SP-8 - TMCnet

Download Report

Transcript SP-8 - TMCnet

Defining the
Next-Generation Access Network
Slideware Versus Reality
Robert A. Bivin
2002 Top Ten: Words of Wisdom
Source: Light Reading
CONFIDENTIAL
“Powerpoint has become a virus”
Scott Kriens, CEO Juniper Networks, Inc.
2
Slideware
CONFIDENTIAL
Softswitching is everything:
Lower capital cost
More features
Smaller footprint
Lower operating costs
Freedom from the incumbent switch suppliers
An IP access network solution
Ready today
3
Industry Confusion
CONFIDENTIAL
$
4
Reality – One Perception
CONFIDENTIAL
 Progress is being made in the industry
• Product features
• Sustained voice traffic
 Financial pressure is taking its toll
 Service providers are adopting the technology
• Slowly
• Cautiously
 First Class 5 next generation switching will be ATM based
 Next generation switching will happen
5
A Gradual Migration to Packet
CONFIDENTIAL
TDM
PSTN
Packet
Network
DLC
Class 5
Switch
Packet
Packet
Network
The Future
6
Today
DSLAM
Call Agent
Packet
Media
Gateway
Next Generation
Class 5 Switch
Access
Gateway
Next Generation Class 5 Switch
CONFIDENTIAL
SS7
SIP-T
Call Agent
(Call Control)
TDM
ATM
IP
7
Media
Gateway
(Switching Matrix)
GR-303
H.248/MEGACO
MGCP/SIP
TDM
ATM
IP
Access Gateway
CONFIDENTIAL
ESA
Packet
Transport
Advanced
Signaling
TDM
to
Packet
•
•
•
•
POTS
Specials
COIN
etc.
DSL
8
Switching Fabric
H.248/MEGACO
Copper
Termination
Steps in the Network Migration
CONFIDENTIAL
Optimize
Network
9
Packetize
Network
Migrate
Switching
Access Migration Steps
CONFIDENTIAL
T1/L-POTS
POTS
OC3c
DSL
TR-008/Analog
T1
POTS
OC3c
DSL
 Concentrate subscribers
 Collapse remote switches
GR-303
POTS
OC3c
DSL
H.248/MEGACO
10
 Converge network
 Replace switches
Switch Re-homing
CONFIDENTIAL
Before
Remote
Legacy
Master
Class 5
Multiple Costs:
•
•
•
•
11
Remote
Legacy Slave
Class 5
Switch Maintenance
Software Rtus
Upgrade HW/SW
Warranty/service Plans
Legacy
Slave
Class 5
Remote
Switch Re-homing
CONFIDENTIAL
After
North LET
(Master)
West LET
OC3
OC3
4 Fibers
GR-303
15 T1X
OC3
Data
Network
OC3
PSTN
NGC5
Switch
GR-303
15 T1X
12
South LET
GR-303
15 T1X
East LET
Cap – Roll – Replace
Moving into the Future
CONFIDENTIAL
Roll
Shorten
OPEX $
Shorten
Cap
Replace
Time
13
Next Generation Switching is Happening
CONFIDENTIAL
Sprint lets $1.1B contract for C2P (Circuit to
Packet) Phase One program
• Collapsing COs
• Rebuilding Network
RUS trials underway for NGC5 switches
• Taqua
• Santera
Customers are purchasing switches
14
Summary
CONFIDENTIAL
Next generation switching will arrive
Plenty of work to be done in the network before
switching arrives
Maturing advanced technology will obviate the
need for “advanced slideware”
15
Defining the
Next-Generation Access Network