Transcript Document

The Current State of SCADA
Arlen Nipper - Cirrus Link
Rob Coulter - IBM
How can we apply technology to:
• Mitigate environmental risk?
• Detect leaks earlier?
• Resolve problems faster?
• Manage audit and regulation more effectively?
Instrumented
Interconnected
• Run operations more efficiently?
Intelligent
Basic SCADA Architecture
1
SCADA
Host
3
5
Protocol X
Multi-Drop
Network
2
4
SCADA Protocols & Applications: The Good, The Bad, and The Ugly
SCADA Protocols & Applications: The Good, The Bad, and The Ugly
Allen-Bradley DF1
Allen-Bradley DH+
Allen-Bradley EN/IP
Amocam
ARCNet
ATS
BITbus
CANbus
CA
CCM2
CDCI
CDCII
Conitel
DeviceNet
Daniel
DL130
DNP 3.0
Elliott
Enron Modbus
F&M
Ferranti MK2A
Galveston-Houston
GPE
GSI
Harris 5000/5500/6000
Hansa S002
HART
Hayes
Honeywell DE
Kodata
L&J
LANDAC
Landis & Gyr
Micromotion Flowscale
MODBUS ASCII
MODBUS RTU
MODBUS Plus
MPS9000
MTS
Omron Host Link
Optomux
PERT 2631
Plessey TC6
RDACSII
REDAC 70H
RNIM
Siemens 3964R
Siemens RK512
SLIP
SNET -I
SNET –II
GE SRTP
TANO Model 10
TANO Model 100
Tejas
Total-Flow
Transit Bus
TRW 9550
Valmet Series 5
Transmitton MT700
TRW S-70
TRW S-703
Varec
Wesdac 4F
WISP
Wireless HART
Poll / Response Latency
Example Case - Polling Modbus over VSAT
Assumptions:
- 16 remote sites on one logical channel
- 1 poll for digital input values
- 1 poll for analog input values
Establish TCP/IP socket connection from
the SCADA Host to the remote site:
4 seconds
Send the poll for digital inputs:
4 seconds
Send the poll for analog inputs:
4 seconds
Tear down the socket connection:
2 seconds
-----------------------------------------------------------------------Total time to poll one site:
14 seconds
14 sec / site X 16 sites = 224 seconds
or 3.7 minutes to refresh all data
Future Apps &
Integration
Analytics &
BIG DATA
Electronic Flow
Measurement
ERP
Mobile Apps
Asset Management
& Optimization
“Enterprise (IT)”
1
SCADA
Host
3
Protocol X
2
“Operations (OT)”
Future Apps &
Integration
SCADA
Host
Analytics &
BIG DATA
SCADA
Host
Electronic Flow
Measurement
SCADA
Host
ERP
SCADA
Host
Mobile Apps
SCADA
Host
Asset
Management &
Optimization
SCADA
Host
“Enterprise (IT)”
“Operations (OT)”
Future Apps &
Integration
SCADA
Host
Analytics &
BIG DATA
SCADA
Host
Electronic Flow
Measurement
SCADA
Host
ERP
SCADA
Host
Mobile Apps
SCADA
Host
Asset
Management &
Optimization
SCADA
Host
“Enterprise (IT)”
“Operations (OT)”
Future Apps &
Integration
SCADA
Host
Analytics &
BIG DATA
SCADA
Host
Electronic Flow
Measurement
SCADA
Host
ERP
SCADA
Host
Mobile Apps
SCADA
Host
Asset
Management &
Optimization
“Enterprise (IT)”
SCADA
Host
“Operations (OT)”
Operations Managers’ Comments
• “Our poll response cycle time is 12 minutes.”
• “If a leak occurs, time is everything!”
• “We had two major spills in the last two years. Clean-up of our last spill
cost $6,000,000”
• “We are taxed on the greenhouse gases we emit so need to calculate
and optimize but do not have the capability to effectively do so today”
• “SCADA host companies charge for each protocol they attach to the
host. The cost is approx $10K/protocol plus 25% maintenance per year.
We have 32 different protocols ($320,000 upfront and $80,000 per
year)”
• “We need better access to our other field devices beyond just the PLC’s”
• “How can we provide other lines of business applications with our
operational data without compromising the SCADA host application?”
*YDKWYDK
Future Apps &
Integration
SCADA
Host
#2
SCADA
Host
#1
1
Analytics &
BIG DATA
Electronic Flow
Measurement
ERP
Mobile Apps
2
3
?
Asset Management
& Optimization
4
5
n
“Enterprise (IT)”
“Operations (OT)”
IT || OT
Summary
Poll-Response SCADA systems were perfectly viable solutions when first
developed 35 years ago. They have served the industry well, and continue to
do so. But we are entering 2014 and are now challenged with:
• Device protocols tied intimately to applications.
• A need to significantly reduce critical data update times.
• Current network bandwidth consumption limiting additional
information.
• “One to One” information silos.
• “Operational Intelligence” stranded in field devices!