Maximization of security; reduced black-out probability
Improved quality of supply
© ABB Power Technologies - 48
Architecture features
Complete set of EMS-modules
Network Manager The best choice for
scheduling, monitoring
and control of energy
systems:
Generation systems
HV networks
adaptable to any need
Leading edge technology & algorithms
Operator oriented
operator guidance
Peak performance
Field proven
ABB knowledge & experience
SIMPOW – Power System Simulation Software
Main functions:
Load Flow
Fault Analysis
Stability Analysis incl.
- Transient Stability
- Voltage Stability
- Load Shedding
- etc.
Resonance Freq.
Analysis
Harmonics Analysis
© ABB Power Technologies - 50
Models:
Standard Library
Dynamic Simulation
Language for user
defined models of:
- regulators
- primary components
© ABB Power Technologies - 51
Dynamic Security Assessment
Analyze the angle stability of the current state of the power system
with respect to a large number of single or multiple contingencies.
Minimum every 15 – 30 min.
The methodology is to quickly screen the large set of contingencies,
and select a small subset of the potentially most harmful ones for a
full time domain simulation.
Ranks the contingencies how they perform relative to each other.
Multiple indices used to prevent incorrect classification of harmful
contingencies.
A full (approx. 10 s.) time domain simulation is only performed for
the contingencies found to be potentially most harmful.
Early termination of a full time domain simulation further improves
the speed of the DSA.
© ABB Power Technologies - 52
Methodology
A method is used that is similar to the one used by ABB in steady
state contingency analysis.
Define a set of single and/or multiple contingencies, including fault,
fault clearance and fault clearing time.
Do a very short time domain simulation for each contingency.
Capture contingency ranking indices.
Rank contingencies based on the captured indices
Perform a full simulation for the potentially most harmful, find
contingencies that causes instability.
Early termination of a full time domain simulation further improves
the speed of the DSA.
Ranks the contingencies how they perform relative to each other.
DSA results
Contingency ranking
8
7
6
5
4
3
2
1
Full simulation results
0
CTG 1
CTG 30
CTG 2
CTG 22
CTG 11
CTG 10
CTG 5
Contingency name
CTG 25
CTG 27
CTG 20
CTG 7
Contingencies not reaching 10 s. simulation time are unstable
Total relative severity example
CTG 1
CTG 30
CTG 2
Contingency names
© ABB Power Technologies - 53
CTG 22
CTG 11
CTG 10
CTG 5
CTG 25
CTG 27
CTG 20
CTG 7
0
2
4
6
Duration
8
10
12
© ABB Power Technologies - 54
RTSE
© ABB Power Technologies - 55
RTPF
© ABB Power Technologies - 56
STSE
NMA verification tests
Parameter test
© ABB Power Technologies - 57
Warning: SERIES_REACT in line TROY400BLOD TIE has a value that is out of
range, it is 35.689999 and it should be between 0.05 and 30.0
Complete model test
Topology test
Term test
Loose end test
Island test
© ABB Power Technologies - 58
NMA
© ABB Power Technologies - 59
NMA
Study Database for Training
RDB
Save Case
© ABB Power Technologies - 60
Study Data Base
(SDB)
Save Case
Application
Programs