JRA1 Status Update - Internet2 Mailing List Service
Download
Report
Transcript JRA1 Status Update - Internet2 Mailing List Service
Connect. Communicate. Collaborate
JRA1 Status Update
Stephan Kraft, RRZE FAU Erlangen-Nürnberg
JRA1 Montpellier Meeting, October 2006
D&M Status [1]
Connect. Communicate. Collaborate
• DJ1.0.1- Plan for Transition of JRAX into Production
Service
– Providing a Multi Domain Monitoring Service
• Focus on user groups
– NOC/PERT
– Project Members
– End Users
D&M Status [2]
Connect. Communicate. Collaborate
• DJ1.3.2- Phase II – Implementation Report (sent
to the EC)
– Second set of services and GUIs
• Measurement Point Service (MP)
–
–
–
–
SSH/Telnet MP
Trace file Capture MP (TCMP)
Available BandWidth (ABW) MP
SNMP Measurement Point
• Lookup Service (LS)
• Relational Database Measurement Archive Service
(RDB MA)
• Authentication Service (AA)
Work Status [1]
Connect. Communicate. Collaborate
• Visualisation tools
– The CNM tool has been extended with a zoom
functionality
– PerfsonarUI v0.08 is available
– Several weathermaps to display delay information have
been produced for discussion
– JRA4 CBF has developed a visualisation tool presenting
the E2E L2 circuit status using a perfSONAR interface.
– The BWCTL web tool has been made available to the
NREN NOCs community via login/password.
Work Status [2]
Connect. Communicate. Collaborate
• Services
– First production release of perfSONAR including the Java RRD MA
and the Java LS (single domain).
– Revision of the RRD and RDB MAs. They now include results
codes.
– Revision of the Lookup Service including result codes.
– MA and an MP are providing L2 status information to the JRA4 E2E
visualisation tool and have been deployed on GÉANT2.
– A common L3 topology database schema has been established
between JRA1 and SA3.
– RRD MA service migration from previous version to the perfSONAR
release 1 have encountered difficulties. The feedback will be taken
into consideration when improving the installation scripts.
Work Status [3]
Connect. Communicate. Collaborate
• Metric Composition Framework
– Additional measurement and analyses on delay
concatenation have been conducted. The results seem
to indicate that we can really neglect any sophisticated
composition procedure for OWD on trunks that are
loaded at even 25%, and just sum the means.
– A proposal for a dashboard has been provided. The
dashboard aims at providing an at a glance view on
parameters (data aggregation).
Work Status [4]
Connect. Communicate. Collaborate
• RRD MA
– LS registration.
– Result code.
– work with the latest available version of XML database, eXist
– publishing measurement data
– accepting and writing measurement data
• SQL MA
– wrapper around a SQL database to provide historical information
– LS registration.
– Result code.
– Used for L2 status information.
Work Status [5]
Connect. Communicate. Collaborate
• Measurement Tools
– Hades MA released (perl version)
• Runs as daemon process
• Accessible via perfSONAR UI
• Modular design (“plug in” of other data sources (RIPE TTM)
possible)
– OWAMP MP
• On demand Hades realized as OWAMP MP prototype
– BWCTL MP released (perl version)
• Installation process simplified
• Enhanced PHP-based Web client available
– BWCTL MA
• Prototype ready
Work Status [6]
Connect. Communicate. Collaborate
• Measurement Tools
– First application based on packet capture cards (DAG and MAPI)
• TC Measurement Point
• ABW
– SNMP MP
• Beta for download and trial
• SNMP get and OID discovery
• Collaboration with RNP
– Alcatel NMS MP
• Retrieve SES, ES, UAS from Alcatel equipment
• Discovery of wavelength ID
– Netflow
• Nertflow MA implementation has started.
• Test of anonymisation tools.
Work Status [7]
Connect. Communicate. Collaborate
• Web.
– Relaunch of http://www.perfsonar.net/
• Wiki
– Restructuring of the wiki
– JRA1 page
– http://monstera.man.poznan.pl/jra1-wiki/index.php/JRA1_Main
• List of work areas
– Please update yours following the structure.
Timeline
Connect. Communicate. Collaborate
• Important dates
Connect. Communicate. Collaborate
• November 30st - MJ1.3.3 – Phase III - Implementation
Milestone
• 8th – 12th of January – GN2 all activity meeting and JRA1
activity meeting.
• January 31st - DJ1.2.4 – perfSONAR AA Service
Specification
• February 28st - DJ1.3.3 – Phase III - Implementation
Report
• Meeting Objectives
•
•
•
•
•
Connect. Communicate. Collaborate
MCF
Tasks status update
Functional testing
Produce rules on dissemination practices
Find out how to allow users to make use of the
infrastructure deployed
• MDM
• Agenda
Connect. Communicate. Collaborate
• http://wiki.perfsonar.net/jra1-wiki/index.php/061002-JRA1WS