(MMCT) “Galitsyno”

Download Report

Transcript (MMCT) “Galitsyno”

Investment Project
Construction of Multi-purpose Marine
Complex of Terminals (MMCT)
“Galitsyno”
About project
Limited Liability Company “MMCT “Galitsyno” was established in 2007. The
company owns incomplete construction projects and other assets of “MMCT
“Galitsyno”, and also accomplishes functions of a customer in project development,
fulfills licensing procedures and implementation of the project “MMCT “Galitsyno”.
In future LLC “MMCT “Galitsyno” will accomplish functions of a port and cargocarrying operator.
Two Ukrainian companies own 50% each of equity rights of LLC “MMCT “Galitsyno”.
2
www.titul.net.ua
Structure of platforms of
MMCT

SEA PORT
9 specialized terminals for cargo
handling

32 railroads for receiving and
sending of railroad trains


LOGISTICS CENTER
Warehouses for storage,
assortment and other types of
handling of goods
3
RAILWAY STATION
TECHNOLOGICAL COMPLEX
Plants for для mid handling, sub
assembly etc., types of cargo
handling
www.titul.net.ua
Port characteristics
4
Number of landing places
32
Total length of landing places
5 945 m
Maximum depth close to landing places
15 m
Width of access board (from a landing
place into the depth of a terminal)
650 – 850 m
Number of located warehouses (stacks)
From 5 to 8
Capacity
1-2 steps: 35 mln. t per year
3 step: up to 100 mln. t per year
www.titul.net.ua
Location peculiarity
Nikolayev has access to important European and international
directions
5
www.titul.net.ua
Location peculiarity
Sea and land ways of Eurasia lay through Nikolayev
6
www.titul.net.ua
Location peculiarity
Number of water and land routes, going through
three main sea regions of Ukraine
7
Illichevsk
Odessa
Nikolayev
Railway direction
++
++
++++
Auto direction
+++
+++
++++
Inner river routes
+++
Intransit river routes
++
River – sea
+
+
++
Oversea shipment
+
+
+
Air transportation
+
+
+
www.titul.net.ua
Location peculiarity
Crossing of 4 transport directions through Nikolayev region
and amount of operating railway stations
8
www.titul.net.ua
Location peculiarity
MMCT “Galitsyno” will be located within 8 km from Nikolayev and 36 km from the
Black Sea between operating sea ports “Oktyabrsk” and “Dnieper-Bug”.
9
www.titul.net.ua
Location peculiarity
The platform where the port is located was formed in the result of sand recultivation
after dredging works
10
www.titul.net.ua
A map from the satellite
11
www.titul.net.ua
Major premises, business
provisions and risks











12
Legislative warranties of private ownership of port objects
Prospective market in the basin of the Black Sea –14 countries, ~ 250 mln. people
Lack of port capacities in the northern part of the Black Sea
Deficiency of a big port with logistical and technological terminals in the basin of the Black Sea
Deficiency of opportunities to enlarge operating ports in countries of the Black Sea basin
MMCT is located along an elongation vector of the VII Danube alley way towards water way
along the river Dnieper
MMCT is located along the logistical route of a ring road around the Black Sea
Availability of areas for leveed platforms and water area of the port on the water area of the
Dnieper-Bug basin
Availability of areas for composition of port objects (railway stations, logistical warehouses and
plants)
Legislative opportunity to grant the status of free trade zone to these territories
Application of new approaches and technologies in complex handling of goods
www.titul.net.ua
General layout on the map
from the satellite
13
www.titul.net.ua
Implementation plan
General layout:
The 1st phase of the project – red color, the 2nd – green, the 3rd – yellow
14
www.titul.net.ua
Implementation plan
Approved scheme of zoning of the plot for construction of the port and logistics
terminal, railway and auto entry on the 1st and the 2nd phases of the project
15
www.titul.net.ua
Photofixation
View overlooking a coastal zone and prospective MMCT from a roof
of a five-storied administrative building of LLC “MMCT “Galitsyno”
16
www.titul.net.ua
Photofixation
Coastline of the territory of “MMCT “Galitsyno”
17
www.titul.net.ua
Photofixation
Warehouse equipment and technologies
18
www.titul.net.ua
Photofixation
Administrative building
19
www.titul.net.ua
Financial indexation




20
Overall costs – 2,7 bln. $
Cost of the 1st step – 0,55 bln.$
Total construction period – 4,5 years
Payback period – from 5 to 10 years
www.titul.net.ua
Plan of investor entry into the
project
1.
2.
3.
21
Memorandum ratification between Investor and Owner of LLC
“MMCT “Galitsyno” on entry into the Project.
Purchase of not less than 76 % of equity rights and effective assets
of LLC “MMCT “Galitsyno” by the Investor on contractual terms of
the contract of purchase and sale.
Establishment of An Asset Management Company (out of the
territory of Ukraine), where Investor will own 76% of equity rights.
www.titul.net.ua
INVESTMENT- REAL ESTATE DEVELOPMENT
COMPANY “TITUL”
CONTACTS:
President of the company: Telman Abbasov
Tel.: +38 0487155551, +38 0674899222
Email: [email protected], [email protected]
Site: www.titul.net.ua
22
www.titul.net.ua