Wednesday, April 14, 2010
Download
Report
Transcript Wednesday, April 14, 2010
Residential Legacy
Service Migration
Wednesday, April 14, 2010
Total Access 5000
Services Migration Landscape
® Adtran, Inc. 2010 All rights reserved
Competitive Landscape
Tellabs 8800 Series
– Supports ATM to Ethernet IWK
2-Port Channelized OC3/STM-1 IMA
168 T1 or 126 E1 channels
Maximum of 42 IMA Bundles
– Supports Frame Relay, PPP/MLPPP to Ethernet
Migration
– Supports Frame Relay over MLPPP
– Supports BCP for MLPPP
– Supports L2 switching / L3 routing
8830, 6 Slot system
8840, 15 Slot system
8860, 19 Slot system
® Adtran, Inc. 2008 All rights reserved
3
Competitive Landscape
Cisco 7600 Series
– Varying Slot / Chassis Configurations
– Leased Line Services
Channelized T1/E1
Channelized T3
Channelized OC3/STM-1
– ATM Interworking Support
OC3/STM-1
OC12/STM-4
OC48/STM-16
– 10G, GigE, Fast Ethernet
® Adtran, Inc. 2008 All rights reserved
4
Competitive Landscape
Zhone MALC
–
–
–
–
Full MSAP
Supporting ADSL2+, VDSL2
ATM Migration, EFM
FTTH (GPON and Active E)
Calix C7 Series
–
–
–
–
MSAP
Supporting A/V DSL
Supporting ATM Migration
FTTH (GPON and Active E)
Occam BLC 6000
– Supports FTTH (GPON and Active E)
– Supports PPP/MLPPP
® Adtran, Inc. 2008 All rights reserved
5
Total Access 5000
Residential Services Migration
ATM Aggregation and Interworking
® Adtran, Inc. 2010 All rights reserved
Goals
Maximize product lifecycle of existing
ATM DSLAMs
– Leverage already installed base
– Maximize return on investment
Provide ubiquitous migration strategy to
Next-Generation IP/Ethernet core
– Same for all vendors
– Low impact to existing network
Edge aggregation and interworking
– Minimize impact on existing inter-office
transport
– Allow higher speed service offerings
® Adtran, Inc. 2008 All rights reserved
7
Tier I Business Case
• Scenario One
• Upgrade from DS3 to OC3
• IOF costs $39K per OC3
• Request for 6 OC3s generates the
deployment of a new switch/router
• Scenario Two
• Eliminates new ATM Switch/Router
• Interworks traffic locally, minimizing
IOF costs
• Quantifiable Savings
• $569K per Central Office
• $56.9M per 100 Central Offices
• Frees up multiple DS3 ATM ports
and DS3 IOF facility
Scenario 1: Upgrade of 6 ASAMs in a CO using the
current strategy of ATM/SONET upgrades
6 IOF OC3s to ATM Switch (New Ring)
ATM Switch Cost
ERX Router
EF&I of ATM and Router
IOF for ATM to Router and Router to
LCR
Total Cost
$1,353,707
Scenario 2: Upgrade of 6 ASAMs in a CO using the
ADTRAN TA5000 for ATM/Ethernet Interworking
TA5000 equipped for 7 OC3s
EF&I of TA5000
1 IOF GE to Router and GE card at
Router
EF&I of Router
1 IOF OC3 to ATM Switch
ATM Switch 4-Port OC3 Card
IOF for Router to LCR
Total Cost
$784,366
Total Savings for Scenario 2
$569,341
® Adtran, Inc. 2008 All rights reserved
8
Residential Services
ATM Aggregation and Interworking
– DSL Growth from Node 1 and 2 with
MultiNode ATMoE
– ATMoE for DSL growth
– VP Switching
– Support for 3rd Party GigE Aggregation to
ATM Network IFC
– MultiNode ATMoE Support (Planned)
– Key Features
• Will support Multi-Shelf application
• VPI / VCI to S / C – Tag translation
• IPoA Management
• OC3, DS3, and IMA ATM Aggregation
ATM OC-3 or DS3
Total Access 5000
Alcatel ASAM
DS1 / DS3 / OC3
ATM
Total Access 3000
Router
GigE Node Expansion
1G – 10G
Redundant
TA1148A
DSL Growth
® Adtran, Inc. 2008 All rights reserved
9
ATM Aggregation and Interwork Modules
ATM Aggregation
– ATM DS3 4-Port: Up to 84 DS3s
– ATM OC3 4-Port: Up to 84 OC3s
– Optionally Redundant
ATM DS1 Aggregation
– 32-Port DS1 IMA, 1187803G1
Up to 640 DS1s per system
– 3p Channelized DS3 IMA, 1187220G2
Up to 1680 DS1s per system
– Optionally Redundant
ATM E1 Aggregation (Planned)
–
–
–
–
32-Port E1 IMA, 1188803G1
Up to 544 DS1s per system
Planned 1H 2011
Optionally Redundant
ATM Uplinks
– ATM DS3 and OC-3/STM-1 Single Port
– Optionally redundant
® Adtran, Inc. 2008 All rights reserved
10
Question and Answers
® Adtran, Inc. 2008 All rights reserved
11