Graduated Environmental Management System
•
•
•
•
•
Move from Access to SQL Database
Electronic permitting
Electronic data deliverables (EDD)
Develop standard reports (EPA, templates)
Integrate four GPC databases into one expandable
data model (UIC, USGS, GPC, CBM)
• Use a Role based security model
• Use of .NET technology
• Interface with National UIC Database
EPA National UIC Database
Integrated Project Team (Wyoming Experience)
• WY GEM data model was developed concurrently
• Tables/fields were easily integrated prior to any code
• Both parties learned from each other
• WY will be ready to flow data to EPA CDX NLT July 2007
GEM Interface
Security Model
GEM Apply for Permit
DEQ Review
Document Management System
Monitor Reports
Monitor Report (Selected by Company)
Permit Application Materials