European leader in naval defence
Download
Report
Transcript European leader in naval defence
TRIDENT d’OR 2005
Operational feedback
European leader in naval defence
1. Trident d’Or 2005
2. Operational Deployment
3. Network Management Issues
4. Tactical Picture Issues
5. Conclusion
2
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
PLAN
Name : TRIDENT D'OR 05
Type: French/Italian bi-lateral maritime exercise with
allied, Joint Force, Multi-national participation.
Dates : 29 March - 02 April 2005 (training)
04 April - 15 April 2005 (LIVEX)
Aim : TD 05 will provide FR HRF (M) HQ
with the role and the responsibilities
of MCC in the preparation and
conduct of a generic UN mandated
operation under JFC direction in
accordance with NATO procedures.
HRF (M) HQ = High Readiness Forces (Maritime) Head Quarter
Participants
Nation
France
Italy
Germany
Spain
Greece
Turkey
Canada
USA
NATO
TOTAL
MCC = Maritime Command Component
3
European leader in naval defence
Surface
Ships
Air
Platforms
19
4
8
2
2
1
4+5
1
1+4
1
3
40
1
1
13
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
1. Trident d’Or 2005 - Presentation
TDL Objectives
To validate and to refine the French “MICO” cell concept
To validate the operational use of J-Sat for the first time in France
Main figures
Planning : 7 months, only 3 for the equipment issues
Preparation and delivery of 5 cells (3 onboard and 2 ground sites)
Interface 3 sites with a MIDS – type D shelter from French Army
On board ships : 10 000 meters of wire - 6 antennas HF or UHF
Coordinate about 60 people for all the sites
Challenges
Persuade war fighters of the benefit of such a TDL operation
Provide units without previous TDL capability a complete information center
able to receive and transmit on Link 11, Link 16 and J-Sat
Train operators from Army, Air force and Navy to use a new system
To manage for the war fighters the complete LDT issues
4
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
1. Trident d’Or 2005 – TDL Objectives and challenges
The French Navy has chosen DCN for its leading multi-link systems
and knowledge of operational needs
DCN company is the main prime contractor for the French Navy CMS
35 years of experience in TDL systems development
LINKS®, a comprehensive TDL products range to network the force
Stand-alone, transportable, easy to use
LINKS® EYE-11 to insert a unit in a TDL network
Dedicated to platforms without previous TDL capability
LINKS® MIND to operate multi-link architectures
2L11, L16, J-Sat simultaneously with data forwarding functions
LINKS® HEAD to receive real-time tactical picture over IP or J-Sat
Dedicated to Head Quarters with an XML interface to export the picture to a CSS
LINKS® EARS to support the JICO
Multi-link tactical picture fusion and analysis
5
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
2. Operational Deployment – LINKS® system
DCN participation
Technical expertise for the
preparation of the exercise
Operators training
Deployment of 5 LINKS® systems
5 persons on board for real time
support in operation
LINKS® Deployment
Platform
TDL Capacity
LINKS® EARS as JICO support tool
MICO: BCR SOMME
2*L11, L16, J-Sat
RICO: BAP JULES VERNE
L11, L16, J-Sat
LINKS ® HEAD for Head Quarters
HRF (M) HQ: Toulon
L16, J Sat
MCC: CVN Charles de Gaulle
J Sat
CAOC: Taverny
J Sat
6
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
2. Operational Deployment – LINKS® system
MCC CdG
French CVN
7
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
2. Operational Deployment – N37 Team
RICO Jules Verne
MICO Somme
European leader in naval defence
Information Center
Optimus - GE
MIDS – D Shelter
8
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
2. Operational Deployment – MICO Cell
Briefing
Area
Video projection
screen
LMS 16
Chat
LINKS
HMI n°1
LINKS
HMI n°2
MSG
Traffic
2xLMS 11
Operational
Area
9
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
2. Operational Deployment – MICO Cell
WISE
3. Network Management – L11 planned architecture
DNCS
MICO
DLM L11 +
DNCS
Embargo Area
RICO
OPNET L16
DLM L11 +
DNCS
10
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
DLM L11
DLM L11
DNCS
L11↔L11 DF issues
MICO
L11 Connectivity issues
Net Cycle Time > 25 s !
11
OPNET L16
DLM L11 +
DNCS
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
3. Network Management – L11 set up architecture
Main causes of the Network Management issues
No respect of the OPTASK LINK message
IUs TDL limitations
Interoperability issues
The JICO support tools must provide solutions in order to
Control in real time the application of OPTASK LINK by IUs
Know the capabilities and limitations of all IUs
To clearly identify the I/O issues between the participants and the way to
bypass the problem
Multi Link Architecture (MLA)
In parallel of these points, the MLA will move permanently
This means that the MICO needs to have “free hands”
To adapt and fix MLA
To distribute roles, duties and functions IAW the moving scenarios
12
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
3. Network Management - Analysis
4- Tactical Picture - Observations
Inconsistent data
Surface speed > 3000 Kts
IU 24 PPLI
+ TN 2235
2 L11 + 1 L16
networks
E2C
NURAGHI
E3F
Liners
Dual
designations
13
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
Zoom Area
Main causes of the tactical picture issues
TDL operators poor skills and wrong behavior
Interoperability issues
Navigation errors
Inconsistency of the track data
Low performance of correlation algorithms
The JICO support tools must provide solutions in order to
Make the ship navigate
Make the aircraft fly
Make the operator operate
Make the war fighters decide
For all this, the Picture must be clear and clean
The role of the Tactical Data Link Team is to HELP and not to SPY
operator’s behavior and blame them
14
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
4. Tactical Picture - Analysis
The MICO has to see on the tactical picture :
Tracks data
Symbology, Name, C/S, etc …
Track Number
Reporting Unit
Units data
Track Number Blocks
TDL duties and functions
Position, movement
Issues
Dual Designation
Data Looping
Problems, conflicts
Everything has to be seen at a glance
15
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
4- Tactical Picture – MICO required features
Correlation
Be able to correlate tracks coming from local and external sensors
Fusion
Be able to fuse a picture coming from different links
Unicity
Be able to control and direct the unicity of the picture
Forwarding
Be able to forward data between all links with enhanced filtering functions
Reach back
Be able to send over IP or J-Sat a correlated, fused, and unique tactical
picture to the HQs
16
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
4- Tactical Picture – MICO required features
Main Objectives for French Navy
Main Objectives for TDL aspects
FN obtained the FOC for the HRF (M) HQ
Very good training for all the participants
We demonstrated the real need for maritime point of view of a cell able to
manage Links
We were able to activate the reach back capability
Actions to be taken
17
Hard Training = Easy War
FN TDLT is going to provide to the HRF (M) HQ the MICO operational and
Technical Requirement Document
FN TDLT provided in September 05 the Concept of Employment for JSAT
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
5. Conclusion – Operational Point Of View
To succeed, both operational and industry have to work together
To build what operational people need
Reduce the cost
Operational people provide to the industrial
The way the operations are conducted today
An operational feedback on the tools
The industrial provides to the operational people
The way the system is working regarding the way it has been specified
How technology can fix issues
Having the industry on board the MICO Cell is a big help
Who knows when the sea is very strong you can have what you want for
free……
18
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.
5. Conclusion – Relationship OPS industry
19
European leader in naval defence
This document and its information are the property of DCN. They can not be reproduced without prior and written agreement.