Transcript WISH LISTS
WISH LISTS
GHS
Remodel Office area
w/AC
Install building wide
phone system
w/voicemail
Repair/Replace
auditorium seating,
ceiling, AC, audio
system
Redesign main
entryway
of football field
Add locker room N end
of Ftball field
Pave gravel area on
step
Rekey interior of
building
Add new press box,
restrooms,
concession, east side
Add equipment storage
and
multipurpose/wrestling
room
Extend curbing around
SS Blvd
Replace existing
poles/lights on football
field
Replace aging student
desks/chairs
Fix/replace roof leaks
Expand existing track
AC entire building
Resurface floors in RR
– add Exhaust
Repair pool area
walls/repaint pool
Repair ceiling in Thiel
Gym
Replace asbestos
floor tile
Add restrooms to
existing weight training
room
Replace interior
lighting controls
w/motion detection
sensors
Pave parking area
around fields
Remove cabling/posts
along SS Blvd
Add covered portico
from main gym to
locker room
Enlarge parking lot
near LC
Churchill
Add football locker
room, equipment
storage, 4 classrooms,
auxiliary gym
Add fence along Mary
Street
Sand & seal stage
floor, replace carpet
down runways in
auditorium
Renovate all
restrooms
Replace floor tiles in
hallways & some
classrooms
Update building
electrical to
accommodate new
technology
Add driveway on S
side of bldg for bus
traffic only
Paint metal or replace
on west side roof
Add landscaping in
front of building
Repair roof over
auditorium
Lombard
Concrete work needed
around building
Heat issues in the
1939 building to be
addressed
New performing arts
wing
New labs and sinks in
science lab 7th grade
Upgrade the track
Repair AC/Heating
system in 8th grade
wing
Upgrade in library
Update wiring in older
building
Repair emergency
room buttons & clock
system
Gale
Change office layout
Improve appearance
of entrance to building
Addition of auxiliary
gym
AC throughout
building
Replace cafeteria
tables
Upgrade phone
system
Phone access in each
room
Concrete work front
sidewalk/entrance
Improve air circulation
in classrooms
Increase size of
computer lab
Improve outside
lighting for security
Additional copiers
Additional classrooms
needed due to
population increase
Add copy room,
teachers lounge,
meeting room
Add electrical outlets
in classrooms
Install outside
cameras
Addition of another
entrance/exit to Gale –
traffic flow problems
Replace boiler
Clocks
Replace lighting in
gym
Replace floor tiles in
copy room and in vault
area
Paint or replace metal
on outside of building
Renovate restrooms
King
Alternative Gym
Natural ceiling lighting
Phone upgrades
Copy center upgrades
– AC/upgrade
electrical
Electrical upgrades
throughout the
building
AC throughout
building
Faculty lounge
Communication
system upgrades
Need for designated
drop off in S parking
lot
Noise reduction in
hallway
New teacher
workstations
Additional Exterior
lighting on the
playgrounds
Window upgrades
Ceiling fans in
classrooms
Video security
upgrades
Move office to the
front of the building
Additional rooms
needed – classrooms,
meeting rooms, data
Nielson
Install AC
Improved circulation
within the pod areas
Renovate main
restrooms
Add Landscaping in
the front of the
building
Roof repairs/pitched
roof needed
Additional electrical
outlets
Telephone access to
each classroom
Extend parking lot on
the N side of the
building
Upgrade exterior
lighting on playground
Add additional
classrooms and
general use space for
increasing population
by adding a 2nd floor
Move office area to
the front of the
building
Additional
multipurpose room
Steele
Install AC
Improve circulation in
pod areas
Move office areas to
front of the building
Phone lines
throughout the
building
Update electricity for
new technology needs
Renovate main
restrooms
New roof
Additional classrooms,
offices for instructional
services
Additional security
cameras installed
Building an additional
gym/fitness center
Lighting on
playground upgraded
Silas Willard
Replace floor tile in
several classrooms
Repair/replace cement
steps E of gym and
back of stage
entrance
Locate & reactivate
ceiling vents in 2nd
floor
Update electrical
systems for
modernizing
technology
Add windows that
open in stairway to 2nd
floor
Sand and reseal gym
floor
Renovate all
restrooms
Upgrade exterior
lighting around
building/parking lot
Build walls in office
area for
nurse/principal
Install lockable
furnace
Install electronic sign
Communication
upgrades to
classrooms/office
Add 25 lockers
@rooms 104, 105,
110
Replace carpet in
building
Add ramp for
handicapped access
from E gym to main
floor
Open up lab and
library areas
Install AC
Repair/replace
wallpaper upper level
of gym
Repaint interior walls,
ceilings, stage area
Install ceiling fans in
classrooms
Security upgrades
outside of building
Copy center upgrades
Install additional
proximity card
entrance door on all
outside doors
Install better lighting
on stage
Window access in
basement EBD room
#4
New teacher
workstations
Remove carpet and
install rubber like
stairs for stairway and
entrance hallway
Install larger canopy at
entrance off parking
lot
Technology
Need for more space
for labs, repairs, etc
Install high speech
fiber optic cabling
between buildings
More training time for
technicians
Connect district to
internet at much faster
speed
Allow students to have
internal email
addresses
Automate exchange
date between all
server with SIF
Add additional storage
for computer files
Additional staff
Give each child a
laptop and support
Frequent meetings
with department
heads, principals to
better serve the needs
of staff/students
Wireless in every
classroom, additional
power, video
conferencing,
telephone
Have inter district
television station we
could broadcast
events to every
classroom