SCBDOK - Istat.it
Download
Report
Transcript SCBDOK - Istat.it
New ways of working at Statistics
Sweden – a description with emphasis
… on preparatory sub-processes
Eva Elvers
Statistics Sweden
[email protected]
Outline of the presentation
•
Work during 2007, the Lotta-project
•
New and renewed departments 2008
•
The statistical production process
•
The preparatory sub-processes
•
Some concluding remarks
Work during 2007 – structure
The so-called Lotta-project
•
Standardisation: processes and tools
•
Quality assurance
•
Competence development and
management issues
•
Communication and involvement
Work during 2007 – some areas
•
SOA, Service Oriented Architecture
•
Structured data warehouses
•
Data collection, coding
•
Questionnaires: design, construction, …
•
Editing: several studies
•
Communication of quality with users
•
Process data and metadata
New organisation 2008
New and renewed departments:
•
A new Process Department
•
Dep. Research and Development changed
–
IT and methodological architecture
–
Quality
–
Projects
•
Other changes, e.g.
–
Communication
–
National Accounts
Process department
•
Management
•
Process owners and ‘assistants’
five broad process areas
•
Maintenance and test, models
•
Process implementation
•
Centralised Methodology
•
Centralised IT
How-to-do and support
•
Standard methods and tools – successively
decisions
•
Checklists – tool and assistance
•
‘Business Operation Support System’ (BOSS)
initiated; general texts and checklists first
•
Networks
•
Respond to questions, suggestions, …
•
Implementation order?
•
Develop
SCB
The statistics production process
Evaluate and feed back
8
Establish
user needs
Plan and
design
Build and
test
Collect
Process
Analyse
Publish and
communicate
1
2
3
4
5
6
7
Support and infrastructure
Here emphasis on
processes 2-3
2. Plan and design - process
•
Design a new survey
(production process)
•
Re-design an existing survey
•
Continuous improvements;
adjustments for a new
production round/year
Choose, allocate, and plan
•
Choose methods and tools within each
process based on recommendations, and
•
also so that they fit together, for
the whole production process
•
Allocate resources between processes –
how?
•
Plan production flow, staff and times
Knowledge needed
… for choices and for improvements
Process data (paradata)
•
Quality – indicators
•
Costs
Study Q/C - relationship
Q: value added – measure?!
Influence on quality components, e.g. accuracy
3. Build …
… according to design
•
Questionnaire
•
Production tools: Use or adjust
existing tool or develop tool, if needed
•
Communication between tools, so
production flow
… and test
– what?
•
Questionnaires
•
Production tools
•
Production flow
•
Pilot test/study
Test – in what senses?
Different methods and competences:
•
Statistical methods
•
Qualitative methods
•
IT
Exchange between these three:
•
how-to-think
•
methodology
•
concepts
Concluding remarks
•
Great and important changes
•
Communication vital, ‘all’ directions
•
Development continues
•
Implementation
•
Preparatory sub-processes
started and on their way