Transcript Document
Jarpe Data Solutions, Inc
Development of Mine Explosion Ground Truth Smart Sensors
Seismic Instrumentation Technology Symposium
Albuquerque, NM
June 16, 2011
Steven R. Taylor
Phil Harben
Rocky Mountain Geophysics, Inc.
Steve Jarpe
Jarpe Data Solutions, Inc.
David B. Harris
Deschutes Signal Processing, LLC
SBIR Sponsored by Department of Energy – Office of Science
Jarpe Data Solutions, Inc
SBIR Phase I
• One challenge of DOE GNEM Program is obtaining accurate
locations over broad areas
• Obtaining accurate locations over broad areas requires GT
data providing accurate epicenter and OT
• We are developing a Ground-Truth Monitoring System
(GTMS)
consisting of an inexpensive, lightweight smart
sensor unit that
can be mailed to and emplaced near large
mining regions
The Challenge*
• Monitoring Goals (standoff distance < 5 km)
• 1 km epicentral distance
• 0.1 second origin time
• 0.3 magnitude units
• Hardware Goals
• System cost < $1000
• Weight < 1 lb
• Autonomous operation for 6 months
• Onboard processing to locate and characterize events
* Large Mining Explosions
How do we achieve these goals?
Ground Truth Monitoring System + Ground Truth Processing Center
Jarpe Data Solutions, Inc
SBIR Phase I
Jarpe Data Solutions, Inc
SBIR Phase I
Jarpe Data Solutions, Inc
SBIR Phase I
.