RTUs - srldc
Download
Report
Transcript RTUs - srldc
SCADA/EMS System
An Overview
DATA ACQUISITION PRINCIPLE FOR ULDC SCHEME
P
P
Q
SS
P
DS
SS
V
F
V
SS
SS
F
P
Q
O
SS
MW
Q
F
FREQUENCY
MVAR
O
V
SS
DS
SS
SS
SS
DS
P
Q
SS
SS
SS
DS
DS
SS
SS
DC
SS
SS
SS
Q
DS
Q
TAP POSITION
THE
PARAMETERS
ARE
FOLLOWING STATIONS :
MONITORED
•Substations 220 KV and above
VOLTAGE
SINGLE STATUS
ISOLATOR POSIITION, PROTECTION,
LOSS OF VOLTAGE
DS
DOUBLE STATUS
CIRCUIT BREAKER POSITION
DC
DIGITALCONTROL
CIRCUIT BREAKER CONTROL
•132/110KV AC Interstate Tie lines and in loop of 220 KV
transmissions system
•Generating Station above 50MW capacity.
•Significant stations identified by constituents
FOR
RSCC ARCHITECTURE
SCADA/EMS
Servers
Communication
Front-end
ISR
Servers
ICCP
Servers
Operator
Consoles
(*)
WAN
Routers
To
SLDCs,
CPCC
To RTUs
DTS
Server
DTS
Operator
Consoles
Remote
VDUs
Headquarters
(*) Five 2-CRT consoles, two 1-CRT consoles and one Operations Scheduling Console
Development
Server
Development
Console
Network
Management
Console
Peripheral
Equipment
SLDC ARCHITECTURE
`
SCADA/EMS
Servers
Communication
Front-end
ISR
Servers
Network
Management
Console
ICCP
Servers
Operator
Consoles
(*)
Peripheral
Equipment
WAN
Routers
To RSCC,
Sub-LDCs
To RTUs
Remote
VDUs
Headquarters
Three or four 2-CRT consoles, one 1-CRT consoles and one Operation Scheduling console
Development
Console
Development
Server
To relevant SLDC (Sub-LDCs)
or to RSCC (CPCC)
Processor/
Desktop console
Communication
Front-end
WAN
Routers
Peripheral
Equipment
SUB-LDC/CPCC ARCHITECTURE
HIM OVERVIEW
SCADA/EMS
Servers
ISR Servers
Sampling
Directives
and
Storage
Definitions
Retained
Data
Reconstructed
Data
Sql*Net
Operator
Consoles
HIM
Sampler
HIM
Recorder
HABITAT
dBs
Export
Import
HIM tables Archiving
Reconstruction
and Maintenance
JUKE BOX
Files
Habitat dB
relational database
ORACLE Export file
SYSTEM CO-ORDINATION & CONTROL
PROJECT
(NORTHERN REGION)
J&K SEB
• 1 SLDC
• 1 Sub-LDC
• 13 RTUs
Jammu & Kashmir
Gladni
H
F
F
Laltonkalan
Patiala
Narwana
F
F
Dadri (B)
F
F
F
Ratangar
h
Chandigarh,BBMB
FRishikesh
F
Dadri (H)
Rajasthan
H
Heerapura
• 1 SLDC
• 4 Sub-LDC
• 21 RTUs
F
H H
F
HVPNL
H
BBMB
Hamirpur
Ganguwal (B)
Jutog
Kunihar
Himachal
Pradesh
Jallandhar (P)
• 1 SLDC
• 2 Sub-LDC
• 40 RTUs
China
F
Jallandhar (B)
• 1 SLDC
• 2 Sub-LDC
• 19 RTUs
• 1 SLDC
•2 Sub-LDC
• 16 RTUs
Bemina
Pakistan
PSEB
HPSEB
Panipat (BBMB)
Panipat(HSEB
Moradabad)
F
H
FDESU
FJF
HF
F
Delhi
• 1 SLDC
• 4 Sub-LDC
• 31 RTUs
Uttar
Pradesh
Panki
F
F
DVB
H
Lucknow
F
Sultanpur
F
RVPN
Bhilwar
a
• 1 SLDC
• 3 Sub-LDC
• 21 RTUs
H
F
Kota
F
Varanasi
Madhya
Pradesh
Gujara
t
SLDC
Sub - LDC
F
RLDC
•NEW DELHI
• 38 RTUs
CPCC
KANPUR
4 RTUs
UPPCL
• 1 SLDC
•5 Sub-LDC
• 82 RTUs
Data flow in ULDC scheme
SLDC
RSCC
OPERATOR CONSOLE
SLDC
OPERATOR CONSOLE
OPERATOR CONSOLE
RTUs
REPORTING
TO RSCC
RTUs
SLDC
DS
RTUs
REPORTING
TO SLDC
SUBLDC
DS
RTUs
SLDC
ICCP
RTUs
RTUS
REPORTING
TO SLDC
DATA OF
CS &
OTHER
SLDCs
RSCC
ICCP
CPCC
RTUs
SLDC
DS
RSCC
DS
DATA OF CS &
OTHER SLDCs
RTUs
SLDC
ICCP
CS RTUs
REPORTING
TO RSCC
SUBLDC
DS
RTUs
J & K, PUNJAB, BBMB, HPSEB
DELHI
MAIN DATA
J & K, PUNJAB,BBMB,HPSEB
MAIN DATA
S/B DATA
UP SEB
MAIN DATA
S/B DATA
SONEPAT
KANJHAWALA
NAJAFGARH
UPSEB
S/B DATA
PANIPAT
BAWANA
MURADNAGAR
NARELA-JHANGIRPURI- GOPALPUR-WAZIRABAD
-
DADRI HVDC
BAMNAULI
A
PATPARGANJ
DELHI
STD BY
BALLABGARH
IP EXT
OKHLA
SARITA VIHAR
BADARPUR
MALVIYANAGAR
RSCC
VASANT KUNJ
RAJESTHAN
MAIN
MEHRAULI
CRITICAL STATION AFFECTING
COMMUNICATION LINK FROM
SLDCs TO RSCC
MOST CRITICAL STATION AFFECTING ALL MAIN &
STANDBY DATA OF ALL SLDCs : BADARPUR
SECOND MOST CRITICAL STATION AFFECTING MAIN
DATA OF ALL SLDCs
: MURADNAGAR-I
: DADRI HVDC
:BALLABGARH
OUTAGE OF PANIPAT & DHULKOTE WILL ALSO AFFECT
main and standby of ALL SLDCs EXCEPT UP &
RAJASTHAN
FREQUENT PROBLEMS OF COMMUNICATION
SYSTEM
POWER
SUPPLY
LOAD SHEDDING IN RURAL LOCATIONS
HIGH RESTORATION TIME DUE TO UNMANNED REMOTE
LOCATIONS.
• FIBER OPTIC CUTTING
• ONLY UNDER GROUND CABLES AND APPROACH CABLE.
• FADING
• E.g.- 1.
2.
Rihand-Singrauli Region ( No Diversity Antena)----Summer
Meerut – Muradnagar --------Winter
SCADA Support Functions
CONFIGURATION
MANAGEMENT
FACILITY TO ADD &
DELETE ADDRESSES AND
LINKS, CONTROL DATA
BLOCKS AND SET DATA
TRANSMISSION AND
RECEPTION
PARAMETERS
MAINTAIN & CONTROLS
GRAPHICAL DISPLAY OF
NETWORK CONNECTIVITY
AND DEVICE STATUS
FAULT
MANAGEMENT
ALARMS FOR ERROR
HANDLING.
REMOTE AND LOCAL
DIAGNOSTICS
NETWORK SERVICES
NETWORK PRINTING
MANAGEMENT.
REMOTE PROCEDURE CALL
REMOTE TERMINAL
SESSION
NETWORK TIME SYNC
BACK UP OVER LAN
EMAIL
PERFORMANCE
MONITORING
MAINTAIN
PERFORMANCE,
RESOURCE USAGE AND
ERROR STATISTICS FOR
ALL MANAGED LINKS
AND DEVICES.
PROVIDE FACILITIES FOR
PATH AND ROUTING
CONTROL AND QUEUE
SPACE CONTROL
SCADA Problems
CFE
hanging frequently at many locations resulting
into loss of RTU
Frequent failure of Applications resulting into
failure of DATA SERVERS. Interruption of data and
loss of HIM data.
In HDR different values at the same time point with
change of sample rate
In HIM Frequent crashing of Oracle, reset of juke
box,long term storage of Data
Reports for MIN,MAX,Avg still not available
SCADA Problems
(continued)
LAN-B/NETIO
problem
Shortcoming in trending functions ( scale , tabular
etc.)
Frequent tripping of UPS especially at SUBLDC
level.
Non deployment of the trained person at SUBLDC
level
EMS SOFTWARE FUNCTIONS
OPERATION
SCHEDULING
Load forecasting
Inflow forecasting
Unit commitment
Hydro scheduling
Hydro Thermal
Coordination
Interchange scheduling
Interchange transaction
evaluation
Current operating plan
Outage scheduling
LOAD GENERATION
BALANCE
Operation monitoring
AGC
Economic despatch
Reserve monitoring
Loadshed /Restoration
Production costing
POWER SYSTEM
ANALYSIS
Network
Topology
State estimation
Contingency
analysis
Optimal power
flow
Transmission
loss sensitivity
factors
Post disturbance
analysis
EMS PROBLEMSRESOURCE SCHEDULING &
COMMITMENT (RSC)
Scheduling
Philosphy 15 minutes block instead of
hourly.
Regional and Inter-regional bi-lateral not covered
Desired treatment of Hydro station not provided
Share/Entitlement not provided as per requirement
Unit wise scheduling instead of Plant wise
No provision of Regional and inter-regional losses.
EMS NETWORK APPLICATIONS
(State Estimation,Contingency
Analysis,Security Enhancement)
Non-Availability
of Complete Status of CBs and
Isolators through Telemetry.
Non-Availability of complete Generator data such
as capability curve etc. Database modelled with
typical generators.
DISPATCHER
TRAINING
SIMULATOR
Dispatcher Training Simulator (DTS)
What is DTS ?
The Dispatcher Training Simulator (DTS) is a
Group of applications and related displays that
Create a training environment.
In this environment the Dispatcher can practice
routine and emergency Tasks.
Dispatcher Training Simulator (DTS)
Control centre
Applications
SCADA
EMS
+
Power system
Dynamic
Simulation
Prime
+
Mover ? and
Relay dynamics ?
Power flow
Instructional
Subsystem
Event
Management
DTS
Control
Dispatcher Training Simulator (DTS)
SCADA
Collect data from the monitored system
Issue Control Commands
EMS
Pre despatch functions
Real time despatch functions
• Generation dispatch
• Network Analysis
DTS -Application
Primary use:
Training
of Dispatchers for routine and emergency scenario in
a controlled and safe off-line manner.
Network split, blackouts
Large
voltage or frequency excursions
Engineering
tool for operations planning
(generation plans, network switching, etc..) and for
understanding of power system behavior.
DTS -Application
Tuning of EMS applications (Network, Generation etc.)
Test bed
for new EMS functions
Validating
Factory
new databases before upgrading EMS
acceptance tests
Demonstrations
DTS –PROBLEM
UNABLE TO INITIALISE FROM REAL TIME
Critical SERVERS of ULDC WAN.
Data
server at SUBLDC
ICCP server at SLDC
ICCP server at RSCC
Data server at RSCC
DATA from each control centre is important in
the system to get good results of EMS
applications .
Recent Problem
Data
is being interrupted in case of outage of standby
Links in spite of availablity of Main links.
E.g Outage of sarita Vihar (07.11.03) and Wazirabad
(12.11.03)
Testing was carried out on 11.11.03 by manualy
switching of MCB at Sarita Vihar.
RTU Reporting Status
1. Total RTUs-366
2. RTUs Integrated-333
3. RTUs Reporting- 275
BEMINA SUBLDC HAVING 8 RTUs
NOT INTEGRATED.
Pending important Analog points
1
Gross unit generation data for
Badarpur,Singrauli, Unchahar not available.
2 Unit generation data of Dadri-Gas, Anta
,Chamera and Auriya not available.
3 Few line/ICT flows not available.
Pending important Digital points
1.
NTPC- AURIYA, BADARPUR,DADRI-GAS
2. POWERGRID- SOME POINTS PENDING.
3. DTL- 50 % PENDING
4. UPPCL- 30 % PENDING
5. RVPNL- 20 % PENDING
PLCC LINK PROBLEM
1. EITHER MAIN OR STAND BY LINK FOR AGRA,
ALLAHABAD, FARIDABAD –PP, MEERUT,
VINDHYACHAL,ABDULLAPUR, MALERKOTLA,
NALLAGARH AND SRINAGAR NOT WORKING.
2. EITHER MAIN OR STANDBY LINK FOR SALAL,
BAIRASUIL, CHAMERA, URI, ANTA,AURIYA,
UNCHAHAR, NARORA AND RAPP NOT WORKING.